Cuestiones
ayuda
option
Mi Daypo

TEST BORRADO, QUIZÁS LE INTERESETest_hk4

COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del test:
Test_hk4

Descripción:
Test_PP

Autor:
hook21
(Otros tests del mismo autor)

Fecha de Creación:
05/10/2019

Categoría:
Deportes

Número preguntas: 80
Comparte el test:
Facebook
Twitter
Whatsapp
Comparte el test:
Facebook
Twitter
Whatsapp
Últimos Comentarios
Ragdf ( hace 4 años )
Hola, podrías confirmarme si estas son las preguntas del diecisieta cero nueve?
Responder
hook21 ( hace 4 años )
En teoria sí
Temario:
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the following actions are also performed by default? There are 2 correct answers to this question. Staging of components for the next order in the sequence Reduction of the capacity requirements Posting of production costs to cost collector Archiving of backflush documents.
For which planning-relevant data objects do you set just one indicator to include then in PP/DS? There are 2 correct answers to this question. Material Production version Work center Plant.
Which of the following functions can be performed when the production order has the status “Created” (CRTD)? A user can schedule a background job to release production orders (transaction COOIS). A user can trigger material staging via mass processing (transaction COHV). A user trigger printing of shop floor paper manually (transaction CO02). A user trigger material availability check via mass processing (transaction COHV).
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question. Use a bucket-oriented capacity check Use multilevel MRP run for the products on the resource Use DS heuristic “Schedule Sequence” Use rescheduling with an alternative mode Use optimization with respect to set-up times.
What are attributes of the SAP S/4HANA Simplification list? There are 3 correct answers to this question. It details transaction and solution capabilities at a functional level It can have a business and a technical impact It contains references to the relevant training material It was created for better planning and estimation of your way to S/4HANA It is only a grouping of related technical simplifications.
Which data object can be updated with the scheduling results of a routing? Material master Production scheduling profile Production version MRP profile.
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA? Contract Production Version Purchasing Info Record Selection Method.
Which elements are included in the structure of the batch where-used list? There are 3 correct answers to this question. Collective orders Stock transfers Transfers from batch to batch Planned orders Purchase orders.
Which technological advances enabled the development of SAP S/4HANA as the digital core? There are 3 correct answers to this question. Capability to add to server landscape and scale Multi core processors enabling parallelism of tasks Advances in the three-tier architecture approach Big and affordable memory Wide adoption of web standards such as Service oriented architecture.
How does the new Inventory Management Data model contribute to the reduction of the data footprint? There are 3 correct answers to this question. By eliminating hybrid tables By eliminating fields for different stock types By eliminating material master tables By eliminating inventory history tables By eliminating inventory tables.
Which SAP solutions are part of the Digital Value Network portfolio? There are 3 correct answers to this question. SAP Fieldglass Concur SAP Hybris SAP Human Capital Management SAP Visual Enterprise.
Which of these are layers in SAP Best Practice content? There are 3 correct answers to this question. Solution packages Configuration guides Process diagrams Scope items Building blocks.
Where can you maintain consumption mode and consumption periods for planning strategies? There are 2 correct answers to this question. In the requirements class In the MRP group In the plant parameters In the material master.
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question. In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material Manually firm all planned orders for materials within the replenishment lead time of the material.
When would you use reporting point backflush in repetitive manufacturing? There are 2 correct answers to this question. When you need to determine the work in progress When goods issues can wait for final confirmation You require an up-to-date inventory for components For production lines with short lead times.
What new technology is used in SAP S/4HANA Embedded Analytics? HANA Live Smart Business Cockpit Multidimensional Reporting client (MDRC) ABAP Managed Core Data Services (CDS).
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics? There are 3 correct answers to this question. Filters Scheduling Forecast Drilldown Sort.
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this? Minimum lot sizing Periodic lot sizing Fixed lot sizing Exact lot sizing.
Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question. Production overview Production list Planning file entries WIP list Operation list.
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”. What does the suffix 001 in the resource name represent? Number of individual capacities Capacity category Work center category Available capacity version.
Which of the following objects can you release so that the business transactions for process order execution and process management can be executed? There are 2 correct answers to this question. Individual process instructions Individual operations Individual control recipes Individual phases.
The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock requirements list. Which of the following will firm planned orders” There are 2 correct answers to this question. Creating a planned order within the planning time fence Assigning a production scheduling profile Manually changing the quantity of a planned order Setting a planning time fence in the Material Master Record.
In a first step you have created master recipes. In which sequence are the additional objects created? Please choose the correct answer. Control recipe Process order PI sheet Process message Process order Control recipe Process message PI sheet Process order Control recipe PI sheet Process message Control recipe Process order Process message PI sheet.
On which of the following levels can you influence the availability check for the components of production orders? There are 2 correct answers to this question Production controller Material master Production order type MRP controller.
Which capabilities does the Alert monitor have? There are 3 correct answers to this question. Generate alerts based on defined threshold values Automatically send alerts with Alert Notification Engine Automatically reschedule in case of overload alerts Automatically predict alerts in future planning cycles Nominate time-dependent substitutes for a planner.
What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question. Material Coverage Fiori app Monitor Production Orders Fiori app Flow manufacturing Lock-free inventory movements Rough-cut capacity planning.
How Is the bill of material (BOM) exploded when you use a BOM explosion number? With respect to a common key date for product and each assembly With respect to defined separate key dates for product and each assembly With respect to a common change status for product and each assembly With respect to a defined separate change status for product and each assembly.
At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated? The requirements date occurs before that of a firmed planned receipt A firmed planned receipt cannot be rescheduled The requirements date occurs that of a firmed planned receipt The requirement no longer exists.
Which process order function uses a resource network? Resource scheduling Capacity leveling Capacity planning Resource selection.
Which warehouse management functions are available in SAP EWM but NOT in SAP WM? There are 3 correct answers to this question. Labor Management Yard Management Slotting Handling Unit Management Expected goods receipt.
In which customizing activity do you set up automatic routing selection for production orders? Define scheduling parameters for production orders Define order-type-dependent parameter Define selection profiles Define production scheduling profile.
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts? Infinite resource and finite strategy Finite resource and infinite strategy Finite resource and finite strategy Infinite resource and infinite strategy.
Which of the following apply to MRP Live? There are 2 correct answers to this question. The sequence of planning materials is calculated across plants. The BAdIs for classical MRP also apply to MRP Live. The definition of the planning scope is more flexible. Planned orders need to be converted to purchase requisitions for externally procured materials.
Which of the following data objects are updated when a user confirms an operation? Warehouse transfer order status Shop floor information system Production order total order quantity Production order header status.
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order. Which is the appropriate planning strategy to use? Production by lot size (30) Make-to-order production (20) Planning with final assembly (40) Planning without final assembly (50).
What are prerequisites for using batch derivation? There are 2 correct answers to this question. Receiver-sender relationships Process instructions Batch where-used list Batch determination selection conditions.
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality? By providing cross-plant planning and deployment By providing future demands from demand figures in the past By providing replenishment proposals with exact times By providing multilevel material requirements planning.
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question. BOM, in the item for the material Material master of the finished product Routing, in the component allocation Work center, in the production supply area.
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use? 10 – Anonymous make-to-stock 20 – Make to order production 50 – Planning without final assembly 40 – Planning with-final-assembly.
Which automotive-specific functionality is embedded in SAP S/4HANA? There are 3 correct answers to this question. Packaging Logistics Equipment and Tools Management Enhanced characteristics based processes Enhanced Kanban Processing Parts interchangeability.
Which of the following is an advantage of MRP Live and NOT available in classical MRP? There are 2 correct answers to this question. MRP Live can priorities demand from sales orders MRP Live can create production orders automatically MRP Live can plan materials with recursive BOMs MRP Live can propose alternative solutions.
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? There are 2 correct answers to this question. The ATP category for restricted-use stock The checking group from the material master The checking control for the order type The checking rule from the business application.
When do you recommend the use of repetitive manufacturing? There are 2 correct answers to this question. Low product stability High product stability High product complexity Low product complexity.
How can you avoid order proposals for planned independent requirements with dates in the past? There are 2 correct answers to this question. Set the requirements reduction indicator in the requirements class Reorganize planned independent requirements Use a planning strategy with requirements consumption Maintain adjustment parameter in the MRP group.
Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question. Capacity planning Supply Network Planning Available-to-promise Backorder processing Demand planning.
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors? There are 2 correct answers to this question. They can be used for manufacturing with collective orders. They can be created automatically during month end process. They can be used for repetitive manufacturing. They can be applied to make-to-stock production order.
How can you enhance the system statuses of a production order scenario with user statuses? By enhancing the system status customizing table with user statuses By creating a user profile and assigning it to the production scheduling profile By activating the user statuses in status and action management By defining a status profile and assigning it to the order type.
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question. Confirmation profile Operation control key Production scheduling profile Scheduling margin key.
In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Cost collector Repetitive manufacturing profile Bill of material Production version.
What are properties of MRP Live? There are 2 correct answers to this question. The code is written in SQL Script It is executed on the database server Data is read sequentially from the database tables It uses the same BAdis as classic MRP.
What are the three transition scenarios for an S/4HANA implementation? There are 3 correct answers to this question. System activation New implementation System conversion Landscape transformation System upgrade.
In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy? Storage Location MRP Indicator Dependent Requirements indicator Mixed MRP indicator Individual/Collective Indicator.
Before a user can add multiple production versions in a material master, what information should be collected? There are 3 correct answers to this question. Lot sizes BOM status Validity dates Work center hierarchy Task list group number.
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Material Master –> Plant Settings –> MRP Group Plant Settings –> MRP Group –> Material Master MRP Group –> Material Master –> Plant Settings Material Master –> MRP Group –> Plant Settings.
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question. Comparison of current data with historical data to identify trends Automatic update of story boards Strategic analysis Real time decision support.
Your customer complains about incorrect duration for production order operations. What time elements could cause the issue? There are 3 correct answers to this question. Tear down time Queue time Move time Floating time Processing time.
Which functional capabilities does the Detailed Scheduling Board have? There are 2 correct answers to this question. Enter time-ticket confirmation for production orders Undo for drag & Drop planning activities Change planned order quantities Change sales order quantities.
What Kanban status automatically posts goods receipt with reference to the procurement element? Empty Full In use Wait.
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning? There are 2 correct answers to this question. Production plant Contract Work center Material master.
Which material-specific information can be transferred to a transportation lane in PP/DS? There are 3 correct answers to this question. Production versions Purchasing info records Outline agreement Special procurement keys Quota arrangements.
Which Kanban master data object controls the relationship between the supply and demand source? Rate routing Control cycle Production supply area Kanban container.
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question. The OLAP system needs to write back the data to the OLTP system Multiple copies of the data exist Batch process are required to keep OLTP and OLAP in sync Only the OLAP system has a predefined subset of the data Only the OLAP system has the latest data.
Which of the following are included as SAP S/4HANA Sales Simplifications? There are 3 correct answers to this question. SAP Revenue Accounting replaces ERP SD Revenue Recognition SAP GTS replaces ERP SD Foreign Trade SAP Sales Support replaces SAP CRM SAP order Fulfillment replaces ERP SD Availability Checking Settlement Management replaces ERP SD Rebates.
In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate? The priority of the proposed solution The viability of the proposed solution The presence of firmed planned orders The presence of production orders.
What steps are possible in a PP/DS production planning run? There are 3 correct answers to this question. Optimization Backorder processing Demand consumption Detailed scheduling functions Heuristics.
Which document is skipped when SAP EWM is embedded in SAP S/4HANA? Outbound delivery request Outbound delivery order Warehouse order Warehouse task.
What are pillars of SAP Activate? There are 2 correct answers to this question. Guided Configuration Premium engagement SAP Best Practices SAP MaxAttention.
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging? It enables the propagation of network alerts across the bill of materials structure It propagates changed sales order priorities to the pegged planned orders It links receipts from an alternative location in case of a shortage in the default location It replaces fixed pegging relationships unless they have been created for stock.
In which material master views can you select the batch management checkbox? There are 2 correct answers to this question. Basic Data 1 Work Scheduling MRP 4 Purchasing.
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders? There are 2 correct answers to this question. Routing header Material master Bill of material Work center.
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? There are 3 correct answers to this question. Engineering Change Record Production Version Routing Bill of Material.
What is the correct sequence of the following Activate methodology phases? Prepare, Realize, Iterate, Continuous Improvement Validate, Realize, Test , Deploy Prepare, Explore, Realize, Deploy Prepare, Validate, Test, Go-Live.
What are some of the SAP Fiori user types? There are 3 correct answers to this question. Business partner Developer Occasional Employee Expert.
What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question. Default values for the item status Default unit of measure Allowed material type Maximum allowed low-level code.
Which of the following is used by the MRP Live planning run in SAP S/4HANA? Net change planning Parallel processing across servers Planning horizon MRP list.
What must be used in the system to plan the requirements for different subcontractors separately? Planning plant MRP areas Production versions Storage locations.
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock? The Planning Strategy of the finished product The MRP Type of the component The item category of the component in the BOM The Individual/Collective indicator of the component.
A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake. What impact would this have to other users for this specific production order? The production operator cannot enter additional confirmations The warehouse clerk still carry out goods issue transactions The buyer can still see component reservations The production manager can still see the capacity requirements.
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created? Vendor rating Delivery date Quota arrangement Component availability Costs.
Which task list types can have parallel sequences? There are 2 correct answers to this question. Master recipes (2) Rate routings (R) Reference operation sets (S) Routings (N).