1. In project profile I can assign: a) Simulation profile b) Configure proyect stock c) Settlment profile (perfil si norma no) d) Standard WBS.
2. I can create a Project: a) With WBS elements and Networks b) With WBS elements assigned to different CO Areas. c) With WBS elements assigned to differntes Company Codes d) With WBS elements assigned to different profit centers e) With only WBS elements.
3. With transacction can i use to assign or modify Budget? a) Cjr2 b) Cj42 c) Cj20N (with network) d) Cj30.
4. When I check “automatic subsitution” in “Create subsitution” transaction, this means that if the substitution is well configured, it will be executed automatically when the user saves the Project in the CJ20N transaction, without further configuration. a) True b) False.
5. Status field selection: Enables you to show, hide and define tittles for individual tab, pages, and display symbols for tab pages. Also, the flexible detail screens created refer to a Project profiel. a) True b) False.
6. If WBS element is statistic, this means that I can allocate actual cost to two objects for example, a vendor invoice posted to the center and the WBS element at once. a) True b) False.
7. System status and user control whether businnes transactions are permitted or prohibited. a) A transaction is permitted if at least one status permits it and no status prohibits it. b) A transacction is prohibited if one status prohibitis it. c) A transaction is permitted it at least one status permits it and one status prohibits it. d) A transaction is permitted but a warning issued it at one status permits it and no status prohibits it.
8. A Project definition is: a) An account assignment object. b) A neutral work breakdown structure. c) A billing object. d) A planning object. e) Not an account assignment object.
9. Different ways of creating networks. Choose the correct answer(s): a)Direct Method: Project builder. b) Indirect Method: Create WNS with activities. c) Indirect Method: créate network. d) Direct Method: Assembly processing. e) Direct Method: Project planning board and simulation.
10. Project currency. Choose the correct answer(s): a) If the controlling área and Company code have different currencies, then you need to specify the same object currency for the work breakdown structure as the one of the Company code. b) If the controlling área and Company code have the same currency, the Company code currency is the Project currency automatically. c) The system defaults the currency from the Project definition as the object currency for each newly created WBS element. d) You can change the object currency for a WBS element in the organizational data for the WBS element, provided no costo or payments have been posted yet in the WBS element.
11. When I post a document in WBS element. The system saves the amount of this document with three currencies: a) Transaction currency, Project currency, object currency. b) Object currency, Contrilling area currency, Project currency. c) Transaction currency, Object currency, Controlling area currency. d) Controlling area currency, Transaction currency, Object currency.
12. Simulation version: Mark the correct statements: a) In CJ20N transaction I can’t create a simulation version. b) In CJV4 I can create a simulation version. c) In CJV4 I can modify the Project structure in the simulation version. d) Cost element reports do not support simulation version.
13. CO planning version are used to plan which of the following? a) Dates and times. b) Cost and bugdet. c) Cost and revenues. d) Snapshots.
14. CO versions can be changed: a) True. b) False.
15. I can copy actual cost in a WBS element, to CO version. This means that I can replace the planned cost with the actual cost in a CO version. a) True. b) False. .
16. Working with Simulation versions. Choose the correct answers(s): a) You can create multiple simulation versions for a porject. b) You can compare simulation version for a porject. c) You can create simulation version and CO version automatically in one step. d) You can’t transfer Work Breakwown structures.
17. In Hierarchy graphic I can: a) Create new WBS elements. b) Modify stucture. c) View the relationships. d) Delete WBS elements.
18. Project Coding Mask Editing: a) You can maintain blocking standart structures with checkbok (LkS). b) You can maintain blocking operative structures with checkbox (LcK). c) You have 5 characteres for Project ID. d) You have only 3 characters for Project ID.
19. Standart Network Structures. Choose the correct answers(s): a) Standart network can have more than one alternative. b) The header of a standard network contains different data to the hearder of an operative network c) You can`t start by creating an operative network (with template) d) Materials are assigned by means of material BOMs and estándar BOM e) You can start by creating an operative WBS (by coping a template and all this activities).
20. Validations: During the check, the values select using the prerequisite checked, if the statatement is true, the validation is carried out. If the checked statement is false the system issues a message. a) True b) False .
21. When I want to view GANTT chart of my Project, I can enter with: a) Project planning board. b) Hierarchy Graphic. c) Network Graphic. d) Structure Planning.
22. Milestone functions in a network. The following milestone functions exist: a) Release subsequent activities. b) Include a standart network. c) Finish a workflow task. d) Delete a network. e) Create a network.
23. Milestone in the WBS: a) The Sales Document Date indicator gives you the option of linking a milestone with a date in the billing plan. b) In progress analysis, each milestone corresponds to a percentage of work completed. c) You can link milestone with a purchase order. d) You cannot link milestone with an activity or WBS element.
24. Which of the following determines the order in which activities are carried out? a) Time. b) Cost. c) Personnel. d) Relationships. e) Budget.
25. In Project Builder I can archive Cost Plan: a) Directly in WBS element. b) Yes, If select CO versions when I open the Project. c) Only I can have planned costs in Milestones. d) In Activity cost.
26. Each network has unique identification that is assigned always automatically by the system depending upon the network type (internal number assignment). a) True. b) False.
27. I can allocate the same actual cost to a profit center and to WBS element at a time. a) True b) False.
28. Working with activity elements. Choose the correct answer(s): a) Types of activity elements include internal processing elements, external processing elements and general costs elements. b) All activity elements have a date reference to the activity to which they are assigned. c) The activity elements themselves do not affect scheduling. d) The activity alements do no have any relationships or durations e) Materials are assigned to activity elements.
29. You can assign objects to operative WBS elements to carry out additional functions that may be in other applications of the SAP system. a) Standard Milestones. b) Billing plans. c) Investment program. d) Documents and texts. e) Project team to use persons from this team when distributing work at the activity level.
30. Currency in CJR2 corresponds to: (only only is the correct): A) Co area currency. B) Transaction currency. C) Object currency. D) Network currency.