Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question Plan repair work for the responsible work center Assign a production resource tool (PRT) to the operation Complete the malfunction report Verify planned and actual costs Find malfunction records already created in a list.
How can you assign a material BOM to a piece of equipment? Via field model number in the equipment master Via material BOM header in the serialization data Via creation of an equipment BOM Via field construction type.
You want to display vehicle-specific data for a piece of equipment. How do you proceed? Set the relevant flags in Customizing activity "Define Additional Business Views for Equipment Categories". Assign a view profile to the combination of vehicle type and equipment category. Assign a view profile to the combination of equipment category and vehicle class. Assign a view profile to an equipment category for fleet equipment.
What do you have to consider regarding a cross-plant planning scenario? Multiple maintenance plants are assigned to a planning plant (n: 1). Only a maximum number of five maintenance plants can be assigned to a planning plant. Multiple planning plants are assigned to a maintenance plant (m: 1). It is only possible within the same company code.
You schedule a Maintenance Service Plan. Which call object is generated? Maintenance Order which is linked to a Service Order Header Customer Service Order with assigned DIP profile Customer Service Order with an external order operation Maintenance Order which is linked to a Service Order Item.
What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to this question? It is based on an SAP Fiori tile catalog. It provides only HTML5-based apps It can be assigned directly to the user via personalization It is assigned via a portal role.
You want to implement SAPUI5 apps in your SAP Fiori Launchpad. Which are mandatory elements? Note. There are 2 correct answers to this question? Web Dynpro Apps Transactions Catalogs Tile Groups.
What can be determined using the offset within a maintenance strategy? Note: There are 2 correct answers to this question. The first due date of a maintenance package A one-time shift of a maintenance package A preliminary buffer shifting the reference date of the maintenance order The call date for the maintenance order.
What are characteristics of the structure indicator? Note: There are 2 correct answers to this question It limits the types of characters in the edit mask to Alpha and Numeric. It restricts the number of hierarchical levels to no more than 6 It defines the allowed characters for a functional location It sets the hierarchy levels of the functional location structure.
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question Assign a measuring point as a production resources/tools (PRT) to a task list operation. Assign a piece of equipment with an allocated measuring point to a task list operation Assign an inspection lot to the task list header Assign an inspection document as a PRT to the task list operation.
How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process? It always uses the risk-based assessment for prioritization It is a new business object with no connection to a maintenance notification It is mandatory to assign a task list to the maintenance request It contains an additional screening phase where requests can be accepted or rejected.
A Task List contains two operations: • Every 3 MON: pump inspection • Every 24 MON. pump replacement When replacing the pump, the operation pump inspection will be ignored. How can you achieve this? Assign different hierarchy levels Set the lead float Create a task list hierarchy Create a cycle set sequence.
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time-key date. The orders should be called 3 months before the planned date. How can you set up the maintenance plan? Note: There are 2 correct answers to this question Set the call horizon to 25%. Set the call horizon to 75% Set the offset to 3 months Set the call horizon to 90 days.
How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question Through Best Practices scope items 4HH and 4HI. Phase-based maintenance is always active in all S/4HANA 2021 editions and above By installing the corresponding enhancement pack and activating the related business function By manually activating the corresponding Business Feature in case Best Practices are not used.
You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct answers to this question The individual maintenance of the cost center in the equipment master record The reference functional location of the superior functional location The cost center of the superior equipment The cost center of the related maintenance work center.
What is the goal of embedded analytics in SAP S/4HANA? To integrate BW Data Store Objects To combine transactional and analytical processing To allow both tactical and strategic analyses within the S/4HANA core To integrate BW Info Cubes.
How do you map a counter replacement in SAP S/4HANA Asset Management? Deactivate the current counter and create a new counter. Create a new measurement document marked as a counter replacement. Create a new measurement document and assign a valuation code for counter replacement. Assign a catalogue type for counter replacement to the measuring point category.
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question. SAP Crystal Reports Plant Maintenance Information Systems (PMIS) SAP Lumira SAP Quick Viewer.
What happens if you change the primary key of a functional location? The user must define a new labelling system for the new primary key. The functional location is immediately assigned to a new superior functional location when the new label is entered. Changing the superior functional location via alternative labeling is not possible. The user must decide whether the functional location is assigned to a new superior functional location.
You want to create a maintenance order with an external order operation that includes service items. How can you achieve this? Note: There are 2 correct answers to this question The usage of a model service specification is mandatory. The assignment of a control key with the service indicator set is mandatory The actual value entry can be recorded only via the service entry sheet The assignment of a control key with key externally processed operation is sufficient.
How does a performance-based maintenance plan calculate the interval between start date and planned date? Cycle length divided by (monthly performance x 12) Cycle length divided by annual performance Cycle length divided by ((scheduling period) x (cycle modification factor)) Cycle length divided by (annual performance/365).
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question? Display approved purchase requisitions for which purchase orders have been generated. Display approved purchase requisitions for which NO purchase orders have been generated Analyze overdue maintenance orders that have NOT been finally confirmed Analyze confirmed maintenance orders that have NOT been settled. Analyze maintenance orders that are still in planning and have NOT been released.
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question Cancel status Released. Change the pronty Book a goods receipt. Change the estimated costs.
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question Within a maintenance order In the list editing (single-level) for maintenance orders In the report Material: Where-Used List In the material reservation list in inventory management.
Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct answers to this question. Calculation key Planner group Capacity category Organizational unit (HR).
The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question Open reservations can be cleared when a maintenance order operation is finally confirmed. Reservations are created only after a material availability check has been performed For the combination of order type and planner group, you can decide when reservations are created All open reservations are closed when the maintenance order is set to TECO.
How do you set up the visible tiles for a specific user in SAP Fiori Launchpad? Note: There are 2 correct answers to this question By assigning a PFCG role with an SAP Fiori catalog By assigning a portal role with an SAP Fiori catalog By assigning a PFCG role with an SAP Fiori tile group By assigning the tiles directly.
Which capabilities does SAP Service and Asset Manager (formerly SAP Asset Manager) provide? Note: There are 3 correct answers to this question SAP Service and Asset Manager provides single sign-on functionality. SAP Service and Asset Manager is available for SAP S/4HANA and SAP ERP SAP Service and Asset Manager can be used offline. SAP Service and Asset Manager is available only for the iOS platform. SAP Service and Asset Manager can run on smart watches.
You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question Warranty category Usage period Object information Measuring point category Status profile.
What do you have to consider when planning maintenance work that is to be carried out by an external company? If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system In the control key assigned to the order operation, the "Service" indicator must always be activated. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet. For the maintenance order type, you have to assign the Enhanced Procurement Mode.
Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question QM inspection plan with assigned inspection characteristics Inspection point type assigned to the task list header Master inspection characteristics assigned to PM task list operations Classification data assigned to a technical object.
What do you have to consider when implementing Ul technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question Web Dynpro apps can be used in the SAP Fiori Launchpad. SAP Fiori Launchpad supports only SAPUIS apps. SAP GUI for HTML can be used in the SAP Fiori Launchpad. The cloud version can also use SAP GUI for Windows.
What are valid item categories for a BOM used in Asset Management? Note: There are 3 correct answers to this question. D (Document item) I (PM Structure element) F (Functional location) L (Stock item) E (Equipment).
You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question Assign the header material of a material BOM as assembly to a task list operation. Assign the BOM usage for free assignment of material in Customizing. Assign the header material of a material ROM to the assembly field of the task list header. Assign a piece of equipment with allocated material BOM to a task list operation.
Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question? Warranty Configuration Serial data Manufacturer data.
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question? Open reservations are recompiled. Open purchase requisitions are recompiled Referenced notifications are put in Process again. Open purchase orders are recompiled.
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use? Scheduling indicator Scheduling period End Date for Scheduling Call horizon.
What do you have to consider when setting up the refurbishment process? Assign valuation type C to the order type. Assign a view profile for refurbishment to the order type. Assign a stock determination rule to the PM order type Mark the order type for refurbishment in customizing.
The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct answers to this question? A text in the subject long text screen An entry in the object list A task in the notification item An activity in the notification header.
Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question Only one object part One or more causes of damage. Only one cause of damage One or more object parts.