For which of the following objects can you enter a confirmation? (Choose two)
Production order
Production order operation
Trigger Point
Work Center
. Where can you define the valid receivers for production order costs?
In the valuation variant
In the production scheduling profile
In the settlement profile
In the costing variant
. Which functions can be triggered before releasing a production order? (Choose three)
Confirmation
Selection of a routing
Scheduling
Stock determination
Selection of a BOM
. What does SAP ERP mean?
SAP ERP is a planning system in which extended planning processes can be mapped.
SAP ERP is a system hardware that includes modules for purchasing, sales and distribution, materials management, production and so on.
SAP ERP is a technological platform, on the basis of which customer-specific extensions can be imported.
SAP ERP is an application that an enterprise can use to manage its business processes efficiently.
. What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)
Availability check
Digital signature
Resource selection
Electronic batch record
Approved master recipes
. Which of the following statements about consumption are correct? (Choose two)
Consumption takes place on the material level between the planned independent requirements and the planned orders.
Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
Consumption is restructured with the planning run.
Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
. What is a feature of the simulation mode for material requirements planning in SAP ECC?
It posts planning results to the database automatically.
It propagates exception messages from a component to the finished product
It calculates the delay time which may occur in planning.
It triggers multilevel bottom-up scheduling.
. When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
Interactive single-item planning for the delayed assembly
Multi-level single-item planning with the "simulation mode" option
Total planning online
Multi-level single-item planning with the "display material list" option
. Which of the following functions does SAP Supply Chain Management (SCM) offer?
Planning and optimization of supply chains across company boundaries.
Optimization of the procurement strategy with the supplier pool.
Product development, safety, quality, and maintenance.
Communication to customers through different interaction channels.
. What sequence do you follow in master data maintenance to define the production of a material?
Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
. In what sequence are the steps of material requirements planning performed in SAP ECC?
1. Net requirements calculation // 2. Lot sizing // 3. Scheduling // 4. Determination of the procurement type
1. Calculation of safety stock // 2. Lot sizing // 3. Scheduling // 4. Determination of the procurement type
1. Net requirements calculation // 2. Lot sizing // 3. Determination of the procurement type // 4. Scheduling
1. Availability check // 2. Lot sizing // 3. Determination of the procurement type // 4. Scheduling
. You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
Component availability
Vendor rating
Quota arrangement
Delivery date
Costs
. How does the new Inventory Management Data model contribute to the reduction of the data footprint? There are 3 correct answers to this question.
By eliminating inventory tables
By eliminating hybrid tables
By eliminating material master tables
By eliminating fields for different stock types
By eliminating inventory history tables
. What is the first step in the MRP run?
Lot size calculation
Source determination
Net requirements calculation
BOM explosion
. "Which automotive-specific functionality is embedded in SAP S/4HANA?
There are 3 correct answers to this question."
Equipment and Tools Management
Enhanced Kanban Processing
Enhanced characteristics based processes
Parts interchangeability
Packaging Logistics
. "A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question."
They can be created automatically during month end process.
They can be used for manufacturing with collective orders.
They can be applied to make-to-stock production order.
They can be used for repetitive manufacturing.
. "At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated?
Please choose the correct answer."
The requirement no longer exists
The requirements date occurs that of a firmed planned receipt
A firmed planned receipt cannot be rescheduled
The requirements date occurs before that of a firmed planned receipt
. "What does the bill of material usage (BOM usage) control at the BOM item level?
There are 2 correct answers to this question."
Default values for the item status
Default unit of measure
Allowed material type
Maximum allowed low-level code
. "Which advanced functionality has been embedded in SAP S/4HANA?
There are 3 correct answers to this question."
Supply Network Planning
Available-to-promise
Capacity planning
Backorder processing
Demand planning
. "Which Kanban master data object controls the relationship between the supply and demand source?
Please choose the correct answer."
Rate routing
Control cycle
Production supply area
Kanban container
. "How can you enhance the system statuses of a production order scenario with user statuses?
Please choose the correct answer."
By creating a user profile and assigning it to the production scheduling profile
By enhancing the system status customizing table with user statuses
By defining a status profile and assigning it to the order type
By activating the user statuses in status and action management
. Which of the following functions can be performed when the production order has the status “Created” (CRTD)?
A user trigger material availability check via mass processing (transaction COHV)
A user trigger printing of shop floor paper manually (transaction CO02).
A user can trigger material staging via mass processing (transaction COHV).
A user can schedule a background job to release production orders (transaction COOIS).
. What is the correct sequence of the following Activate methodology phases?
Prepare, Explore, Realize, Deploy
Prepare, Validate, Test, Go-Live
Validate, Realize, Test , Deploy
Prepare, Realize, Iterate, Continuous Improvement
. How Is the bill of material (BOM) exploded when you use a BOM explosion number?
With respect to a defined separate change status for product and each assembly
With respect to a common change status for product and each assembly
With respect to defined separate key dates for product and each assembly
With respect to a common key date for product and each assembly
. "Which process order function uses a resource network?
Please choose the correct answer."
Capacity leveling
Capacity planning
Resource selection
Resource scheduling
. In which data object is the production line (Repetitive manufacturing relevant work center) maintained?
Cost collector
Bill of material
Repetitive manufacturing profile
Production version
. "What are the three transition scenarios for an S/4HANA implementation?
There are 3 correct answers to this question."
New implementation
System upgrade
Landscape transformation
System activation
System conversion
. "In which of the following master data objects can you define the production order default storage location for a material component?
There are 2 correct answers to this question."
BOM, in the item for the material
Routing, in the component allocation
Work center, in the production supply area
Material master of the finished product
. "What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question."
Production Version
Bill of Material
Engineering Change Record
Routing
. "A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer."
The production manager can still see the capacity requirements
The warehouse clerk still carry out goods issue transactions
The buyer can still see component reservations
The production operator cannot enter additional confirmations
. "Which task list types can have parallel sequences?
There are 2 correct answers to this question."
Reference operation sets (S)
Master recipes (2)
Routings (N)
Rate routings (R)
. "What are drawbacks of the separation of OLTP and OLAP?
There are 4 correct answers to this question."
Multiple copies of the data exist
Only the OLAP system has a predefined subset of the data
Only the OLAP system has the latest data
The OLAP system needs to write back the data to the OLTP system
Batch process are required to keep OLTP and OLAP in sync
. "On which of the following levels can you influence the availability check for the components of production orders?
There are 2 correct answers to this question."
MRP controller
Production order type
Production controller
Material master
. "Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question."
Planned orders
Transfers from batch to batch
Stock transfers
Purchase orders
Collective orders
. "Which of these are layers in SAP Best Practice content?
There are 3 correct answers to this question."
Configuration guides
Building blocks
Process diagrams
Scope items
Solution packages
. "What are some of the advantages of using Kanban?
There are 2 correct answers to this question."
Replenishments are created close to the actual need
It is mostly accomplished by manual postings
It is a simplified form of production control
Replenishments are based on centralized planning
. "What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer."
PP Standard Sales and Operations Planning
APO Demand Planning
Integrated Business Planning
Flexible Planning
. The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?
It replaces fixed pegging relationships unless they have been created for stock
It propagates changed sales order priorities to the pegged planned orders
It enables the propagation of network alerts across the bill of materials structure
It links receipts from an alternative location in case of a shortage in the default location
. "Which reports can you access via the order and resource reporting transaction in advanced planning?
There are 3 correct answers to this question."
Operation list
Planning file entries
Production list
WIP list
Production overview
. You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders? There are 2 correct answers to this question.
Bill of material
Routing header
Work center
Material master
. "Which material master setting is required to use the repetitive planning table for production with production orders?
Please choose the correct answer."
An overall profile be assigned on the Work Scheduling view
The Selection Method must be set to “2 Selection by production version”.
A repetitive manufacturing profile must be assigned on the MRP4 view
At least one valid production version must exist on the MRP4 view
. "Which document is skipped when SAP EWM is embedded in SAP S/4HANA?
Please choose the correct answer."
Warehouse task
Outbound delivery order
Outbound delivery request
Warehouse order
. "During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan?
There are 3 correct answers to this question."
Use rescheduling with an alternative mode
Use a bucket-oriented capacity check
Use multilevel MRP run for the products on the resource
Use optimization with respect to set-up times
Use DS heuristic “Schedule Sequence”
. What must be used in the system to plan the requirements for different subcontractors separately?
Planning plant
Production versions
MRP areas
Storage locations
. "Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer."
Net change planning
Planning horizon
MRP list
Parallel processing across servers
. "Which of the following objects can you release so that the business transactions for process order execution and process management can be executed?
There are 2 correct answers to this question."
Individual control recipes
Individual phases
Individual operations
Individual process instructions
. "A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR?
There are 2 correct answers to this question."
Confirmation profile
Operation control key
Production scheduling profile
Scheduling margin key
. "In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer."
Storage Location MRP Indicator
Individual/Collective Indicator
Mixed MRP indicator
Dependent Requirements indicator
. "What are main innovations in manufacturing in SAP S/4HANA?
There are 3 correct answers to this question."
Material Coverage Fiori app
Monitor Production Orders Fiori app
Flow manufacturing
Lock-free inventory movements
Rough-cut capacity planning
. "The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question."
Manually firm all planned orders for materials within the replenishment lead time of the material
In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material
. "When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
"
Low product stability
Low product complexity
High product stability
High product complexity
. "The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer."
Material Master –> MRP Group –> Plant Settings
Plant Settings –> MRP Group –> Material Master
Material Master –> Plant Settings –> MRP Group
MRP Group –> Material Master –> Plant Settings
. "In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.
"
MRP 4
Purchasing
Work Scheduling
Basic Data 1
. Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics?
Drilldown
sort
scheduling
filters
forecast
. A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”. What does the suffix 001 in the resource name represent?
work center category
available capacity version
Number of individual cpacities
Capacity category
. The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Purchase info record
Contract
Production version
Selection mode
. What new technology is used in SAP S/4HANA Embedded Analytics?
ABAP Managed Core Data Services (CDS)
Smart Business Cockpit
Multidimensional Reporting client (MDRC)
HANA Live
. For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
Material master
Work center
Production plant
Contract
. Which material-specific information can be transferred to a transportation lane in PP/DS? There are 3 correct answers to this question.
Special procurement keys
Quota arrangements
Purchasing info records
Production versions
Outline agreement
. "Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which informations is requires to implement this change request in the scope or check?
There are 2 corret answers to this question"
The checking rule from the bussines application
The checing control for the order type
The ATP category for restricted-use stock
The checking group from the material master
. "Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers in this question"
Handling Unit Management
Labor Management
Expected goods receipt
Yard Management
Slotting
. "Which of the following apply to MRP Live?
There are 2 correct answers to this question"
The definition of the planning scope is more flexible
Planned orders need to be convertes to purchase requisitions for externally procured materials
The Badis for classical MRP also apply to MRP Live
The sequence of planning materials is calculated across plants
. "The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock requirements list. Which of the following will firm planned orders”.There are 2 correct answers to this question
"
Creating a planned order within the planning time fence
Assigning a production scheduling profile
Manually changing the quantity of a planned order
Setting a planning time fence in the Material Master Record
. "What are some of the SAP Fiori user types?
There are 3 correct answers to this question."
Occasional
Employee
Developer
Business partner
Expert
. "Where can you maintain consumption mode and consumption periods for planning strategies?
There are 2 correct answers to this question."
In the plant parameters
In the material master
In the MRP group
In the requirements class
. "Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question"
Task list group number
Validity dates
Work center hierarchy
BOM status
Lot sizes
. Which data object can be updated with the scheduling results of a routing?
Production scheduling profile
MRP profile
Production version
Material master
. "What are properties of MRP Live?
There are 2 correct answers to this question"
It uses the same Badis as classic MRP
It is executed on the database server
Data is read sequentially from the database tables
The code is written in SQL Script
. "The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?"
Periodic lot sizing
Fixed lote sizing
Exact lot sizing
Minimum lot sizing
. "Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct anwers to this question"
SAP Human Capital Management
SAP Hybris
SAP Visual Enterprise
Concur
SAP Fieldglass
. "What are pillars of SAP Activate?
There are 2 correct answers to this question"
SAP MaxAttention
SAP Best Practices
Premium engagement
Guided Configuration
. "Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question"
Elimination of customer master tables
Elimination of document index tables
Eliminations of LIS tables for rebates
Elimination of output condition tables
Eliminations of status tables
. "Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question"
Change planned order quantities
Change sales order quantities
Enter time-ticket confirmation for production orders
Undo for drag&Drop planning activities
. "Your customer complains about incorrect duration for production order operations. What time elements could cause the issue?
There are 3 correct answers to this question"
Move time
Queue time
Floating time
Tear down time
Processing time
. In a first step you have created master recipes. In which sequence are the additional objects created?
Control recipe-process order-process message-PI Sheet
Process order-control recipe-process message-PI Sheet
Process order-control recipe-PI Sheet-process message
Control recipe-process order-PI Sheet-process message
. "A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?"
Finite resource and finite strategy
Infinite resource and infinite strategy
Infinite resource and finite strategy
Finite resource and infinite strategy
. "What steps are possible in a PP/DS production planning run?
There are 3 correct answers to this question"
Backorder processing
Optimization
Detailed scheduling functions
Heuristics
Demand consumption
. In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
The Planning Strategy of the finished product
The Individual/Collective indicator of the component
The MRP Type of the component
The item category of the component in the BOM
. "Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP?
There are 2 correct ansers to this question"
Opening period
Goods receipt processing time
Setup time
Float before and float after production
. "For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question."
Work center
Plant
Material
Production version
. "Which options are available for an SAP S/4HANA deployment?
There are 2 correct answers to this question"
SAP S/4AHANA Enterprise Management cloud
SAP S/4HANA on premise
SAP S/4HANA private cloud
SAP S/4HANA Professional services cloud
. In which customizing activity do you set up automatic routing selection for production orders?
Define production scheduling profile
Define scheduling parameters for production orders
Define order-type-dependent parameter
Define selection profiles
. "The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment?
There are 2 correct answers to this question"
Subcontracting
Vendor consignment
In-house production
Stock transfer
. "What are attributes of the SAP S/4HANA Simplification list?
There are 3 correct answers to this question"
It can have a business and a technical impact
It is only a grouping of related technical simplifications
It contains references to the relevant training material
It details transaction and solution capabilities at a functional level
It was created for better planning and estimation of your way to S/4HANA
. "Which of the following is an advantage of MRP Live and NOT available in classical MRP?
There are 2 correct answers to this question."
MRP Live can propose alternative solutions
MRP Live can create production orders automatically
MRP Live can priorities demand from sales orders
MRP Live can plan materials with recursive BOMs
. Which of the following data objects are updated when a user confirms an operation?
Production order header status
Shop floor information system
Production order total order quantity
Warehouse transfer order status
. "What are prerequisites for using batch derivation?
There are 2 correct answers to this question."
Batch where-used list
Receiver-sender relationships
Batch determination selection conditions
Process instructions
. "Which technological advances enabled the development of SAP S/4HANA as the digital core?
There are 3 correct answers to this question"
Big and affordable memory
Multi core processors enabling parallelism of tasks
Wide adoption of web standards such as Service oriented architecture
Advances in the three-tier architecture approach
Capability to add to server landscape and scale
. "What capabilities does SAP S/4HANA embedded analytics provide?
There are 2 correct answers to this question."
Automatic update of story boards
Strategic analysis
Real time decision support
Comparison of current data with historical data to identify trends
. You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order. Which is the appropriate planning strategy to use?
Planning with final assembly (40)
Make-to-order production (20)
Planning without final assembly (50)
Production by lot size (30)
. "Which capabilities does the Alert monitor have?
There are 3 correct answers to this question."
Automatically send alerts with Alert Notification Engine
Automatically reschedule in case of overload alerts
Nominate time-dependent substitutes for a planner
Automatically predict alerts in future planning cycles
Generate alerts based on defined threshold values
. "Which of the following are included as SAP S/4HANA Sales Simplifications?
There are 3 correct answers to this question."
SAP order Fulfillment replaces ERP SD Availability Checking
SAP Sales Support replaces SAP CRM
Settlement Management replaces ERP SD Rebates
SAP GTS replaces ERP SD Foreign Trade
SAP Revenue Accounting replaces ERP SD Revenue Recognition
. "When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question"
For production lines with short lead times
When goods issues can wait for final confirmation
When you need to determine the work in progress
You require an up-to-date inventory for components
. To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend?
Pick parts
Release order parts
Crate parts
Kanban
. "What Kanban status automatically posts goods receipt with reference to the procurement element?
Choose the correct answer"
Wait
In use
Full
Empty
.
|