Cuestiones
ayuda
option
Mi Daypo

TEST BORRADO, QUIZÁS LE INTERESEPP 2024

COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del test:
PP 2024

Descripción:
Test de pp para 2024

Autor:
AVATAR

Fecha de Creación:
21/03/2024

Categoría:
Universidad

Número preguntas: 79
Comparte el test:
Facebook
Twitter
Whatsapp
Comparte el test:
Facebook
Twitter
Whatsapp
Últimos Comentarios
No hay ningún comentario sobre este test.
Temario:
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question Production order Planned order Scheduling agreement schedule line Purchase order.
How can you characterize dependent requirements in material requirements planning? Note: There are 2 correct answers to this question They are created on assembly level during the planning run They are created with exact times in Advanced Planning They are created when an independent requirement is created for the finished product They are only created for multilevel bill of material (BOM) structures.
What are the options if the Dispatched operation status is set for a production order operation? Note: There are 2 correct answers to this question You can reschedule the operation using infinite scheduling in a planning table You can reschedule the operation using lead time scheduling You can reschedule the operation using finite scheduling in a planning table You can reschedule the operation in the Manage Work Center Capacity app.
You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend? Consumption-Based Planning Subassembly Planning Advanced Planning Material Requirements Planning.
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question Order type Requirements type Planning strategy Requirements profile.
You want to use capacity availability checks for production orders. Which settings have to be made for this? Not: There are 2 correct answers to this question The scope of check must be defined in Customizing The Relevant for Finite Scheduling indicator must be set An overall profile must be assigned in the checking control A checking rule must be assigned to the work centers.
You are trying to create a production order and NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question. NO production lines are assigned to the production versions NO bills of material (BOMs) are assigned to the production versions The order lot size is NOT within the validity range of a production version All production versions for the material are locked.
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note. There are 2 correct answers to this question Resource hierarchy Resource network Resource matrix Resource selection.
What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question Status Installation point Scrap percentage Quantity.
You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have? Note: There are 3 correct answers to this question. Define a suitable process in the production data structure Define a handling resource in the location mester Define a transportation lane and carrier selection in the location master Define a separate inbound resource in the product master Define a goods receipt time in the material master.
How can you set up the supply source for the Kanban process in SAP S/4HANA? Note: There are 3 correct answers to this question Use stock transfer reservations for stock transfer Use quotations for internal and external procurement Use purchase orders for external procurement Use purchasing costs for automated source prioritization Use run schedule quantities for in-house production.
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question Assign the overall profile to the authorization profile. Create an object selection variant for production-planning-related alerts Assign the alert profile to the overall profile Create an object selection variant for priority-category-related alerts.
In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order? MRP creates the capacity requirements without considering existing load on the work centers MRP assigns the capacity requirements automatically to work centers with the earliest available capacity MRP creates the capacity requirements at the earliest possible time MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.
Where does the system check mester data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question In the MRP controller In the routing In the bill of material (BOM) In the work centers In the production version.
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question Net requirements calculation is carried out for every sales order individually Both the reduction of make-to-order stock and requirements occur on delivery. Storage location MRP areas are required for sales-order-specific stock. Sales orders have to be ATP-confirmed (available-to-promise) to be saved Production orders are created with sales order reference.
Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question Integrated Business Planning (IBP) Material Requirements Planning (MRP) Supply Chain Management (SCM) Capacity Requirements Planning (CRP).
You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question Create in Kanban process Convert a purchase requisition Create without material Create by order release.
Which information is required when you create a product master in SAP S/4HANA? Note: There are 2 correct answers to this question Base unit of measure Product type Industry sector Selection screen for views.
Your company manufactures materials whose specifications differ for each manufacturing process. Which application do you have to use in SAP S/4HANA to be able to track and use this information in all areas of logistics? Batch management Process order management Engineering change management Quality management.
When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly)? When you deliver a sales order When you create a sales order When MRP creates a planned order When MRP creates a dependent requirement.
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question Material type MRP type Procurement type MRP group.
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? Production by lot size (30) Assembly processing with production orders (82) Planning with final assembly (40) Planning at assembly level (70).
What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question Reduced delivery times Option to forecast planning for production resources Option to use make-to-order production Reduced times for final assembly.
Why would you use phantom assemblies? Note: There are 3 correct answers to this question To increase the number of planning levels To reduce the number of material masters To simplify the structure of bills of material To reduce the number of changes required in bills of material To make the assignment of components easier.
What are the key features of using a low level code? Note: There are 2 correct answers to this question To determine the sequence in which materials are planned in MRP To determine the use of subitems inside material BOM (bill of material) To determine how costs are rolled up by product costing To determine the priority of alternative components inside ATP.
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use? Planning without final assembly (50) Assembly processing with production orders (82) Planning with final assembly (40) Make-to-stock production (10).
Which of the following processes lead to an entry in the MRP planning file? Note: There are 2 correct answers to this question Changing the procurement type in the product master Changing the storage bin in warehouse management Changing the delivery address in transportation management Changing the stock in inventory management.
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question BOM header status Lot size Manufacturing date BOM component status.
Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question Run MRP with automatic selection of production version Assign planned orders manually in the planning table Run MRP with quota arrangement Run PP/DS heuristics for repetitive manufacturing.
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question Create associated capacity requirements Update statistics for the Business Information Warehouse Reduce run schedule quantities Create a data entry document Post production costs to the planned order.
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note. There are 2 correct answers to this question Set the creation indicator for delivery schedule lines on the initial screen of the MRP run Add the agreement to the quota arrangement and mark it for MRP relevance Set the creation indicator for purchase requisitions on the initial screen of the MRP run Add the agreement to the source list and mark it for MRP relevance.
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components. one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible.Which settings do you make to achieve this? Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator.
How would you define pegging in the context of Advanced Planning? An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements and stock An evaluation to identify overstock situations in the balance between the receipt and the issue elements after the production planning run.
How can you support a GMP (Good Manufacturing Practice)-compliant production process? Note: There are 3 correct answers to this question Approved resources GMP-compliant flag Recipe approval Batch record Digital signature.
What is the difference between co-products and by-products? Note: There are 2 correct answers to this question Only co-products have a non-zero inventory valuation Only co-products appear in the process or production order settlement rule Only co-products have movement type 531 Only co-products have movement type 101.
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question Reduce the planning time interval Determine a time period with available capacity on the planning board Form optimum sequences to reduce setup times Execute an infinite production planning run for the critical resources Increase the capacity supply in a time-phased interval.
What could be the reason for multiple commitments, where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question The Finite Scheduling indicator is NOT set in the strategy profile The Change Planning Direction indicator is set in the strategy profile Alternative work centers are fully occupied The work center has several individual capacities.
During production order creation, several valid production versions are found. How does the system choose the production version? Alphanumeric or quota arrangement Validity period or sales order Lot size or material cost Planned order or material number.
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA When can you use mode selection? When alternative resources are used within one operation When several production versions are maintained for one product When multiple planned orders are scheduled in parallel on one resource When several operations are maintained for one product.
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA? Note: There are 2 correct answers to this question Simultaneous 100% check Manual maintenance First in first out (FIFO).
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question The same base unit of measure is used The same batch management level is used The quantity and value updates are the same The same account category is used.
What options does a planner have in the planning table for repetitive manufacturing? Note: There are 2 correct answers to this question Dispatch operations to work centers Create new production quantities Reschedule and deallocate operations Change the assignments of production quantities.
What are the advantages of collective orders? Note: There are 2 correct answers to this question To post confirmations for the entire collective order To coordinate orders in the planning board for a collective order To show the flow of batches across the entire collective order To perform availability checks across the entire collective order.
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question Processing time Wait time Float before production Setup time Pick time.
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past? Kanban Material requirements planning Backflushing Production order release.
How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question Select a special procurement type inside the material master Define the special procurement type inside the material BOM (bill of material) Select a special MRP type inside the material master Use a special item category in your material BOM (bill of material).
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question Planned delivery time In-house production time Operation duration Total replenishment lead time.
Advanced Planning uses master data from SAP S/4HANA. In which data objects can you set the Advanced Planning flag? Note. There are 2 correct answers to this question Work center Production version Material Plant.
Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question Routing Production cost collector Production version Repetitive manufacturing profile.
Why do you use Engineering Change Management? Note: There are 2 correct answers to this question To monitor and document object changes To save multiple changes for an object To monitor and document table changes To enable integration into a sales order.
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement? The MRP run plans the material only if a quotation has been maintained The MRP run does NOT consider the material, it has to be planned interactively The MRP run assures external procurement The MRP run assumes in-house production.
What information do you have to maintain to define the relationship between supply source and demand source in the Kanban process? Note: There are 2 correct answers to this question Work Center Replenishment strategy Routing Production supply area.
Which business processes are affected by settings in the order-type-dependent parameters? Note: There are 2 correct answers to this question Select master data Define integration with cost accounting Schedule production orders Check material availability.
Your production planners are allowed to execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)? Use a resource group Use a planning area Use a planning group Use a propagation range.
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question Work item WBS item Non-stock item Variable-size item.
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching line coincides with an operation that has previously been dispatched. How does the insertion take place? The previously dispatched operation stays as is, the new operation is inserted after the dispatched operation The new operation is inserted at the desired time; the previously dispatched operation is moved forward The new operation is inserted at the desired time; the previously dispatched operation is moved backward The previously dispatched operation stays as is, the new operation is inserted before the dispatched operation.
What are the prerequisites for a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question Defining the operations as reporting points using the control key Activating the reporting point backflush in the work centers Activating the reporting point backflush in the order dependent parameters Defining the relevant work centers in the routing.
How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question By capacity planning By order release By order confirmation By mass processing.
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers to this question Forecast key figures Purchase orders Safety stock Maximum stock level.
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select? Find slot Schedule in working time only Squeeze in Insert operation.
For production orders, cost object controlling (COC) can be carried out on an order-related or productrelated basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question Product-related COC is used in manufacturing for co-products Order-related COC is beneficial in a flexible production environment In order-related COC, individual production orders do NOT have cost segments In product-related COC, all costs are debited and credited to a product cost collector.
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question What status does the BOM have? Is the material type allowed in the BOM? Which base unit of measure does the material have? In which storage location is the BOM required?.
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question The assigned routing must be a rate routing The assigned routing and bill of material (BOM) must be valid in the entire validity period The deletion flag must NOT be set for the bill of material (BOM) or the routing The lot size range must be within the lot size range of the assigned routing The assigned routing must NOT have alternative sequences.
What does a line hierarchy in repetitive manufacturing represent? A production line with prioritized alternative work centers A production line with a parallel sequence in the routing A production line with more than one work center A production line with an alternative sequence in the routing.
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you parameterize this in the strategy profile? Specify a negative offset time Specify a negative planning horizon Specify a negative PP/DS horizon Specify a negative opening period.
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question Material master Routing Work center Production version.
Which chart types does the labular planning table for capacity planning provide in SAP S/4HANA? Note: There are 2 correct answers to this question Order (pool) chart Capacity requirements chart Orders (dispatched) chart Work center capacities chart.
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement? Fill up to the safety stock level Fill up based on the lot size procedure Fill up to the reorder stock level Fill up to the maximum stock level.
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question Opening period Float after production Setup time Total replenishment lead time.
What does the material type influence? Note: There are 2 correct answers to this question Whether the material is produced in-house, procured externally, or both Which plant-specific and plant-independent statuses are allowed Which material master screens appear and in which sequence Which document types and class categories are allowed.
What time element of midpoint scheduled operations can be reduced by reduction strategy sellings while dispatching? Note: There are 2 correct answers to this question Teardown time Queue time Setup time Move time.
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question By material status By material type By period By plant.
What can you use standard heuristics in Advanced Planning (PP/DS) for? To solve planning problems for defined objects To optimize costs and times in production plans To automate material movements in material staging To set default values in production master data.
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question Direction Scheduling control Fixed pegging Planning mode Finiteness level.
In your plant, MRP is activated.Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question Use a specific material status Use a specific material group Use a specific MRP list Use a specific MRP type.
What is a work center hierarchy in capacity planning? A group of alternative work centers for production, structured in hierarchy levels by priorities A group of work centers in a production line being used in sequence for production A group of alternative work centers providing a cumulative available capacity for production A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel.
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question Past production planning quantities Past quotation quantities Past sales order quantities One-off events Markel intelligence.
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stacks? Note: There are 2 correct answers to this question Use batch derivation Use batch determination Use the batch where-used list Use the Batch Information Cockpit.
Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question You can use the production scheduling profile to automatically set orders to technically complete You can use mass processing to read PP master data for production orders You can use trigger points to automatically create rework orders via confirmations You can use mass processing to set production orders to technically complete.
Denunciar test Consentimiento Condiciones de uso