Which actions must the engineer perform to serialize piece of equipment? choose 3 answers. assign a serial number profile to the equipment master. add a serialized material into the construction type field of the equipment master. assign a serial number profile to the material master. add a serial number to an existing equipment master. add a serialize material to the equipment serial data view.

Which options do you have to allow the assignment of order operation to object list entries. choose 3 answer. to all notification. to all maintenance plans. only to notification created via maintenance plans. to all task list. to all object list entries.

Which of the following BOMs will you use to setup spare parts planning of functional locations and equipment?. Construction BOM. Maintenance BOM. Production BOM. Costing BOM.

In which maintenance objectcan you use an activity type? choose 2 answer. maintenance order header. task list header. maintenance order operation. work center.

You have several defective parts that you need to send to a subcontractor to get them refurbished, what must you do to trigger the external refurbishment order? choose 1 answer. create a manual purchase order and add therefuribshment order number. create an external activity (PM 02) within the refurbishment order. create a manual purchase requisition and add the refurbishment order number. create an internal activity (PM 01) and add the defective material as non stock component.

What are the three pillars of SAP Activate?. SAP Best Practices. Performance tuning. Methodology. Guided configuration.

How do you activate sub screen for equipment master data IN customizing? choose 1 answer. create a view profile and assign it to the equipement category. create a screen group info type and assign the group to the equipment category. assign object information parameter to the equipement category. define the field selection for the equipment master data.

In the document management system, you can create new documents that contain information about equipment or repair instructions, and attach these to the maintenance order or operation. False. True.

In which of the following locations can object information be found?. In an order. In a notification. In a master record for the technical object. In a document.

Which of the following statements are correct?. Overheads on planned costs are determined as part of the standard cost estimate. Overhead rates are used to allocate sales and administration overheads. Overheads on actual costs are determined automatically when the order is saved. Overhead rates enable you to allocate overhead costs to cost accounting objects according to cause.

Which of the following describes an electronic data record of transactions that contains predefined information from master data and organizational elements?. An Inventory. A document. A log. A report.

Which of the following processes (applications) are part of the production processes?. Manufacturing execution. Master production scheduling. Sales and Operations Planning. Delivery processing. Material requirements planning.

what must you define for the material master before you can refurish the corresponding material? choose 1 answer. MRP type replenishment. transport group 0001. split valuation of stocks. serial number profile.

Which of the following are valid schedulingparameter in the multiple-counter plan? choose 2 answers. call horizon. schedule period. start counter reading. Or-link.

Which operations can the responsible person preform after a maintenance order in technically completed? choose 3 answers. lock or unlock the order. create invoice receipt for delivered material. change the planned cost. change the settlement rule. update the estimate cost.

Which of the following technologies is the preferred technology to achieve a harmonization across solutions?. Dynpro. SAP Screen Personas. SAP Flowers. Floorplan Manager.

What are the three implementation scenarios covered by SAP Activate?. New implementation. Landscape transformation. System conversion. Database migration.

Which of the following are typical tools used by key users to develop various analyses in SAP S/4HANA Embedded analytics?. SAP HANA Live Browser. KPI builder. Query Designer. Design Studio.

What is the preferred client type for SAP S/4HANA?. SAP GUI for HTML. SAP Business client for HTML. SAP GUI for Windows. SAP Fiori launchpad.

When the planner adds a stock material in the orders, which activities areperformed next in relation to the order? choose 3 answers. perform the availability check. Post the goods receipt. post the goods issue. create the purchase order. print the material provision.

Which order type do you need when you refurbish defective parts? choose 1 answer. order type with refurbishment indicator. order type breakdown maintenance. order type of preventive maintenance. order type with investment indicator.

You use SAP Work manager. Which operation can the maintenance worker execute? choose 2 answer. change BOM create work order on the ESRI map. create notification create a measuring reading. scheduling resources change task list. create equipment install equipment.

The maintenance engineer creates a single cycle plan with a cyle of 12 months and enters the scheduling indicator time-key date. Which further scheduling parameter must you enter so that the calcuated call date is always scheduled six months before the planned date? choose 1 answer. enter a scheduling period of six months. enter a tolarance of 50 %. enter a call horizon 50 %. enter an offset of six months.

Which of the following statements about commitments management are correct?. A. Commitment values canexceed planned costs. B. Commitments lead to actual costs as a result of various business transactions. C. Commitments are contractual obligations that are entered in accounting. D. Commitments are used to update and monitor resources that are required forexternal procurement. E. Commitment data is built up when the scheduled order resources are valuated.

When does the system create the entries in the web app job for the technician?choose 1 answer. when the planner performs capacity planning. when the planner creates the maintenance order. when the planner prints the job card. when the planner releases the maintenance order.

In the SAP Easy Access menu, you can create a favorites list containing: Links to files. Web addresses. Transactions.

Which of the following is scheduling indicator? choose 1 answer. time-latest date. time-earliest date. time-fixed date. time-key date.

Which of the following areas are available in SAP S/4HANA?. Concur. Marketing. SuccessFactors Employee Central. Enterprise Management.

What must you assing for a cross-plant planning scenario? choose 1 answer. the same planner group to multiple maintenance plants. multiple planning plants to a maintenance plant. the same planner group to multiple plants. the same planning plant to multiple maintenance plants.

What does a virtual data model provide?. A copy of the database optimized for analytical use. Consumption-ready views of data. Reporting tools for users. Ready-to-use business reports.

What are the prerequisits to run SAP Work manager? choose 3 answers. Mobile add-on for SAP S/4 HANA. Sysbase unwired platform. SAP mobile platform. SAP Geographical enablement framework. device operation system ( iOS, android or windows ).

Which actions can you perform with the create technical objects SAP fiori app? choose 3 answers. change a reference location. edit classification data and characteristics. assign document. displayasset viewer. create measuring point.

Which periode does the planner define whenusing the scheduling period in the maintenance plan? choose 1 answer. the period in which the system job for scheduling runs. the period for which orders are created in advance. the period in which a shift of planned dates is allowed. the period for which the system generate planned or call dates.

Which of the following are true statements about master data?. Master data is organized into views that are assigned to organizational elements. Master data is created centrally and is available to all applications and all authorized users. Master data decreases data redundancy.

What are the effects when theplanner technically complete the maintenance order? choose 2 answers. the planner CANNOT add an oder operation. the system close open reservations. the technician CANNOT create time confirmations. the system deletes open purchase orders.

Which activities can the plannner perform by using the maintenance planning overivew with the default filters? choose 3 answers. A. analyze outsanding notifiaction that have NOT been assigned to the maintenance order. B. analyze released maintenance orders whose end date is in the past and were NOT finally confirmed. display purchase orders for non-stock material for which the goods receipt was NOT poste. D. analyze confirmed maintenance orders which were NOT setteled. E. display approved purchase requisitions for non-stock material for which NO purchase order was generated.

Which of the following statements about configuring the notification screen are correct?. You can apply a simple view or an enhanced view to each notification type. You can define only one screen area per tab. You can assign internal headings and symbols to tabs. You can choose from 27 different tab pages for each notification type.

A piece of equipment cannot be linked to a material. Determine whether this statement is true or false. True. false.

A maintenance planning plant. Can only be assigned to one maintenance plant. Can be assigned to various maintenance plants. Is the organizational unit to which work centers are assigned. Is only relevant for cross-plant planning.

Which of the following process feature are part of breakdown maintenance? choose 3 answers. maintenanc order always need planning of maintenance tasks. order and notification can be utilized in combination. maintenance orders can be created as immediate orders without any planning. order created without notification can be used within the maintenance event builder. notification are used for documentation of technical findings and activates performed.

The planner must add an activity to a notification which must be executed in the future. Which option in the notification, that can be predefined in a catalog does the planner use? choose 1 answer. an activity in the notification item. a task in the notification header. a text in the notification item. a text in the subject long text screen.

You plan to use the integration of maintenance order and project system (PS) objects. to which PS objects can you assign a maintenance order? choose 2 answers. network operations. WBS element. network header. project definition.

The installation locations for equipment in a technical system are documented in the -------------. Job List. Usage List. Measuring Points. Equipment View.

You create a revision for a maintance event builder (MEB) scenario. which objects can manually assign to a revision? choose 2 answers. automatically created maintenance order from a maintenance plan. automatically created notification from a maintenance plan. manually created notifications. manually created maintenance orders.

Which of the following is used for calculating the next planned date for preventivemaintenance orders?. Technical Completion date of the previous Order. Maintenance Plan start date of the previous Order. It is pre-determined and will not be recalculated. Confirmation date of the task.

What does the structure indicator define? choose 2 answers. the field selection for the functional location list. the cateogry of the functional location. the allowed characters for a functional location. the hierarchy levels of the functional location structure.

Which valuation category do you use to refurish the material? choose 1 answer. in-house/ external procurement. retail. origin. condition-based.

Which of the following is true about a maintenance planningplant?. The maintenance planning plant and the maintenance plant can never be the same. It is the highest-level element of all the organizational units. The Plant at which the operational systems of a company are installed is called the maintenance plant. If maintenance work is planned at this plant, the maintenance plant is also the maintenance planning plant.

Inspections and repair work requiring the shutdown of an entire asset is performed at regular intervals can be handled using-------. Project-Oriented Maintenance. Preventive Maintenance. Corrective Maintenance. A Breakdown Maintenance.

Which of the following is true about SAP Asset Intelligence Network cloud application?. It is the target of the application to maintain a global directory of pieces of equipment, that uses general definitions. A remote service technician is a typical user of this application. It is the target of the application, to improve the visibility of machines. A constructing engineer is the typical user of this application.

Where can the planner check the material availbility? choose 3 answer. within the SAP fiori-based background job. from the list of orders. within an individual order. within the SAP fiori-based material document overview. from the reservation list.

The starting point for the corrective maintenance process usually is a------. Catalog. Notification. Order. Activity.

Which of the following provides general information on the SAP system and transaction or task on which you are working?. Menu path. Role bar. Application toolbar. Status bar.

Name the manufacturing execution process step that allows someone to enter the actual time and activities of the various operations during the production process. Costing. Disaggregation. Material requirements planning. Confirmation.

Which of the following statements about work centers are correct?. They form the basis for cost calculation, capacity planning, and scheduling. They are organizational units that define when and where an operation must beperformed. They can be machine, production lines, or people. They are only used in maintenance.

What must youmaintain before you create the measuring point or counters for technical objects? choose 1 answer. enter an annual estimate. create a code group in the necessary catalog. assign characteristics to classes. create necessary characteristics in the classification system.

Which of the following is true about SAP Work Manager?. It is used in combinations with S/4HANA. It is available only on SAP Cloud Platform. It is used in combinations with SAP ERP and S/4HANA. It is available in On Premise Edition and Cloud Edition.

What activities can be performed with a deliverydocument?. Debit memo. Goods issue. Credit memo. Picking.

The planner add a stock material in the orders. What does the system create reservation depending on the settings of the order type? choose 2 answer. A. after the available check is performed. B. when the order is released. C. when the order is saved. D. when the cost are determined.

Which of the following objects can you directly assign when youdefine the work center master record? choose 2 answers. calculation key. business partner. capacity category. organizational unit.

What are the key functionalities in SAP Cloud Platform?. Open APIs. Microservices. Edge computing. Integration.

The technical completion of the actual maintenance order was posted with a delay of 10 days. How can the planner shift the next planned date by the same amount? choose1 answer. set the shift factor for the late completion to 10 %. set the shift factor for late completion 100 %. set the shift factor for early completion 100 %. set the shift factor for early completion 10 %.

Which of the following are checking instructions used to control availability checks?. Checking rules. Checking types. Checking groups. Checking profiles.

You would like to preset a value for a field that you have to enter frequently. To do this, you need the parameter ID. Which help function would you use to locate the parameter ID when you are on the field?. F4. F1. F11. Application help. System help.

Which of the following is true about calculating the cost for maintenance?. It is calculated at the Order operation level by default. You can configure the system to calculate the cost at the header level in the order type customizing in SPRO. It is calculated at the Order header level by default. The operation account assignment (OAA) business function allows to calculate costs of maintenance orders at operation level.

Two maintenance package of a maintenance strategy are due at the same time. Which parameter determine that only one of these maintenance package is executed? choose 1 answer. hierarchy. package sequence. offset. lead float.

Which edition allows more extensive customer modifications?. Cloud edition. On-premise edition.

Which must you define before you can create a new function location? choose 2 answers. status profile. structure indicator. functional location category. reference functional location.

Which UI technolgies are supported in SAP S/4AHANA asset management when you use SAP Fiori launchpad? choose 3 answers. business server pages (BSP). SAP GUI for HTML. Web Dynpro. SAP GUI for windows. SAPUI5.

Which of the following is not a Customizing setting for order types?. Structureindicator. Settlement profile. Planning plant. Residence time. Settlement rule.

At what level does the system calculate costs of maintenance orders? choose 1 answer. always on header level depending on the maintenance plant. always on operation level depending on the order type and the maintenance planning plant. on header level or on operation level depending on the order type and the maintenance planning plant. on header level or on operation level depending on the controlling view.

what can planner monitor with the resource scheduling for maintenance planner sap fiori app? choose 2 answers. workload of wok centers. maintenance order NOT confirmed. Notification without maintenance orders. non-availablestock materials.

To run apps in SAP Fiori launchpad you mustassign the user ... Only the OData services on the frontend server. Only the business roles on the backend server. Roles on frontend and backend servers. Only the business roles on the frontend server.

In which object can you change the offset of a maintenance plan strategy? choose 1 answer. maintenance package. maintenance plan header. maintenance plan item. maintenance plan category.

Why do you create maintenance planner group? choose 1 answer. to map a group of persons which plan maintenance budgets. to map a group of persons responsible for maintenance plans. to map a group of persons responsible for maintenance strategies. to map a group of persons which plans maintenance activities for technical objects.

To which objects can you assign a safety plan? choose 2 answers. work approval. permit. maintenance order. task list.

To which of the following organizational units can you directly assing a maintenanceplant? chose 1 answer. controlling area. standard purchasing organization. personnel area. profit center.

A billing document can be createdfrom what two types of documents?. Sales order. Inquiry. Rebate list. Quotation. Delivery.

The planner callls the document flow in the work order, which of the following document type are directly displayed? choose 3 answers. material document. accounting document. time confirmation. controlling document. invoice.

Which of thefollowing types is supported out of the box in technical objects? choose 2 answers. controller. Contractor. organizational unit. maintenance plant.

To which SAP object can the planner assign a maintenance order to make a budget available for the order? choose 2 answers. network header with the allocated budget. investement program item with the allocated budget. functional location with the allocated budget. WBS element with the allocated budget.

The maintenance engineer creates a singel cycle plan with the following parameters: * the call object is maintenance order * the indicator or seprate completion of maintenance call date is NOT set * the indicator for completion requirement is NOT activated * both shift factors are set to 100% . Which date is relevant for the calculation for further planned dates for all objects? choose 1 answer. planned date of the next call number. completion date of maintenance plan. technical completion date of the maintenance order. basic finish date of the maintenance order.