Cuestiones
ayuda
option
Mi Daypo

TEST BORRADO, QUIZÁS LE INTERESEMADRO No. 1

COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del test:
MADRO No. 1

Descripción:
MADRO No. 1

Autor:
MADRO
(Otros tests del mismo autor)

Fecha de Creación:
13/11/2023

Categoría:
Personal

Número preguntas: 105
Comparte el test:
Facebook
Twitter
Whatsapp
Comparte el test:
Facebook
Twitter
Whatsapp
Últimos Comentarios
No hay ningún comentario sobre este test.
Temario:
What is the purpose of the SAP Activate Methodology? Please choose the correct answer. Response: To enable access to the SAP ecosystem To provide end-to-end integrated application lifecycle management To manage project and solution documentation To accelerate the initial implementation of SAP S/4HANA.
You are facing resistance from internal stakeholders for an On-Premise implementation. What should be your first step? Please choose the correct answer. Response: Proceed with the implementation without their approval. Cancel the project. Escalate the issue to higher management. Conduct a cost-benefit analysis to present to the stakeholders.
Which of the following tasks are part of the Production support after the Go Live key deliverable? There are 2 correct answers to this question. Response: Provide further training to customer end users Perform a Technical systems test Set up the Operations Control Center Resolve issues identified during the Hyper Care period.
Which of the following best describes the SAP Activate methodology? Please choose the correct answer. Response: A user interface tool for SAP applications A strict waterfall approach to SAP implementations A combination of best practices, methodology, and guided configuration A tool for project documentation and testing.
What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate? Please choose the correct answer. Response: Project Charter Project Documentation Knowledge transfer to end users Learning plan.
You are tasked with implementing SAP S/4HANA Cloud Public Edition. What is the first step you should take? Please choose the correct answer. Response: Start data migration. Purchase the required licenses. Configure the system settings. Conduct a fit-gap analysis.
In SAP Activate, what tool is used in the agile delivery approach during the Realize phase to make forecasts based on actual data? Please choose the correct answer. Response: Release Plan Project Plant Burndown Chart Product Incremen.
Which artifacts in the Testing work stream are created within the Realize phase for the New Implementation of SAP S/4HANA Cloud" transition path? There are 2 correct answers to this question. Response: Reporting Functional Specifications Functional Test Scenarios User Acceptance Test – Plan Functional Specifications.
In which phase do you verify that the SAP Best Practice solution scenarios meet the business needs of the customer? Please choose the correct answer. Response: Prepare Deploy Explore Realize.
You are asked to provide a detailed project plan. Which SAP Activate tool would you use? Please choose the correct answer. Response: SAP Solution Manager SAP Analytics Cloud SAP Roadmap Viewer SAP Fiori.
You have decided to go for a hybrid cloud model. What is the most complex challenge you are likely to face? Please choose the correct answer. Response: Data integration between private and public clouds User training Cost management Data migration.
What is the best target deployment option of SAP S/4HANA for the "System Conversion" transition path? Please choose the correct answer. Response: SAP S/4HANA Cloud SAP C/4HANA Hybrid of SAP S/4HANA Cloud and SAP S/4HANA SAP S/4HANA.
What are the benefits of the SAP best practices? There are 3 correct answers to this question. Response: Fast time to value Simple on-boarding to cloud Reduced functional scope Fixed organizational structure Predictable results.
An SAP project is in its final stages, and there's a need to validate the system's performance under load. Which workstream should take the lead in this activity? Please choose the correct answer. Response: Application Workstream Technical Workstream Change Management Workstream Data Management Workstream.
Which of the following is NOT a typical responsibility of the Change Management Workstream in SAP Activate? Please choose the correct answer. Response: User training System configuration Communication planning Stakeholder management.
Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition. What is the correct sequence of selected key deliverables across the project phases? Please choose the correct answer. a. Code adjustment b. Detailed System Assessment c. Production Readiness Check d. Validation of Migration a. Detailed system Assessment b. Code Adjustment c. Validation of Migration d. Production Readiness Check a. Production Readiness Check b. Detailed system Assessment c. Code Adjustment d. Validation of Migration a. Detailed system Assessment b. Production Readiness Check c. Code Adjustment d. Validation of Migration.
Where can you find Data Migration templates? Please choose the correct answer. SAP Roadmap Viewer SAP Best Practices Explorer SAP S/4HANA Migration Cockpit SAP Cloud Appliance Library.
In Which phase does the Transition to Operations work stream start? Please choose the correct answer. Prepare Correct Deploy Explore Realize.
What information does the project team need before they can correctly estimate the relative size of backlog user stories? Please choose the correct answer. Response: Test strategy Overall project schedule Definition of Done Available project resources.
During an SAP project, you notice resistance from end-users regarding the adoption of new processes. Which workstream should be actively involved to address this challenge? There are 2 correct answers to this question. Response: Change Management Workstream Project Management Workstream Application Workstream Data Management Workstream Technical Workstream.
What are some of the values of SAP Cloud ALM for implementation? There are 3 correct answers to this question. Response: Comprehensive document repository Pre-loaded SAP Activate tasks NO additional cost of product Central cost and effort management Accelerated time to market.
In the "New Implementation of SAP S/4HANA" transition path, which systems are part of the project system landscape? There are 2 correct answers to this question. Response: DEV P-system QAS Starter system.
In Agile Project Delivery, who is responsible for quality assurance and testing of the features developed in a sprint? Please choose the correct answer. Response: The entire Scrum team, including developers and QA Only the developers The Scrum Master Only the QA team.
What is the primary purpose of the SAP Activate Methodology? Please choose the correct answer. Response: To provide end-to-end Application Lifecycle Management To enable access to the SAP ecosystem To provide the sequence of actions in the project To manage solution documentation.
An organization is implementing SAP S/4HANA. They want to ensure that their master data is cleansed, transformed, and loaded efficiently into the new system. Which workstream in SAP Activate should be responsible for this activity? Please choose the correct answer. Response: Change Management Workstream Technical Workstream Data Management Workstream Application Workstream.
What is SAP Activate? Please choose the correct answer. Response: A bundle of ASAP, SAP Launch, and Rapid Deployment Solutions A methodology for each of the deployment modes (cloud, on-premise, hybrid) A combination of SAP best practices, methodology, and guided configuration A step-by-step instruction on how to remove from SAP best practices to your custom solution.
In which phase of the SAP Activate methodology does the team complete the Cut-over Rehearsal? Please choose the correct answer. Response: Prepare Explore Realize Deploy.
You have a critical dependency between two workstreams. How would you manage this? Please choose the correct answer. Response: Ignore it and hope it resolves itself. Document the dependency and communicate it to both workstream leads. Merge the two workstreams into one. Delay one workstream until the other is complete.
What is the objective of a sprint retrospective meeting? Please choose the correct answer. Response: Define the stakeholder management approach Review and prioritize the backlog Provide formal feedback to the project manager Improve the SCRUM process.
When transitioning to SAP S/4HANA, what does the term "System Conversion" primarily refer to? Please choose the correct answer. Response: Migrating from a non-SAP system to SAP S/4HANA Upgrading from an older SAP ERP version to SAP S/4HANA Transitioning from SAP S/4HANA Cloud to On-Premise Implementing a new module within an existing SAP S/4HANA system.
Which of the following are benefits of Agile Project Planning? Please select all the correct answers that apply. Response: Flexibility to adapt to changes Faster time to market Reduced project risk Fixed project scope Enhanced collaboration among team members.
How can the project manager help to keep momentum in the project and help to keep the customer involved? There are 2 correct answers to this question. Response: Increase the number of Q-Gates Add customer resources to the project to reduce the need for formal training Leverage agile cycles to build and test the solution Walk through the solution processes with the stakeholders.
Which of the following is a key advantage of the SAP S/4HANA Private Cloud edition over the Public Cloud edition? Please choose the correct answer. Response: Reduced costs due to shared infrastructure Automatic mandatory updates without any control Greater flexibility in terms of customization and configuration Limited integration capabilities with other SAP products.
What activities do you perform during the fit-to-standard workshops milestone in the SAP Activate methodology within SAP Cloud ALM? There are 3 correct answers to this question. Response: Create SAP Fiori screen mock-ups in SAP Cloud ALM. View details of high-level process flows in SAP Cloud ALM. Create notes and/or requirements in SAP Cloud ALM. Create wireframes for user interfaces in SAP Cloud ALM. View details of business process diagrams and descriptions in SAP Cloud ALM.
In which phase of the SAP Activate Methodology does the team complete the System Assessment? Please choose the correct answer. Response: Deploy Explore Prepare Realize.
What can users do in the Roadmap Viewer tool? Please choose the correct answer. Response: Display and navigate detailed SAP Activate methodology WBS Upload SAP Activate WBS into SAP Solution Manager7.1 Download full SAP Activate methodology content for use off-line Create a customer-specific version of SAP Activate Methodology.
What solution operations framework can customers use to create a joint business and IT organization? Please choose the correct answer. Response: SAP Roadmap Explorer Business Transformation Management Methodology SAP Activate Customer Center of Expertise.
Which key activities does the Guided Configuration support you with? There are 3 correct answers to this question. Response: Manage roles of configuration users Train new users Create test data Test configured processes View solution scope.
Which estimation technique can be used in an Agile delivery approach to size the User Stories during sprint planning? Please choose the correct answer. Response: Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks Relative estimate in ideal person days that reflects the best estimate provided by the project team Detailed bottom-up effort estimates by the Scrum Master in story points based on the User Story complexity Product Owner’s relative estimate of the effort that will be needed to implement the user story.
In which phase of the SAP Activate methodology does the team complete the Transformation Planning? Please choose the correct answer. Response: Deploy Explore Prepare Realize.
Which of the following is a key characteristic of the Agile project approach? Please choose the correct answer. Response: Formal and detailed documentation Frequent and detailed project scheduling Frequent quality gates Iterative build with frequent inspections.
What is the most granular level of the methodology you can view in the SAP Roadmap Viewer? Please choose the correct answer. Response: Scenario Task Deliverables Phase.
One of your workstreams is consistently missing deadlines. What is your first course of action? Please choose the correct answer. Response: Reassign the workstream lead. Conduct a root cause analysis. Escalate the issue to higher management. Terminate the workstream.
Which of the following is NOT a typical step in selective data transition? Please choose the correct answer. Response: Data mapping Data cleansing Data encryption Data validation.
In the context of SAP S/4HANA On-Premise, what is the primary advantage of using the SAP Activate methodology? Please choose the correct answer. Response: It provides a strict waterfall approach for implementations It offers a combination of best practices, tools, and guided configuration It focuses only on cloud-based solutions It replaces the need for any third-party tools.
What is the primary role of a Scrum Master in Agile Project Delivery? Please choose the correct answer. Response: Making decisions about the product features Writing code and testing features Facilitating the Scrum process and removing obstacles for the team Prioritizing the product backlog.
Which tools does SAP Activate provide to support Guided Configuration? There are 3 correct answers to this question. Response: Solution Builder Expert Configuration Self Service Configuration SAP Solution Composer Model Company.
The hyper care period is part of which phase? Please choose the correct answer. Response: Realize Explore Deploy Go-Live.
What does SAP Activate recommend to keep team members informed and aligned? Please choose the correct answer. Response: Daily status meeting with project manager Daily team stand-up meeting Daily e-mail status updates to project manager Daily progress review meeting with sponsor.
Which of the following activities are performed in the Explore phase of SAP Activate in SAP S/4HANA Implementation? There are 3 correct answers to this question. Response: Adjusting custom code objects Implementing best practices Creating transactional data Organizational structure Changing master data.
Which of the following tools within SAP Activate can assist in the rapid deployment of SAP S/4HANA Cloud Public Edition? Please choose the correct answer. Response: SAP Roadmap Viewer SAP Best Practices Explorer SAP Solution Manager SAP Fiori Launchpad.
An organization wants to leverage pre-configured content, business processes, and configuration guides for their SAP S/4HANA implementation. Which tool within SAP Activate should they utilize? Please choose the correct answer. Response: SAP Solution Manager SAP Fiori SAP Best Practices Explorer SAP Roadmap Viewer.
What are some of the key characteristics of the implementation approach in SAP Activate Methodology? There are 3 correct answers to this question. Response: Based on Ready-to-use Content Cloud Ready On premise only Fixed scope Delta-based.
Which of the following are the benefits of SAP JAM? There are 2 correct answers to this question. Response: Easy to use Reduced Recovery Time Highly available User collaboration.
When considering a System Conversion to SAP S/4HANA, which of the following is a critical preparatory step? Please choose the correct answer. Response: Decommissioning the old system immediately Customizing the new system before migration Performing a thorough system and custom code analysis Migrating all data without any cleansing.
When considering a transition to SAP S/4HANA Cloud, what is the primary difference between the Private and Public Cloud editions? Please choose the correct answer. Response: The Private Cloud offers more customization capabilities compared to the Public Cloud The Public Cloud is hosted on the customer's infrastructure, while the Private Cloud is hosted by SAP The Private Cloud is subscription-based, while the Public Cloud requires a one-time purchase The Public Cloud supports third-party integrations, while the Private Cloud does not.
In which phase do you verify that the SAP Best Practices content meets the customer's business needs, and then capture gaps? Please choose the correct answer. Response: Prepare Deploy Explore Realize.
Which of the following content best outlines the scope of the Integration Test? Please choose the correct answer. Response: a. Prototype b. Delta/gap solutions c. Data flows with non-SAP application a. Prototype b. Delta configuration c. Data flows between SAP solutions a. Solution baseline b. Delta/gap solutions c. Data flows with non-SAP application a. Solution baseline b. Delta configuration c. Data flows between SAP solutions.
In which phase should you first run the SAP Readiness Check for SAP S/4HANA in a "Selective Data Transition" transition path, in a System Consolidation scenario that includes conversion from SAP ERP? Please choose the correct answer. Response: Discover Prepare Explore Realize.
Which Value Chains does SAP Solution Manager 7.2 deliver? There are 3 correct answers to this question. Response: Detect-to-Correct Request-to-Fulfill Hire-to-Retire Requirements-to-Deploy Cash-to-Order.
What is the order of artifacts within the Technical Architecture and Infrastructure workstream in the Prepare phase? Please choose the correct answer. Response: Technical strategy -> Hardware specification from Hardware Vendor -> Parameters Hardware Sizing calculation -> Hardware Sizing results Hardware specification from Hardware Vendor -> Parameters Hardware Sizing calculation -> Hardware Sizing results -> Technical Strategy Technical Strategy -> Parameters Hardware Sizing calculation -> Hardware Sizing results -> Hardware Specification from Hardware Vendor Hardware specification from Hardware Vendor -> Technical Strategy -> Parameters Hardware Sizing calculation -> Hardware Sizing results.
An organization has multiple SAP systems due to mergers and acquisitions. They want to transition to a single instance of SAP S/4HANA. Which approach allows them to consolidate their systems during the transition? Please choose the correct answer. Response: New Implementation without data consolidation Direct System Conversion Selective Data Transition with consolidation capabilities System Conversion with third-party tools only.
Which of the following best describes the SAP S/4HANA On-Premise edition? Please choose the correct answer. Response: A cloud-based solution with automatic updates A solution hosted on the customer's infrastructure with more control over updates and customizations A purely subscription-based model with limited customization A solution that doesn't support integration with other SAP products.
What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology? Please choose the correct answer. Response: SAP Hybris SAP S/4HANA Cloud Edition SAP S/4HANA On-Premise Edition Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition.
What is the primary goal of a sprint retrospective in Agile Project Planning? Please choose the correct answer. Response: To plan the tasks for the next sprint To review the completed tasks of the current sprint To discuss and identify improvements for the next sprint To introduce new team members.
You are new to SAP Activate. What is the first phase you should focus on? Please choose the correct answer. Response: Deploy Explore Prepare Realize.
Which of the following tools is used to install SAP S/4HANA? Please choose the correct answer. Response: SAP Solution Manager SWPM (Software Provisioning Manager) Cloud Application Library Data Migration server.
Which artifacts are created within Application Design and Configuration work stream in the Explore phase of the "New Implementation of SAP S/4HANA" transition path? There are 3 correct answers to this question. Response: Delta Requirements List - Register Roles and Authorizations Management Concept Project Procedure - Mock-up Modeling Detailed Design - Business Process Organization Structure Specification.
What technique helps a Scrum Team to prioritize a large, flat Backlog? Please choose the correct answer. Response: Fit/Gap Analysis User Story Mapping Retrospective Planning Poker.
Which of the following are common Agile Project Planning artifacts? There are 3 correct answers to this question. Response: Product Backlog Sprint Backlog Burn-up Chart Gantt Chart Increment.
In which phase do you create an ordered list of everything that is known to be needed in the product"? Please choose the correct answer. Response: Explore Prepare Realize Deploy.
What accelerator can help you document the Configuration Definition in the Explore phase? Please choose the correct answer. Response: Data Definition Change Request template Backlog template Test Strategy.
Which of the following statements about SAP S/4HANA Cloud Public Edition is true? Please choose the correct answer. Response: It allows deep customization and modification of the core system It is hosted and maintained by the customer's IT team It provides regular updates with new features and capabilities It is a one-time purchase without any subscription model.
Which of the following are the pillars of SAP Activate? There are 3 correct answers to this question. Response: SAP Launch Methodology SAP Activate Methodology SAP ASAP Methodology Guided Configuration SAP Best Practices.
Which key deliverable includes the development of RICEFW objects? Please choose the correct answer. Response: Development Build Enhancement Delivery Sprint Execution Custom Extensions Management.
Identify the two landscape transformation specific tasks in the explore phase. There are 2 correct answers to this question. Response: Setup Landscape Transformation Software Define the Data Migration Architecture Perform Client transfer Run a Landscape Transformation Assessment.
What are the three elements of SAP Activate? There are 3 correct answers to this question. Response: Content Methodology Focused Build Tools SAP Solution Manager.
In SAP Activate, what replaces the detailed Blueprint from ASAP? Please choose the correct answer. Response: Business Process Mapping Value Determination Custom Extension management Fit/Gap Workshops.
What does the Content element of SAP Activate provide? There are 3 correct answers to this question. Response: Functional Specifications for WRICEF development End-User guides Business Processes Content Migration Content Integration Content.
Which of the following can be used to navigate through the roadmap? There are 2 correct answers to this question. Response: Tasks Phases Workstreams Deliverables.
Which of the following is NOT a component of SAP Activate? Please choose the correct answer. Response: Guided Configuration Best Practices Methodology Waterfall Model.
Which of the following is a potential challenge when performing a System Conversion to SAP S/4HANA? Please choose the correct answer. Response: The inability to migrate custom code The automatic deletion of all master data The need to remediate or adapt custom code and configurations The mandatory use of cloud infrastructure.
A company is implementing SAP S/4HANA On-Premise and wants to ensure that they utilize best practices for their industry. Which tool within SAP Activate can guide them? Please choose the correct answer. Response: SAP Fiori Launchpad SAP Best Practices Explorer SAP Solution Manager SAP Roadmap Viewer.
In the context of SAP Activate, which workstream ensures that the project stays within the defined scope, time, and budget? Please choose the correct answer. Response: Application Workstream Technical Workstream Data Management Workstream Project Management Workstream.
What is the basis for approving work results (signing Act of Acceptance) on a Project Phase level? Please choose the correct answer. Response: Agreed and met Acceptance Criteria within Quality Gate Definition of Done for User Story Definition of Ready for Sprint Scrum of Scrums meeting decision.
What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration? Please choose the correct answer. Response: To activate the Best Practices content To create delta building blocks for complementary content To personalize activated, ready-to run business processes To create customer-specific scope items.
What are the responsibilities of the Product Owner in release and sprint planning? There are 2 correct answers to this question. Response: Analyze the functional and technical dependencies between the user stories. Define objectives for each release. Prioritize backlog user stories by business priority. Estimate the backlog user stories.
What are some of the values of SAP Cloud ALM for operations? There are 3 correct answers to this question. Response: It provides end-to-end transparency. It provides a solution readiness check. It provides improved efficiency and automation. It provides license management capabilities. It provides reduced cost of operations.
Which of the following are levels in the structure of an SAP Best Practices Solution Package? There are 2 correct answers to this question. Response: Scope Items Building Blocks Configuration Guides Business Process Scenarios.
Which of the following is not a characteristic that the quality principles are based on? Please choose the correct answer. Response: Experience of Typical Pitfalls Best Practices SAP Quality Award example winners International standard.
Which collaboration features can SAP Activate Jam users access? There are 2 correct answers to this question. Response: Ask questions Update Key Deliverable wikis Tweet questions Comment on documents.
Which criterion does the Product Owner use to sequence the product backlog? Please choose the correct answer. Response: Resource availability Complexity Business priority Relative effort.
When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner? Please choose the correct answer. Response: During the daily SCRUM meeting During the sprint retrospective During the sprint review During user acceptance testing.
What is the purpose of the Solution Validation activity in the Explore phase? There are 3 correct answers to this question. Response: To verify technical installation To identify gaps To log additional scope items To challenge changes to standard To educate project participants.
You are in the 'Realize' phase of the SAP Activate methodology for an On-Premise implementation. What is your primary focus? Please choose the correct answer. Response: Data migration System configuration User training System testing.
What tool is used to synchronize changes between SAP ERP and SAP S/4HANA maintenance tracks? Please choose the correct answer. Response: SAP Code Vulnerability Analyzer SAP Code Inspector Business Process Change Analyzer Retrofit.
What is the purpose of a firm-up sprint? Please choose the correct answer. Response: To demonstrate functionality from previous sprint To perform String test To revise a release plan and sprint plan To run end-to-end integration test.
What can you do in the SAP Roadmap Viewer tool? Please choose the correct answer. Response: Create a customer-specific version of a roadmap. Navigate detailed Solution Implementation Roadmaps. Download full roadmap content for offline navigation. Comment on Deliverables and Tasks within Roadmaps.
What is the term used for workshops, which are intended to set value targets, validate SAP Standard functionality against customer requirements. And collect delta requirements in the "New Implementation of SAP S/4HANA" transition path? Please choose the correct answer. Response: Solution Validation Design Thinking Delta Design Fit-to-Standard.
Which activities are critical for delivering Agile projects? There are 2 correct answers to this question. Response: Retrospective agenda creation Sprint planning Release planning Blueprint scheduling.
You are asked to provide a high-level project plan. Which SAP Activate tool would you use? Please choose the correct answer. Response: SAP Roadmap Viewer SAP Solution Manager SAP Fiori SAP Analytics Cloud.
An organization is planning a System Conversion to SAP S/4HANA. They have several legacy systems and want to consolidate their data during the transition. Which approach would best suit their needs? Please choose the correct answer. Response: New Implementation without data migration Direct System Conversion without data consolidation Selective Data Transition with data consolidation System Conversion with third-party data migration tools.
How do you set up Scrum teams? There are 2 correct answers to this question. Response: As a cross-functional team covering multiple functions, like configuration, data loads, and testing Based on group size, but a minimum of 12 people Based on End-to-End Processes like Order-to-Cash By type of work, like configuration Scrum, documentation Scrum, and testing Scrum.
Who determines the priority of user stories in the backlog of an Agile project? Please choose the correct answer. Response: Project Manager Project Team SCRUM Master Product Owner.
Which of the following scenarios are enabled for the "Selective Data Transition" transition path with the SAP Landscape Transformation tool? There are 3 correct answers to this question. Response: Security Migration System Upgrade Extraction of Business Units System Consolidation Consolidation through online data replication.