Título del test:
My Test Preparation

Descripción:
Plant Maintenance

Autor:
Hari K
(Otros tests del mismo autor)

Fecha de Creación:
30/03/2022

Categoría:
Personalidad

Número preguntas: 88
Comparte el test:
Facebook
Twitter
Whatsapp
Comparte el test:
Facebook
Twitter
Whatsapp
Últimos Comentarios
No hay ningún comentario sobre este test.
Temario:
Which SAP UI technology is used for the technicianIs job list? Web Dynpro SAPUI5 SAP GUI for Windows SAP GUI for HTML.
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question. In the report Material: Where-Used List In the material reservation list in inventory management In the single-level list editing function for maintenance orders Within a maintenance order.
Which statement is correct when planning maintenance work thatis to be carried out by an external company? A service master record must always be assigned to the external order operation. In the control key assigned to the order operation, the "Service" indicator must always be activated. If you assign a control key for an external order operation, theactual values must always be entered as a goods receipt in the system. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
Which statements are correct about UI technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question. SAP Fiori launchpad only supports SAP UI5 apps. SAP GUI transactions can be used in the SAP Fiori launchpad. The cloud version can also use SAP GUI for Windows. Web Dynpro apps can be used in the SAP Fiori launchpad.
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note:There are 3 correct answers to this question. Analyze overdue maintenance orders that have NOT been finally confirmed. Display approved purchase requisitions for which NO purchase orders have been generated. Display approved purchase requisitions for which purchase orders have been generated. Analyze maintenance orders that are still in planning andhave NOT been released. Analyze confirmed maintenance orders that have NOT been settled.
What do you need to configure to enable entries in the action log ofan equipment? Activate the change documents for the equipment category. Select the time segment check box for the equipment category. Define an additional business view for the equipment category. Define the corresponding history-related field for the equipment reference category.
How do you map a counter replacement in SAP S/4HANA Asset Management? Create a new measurement document marked as a counter replacement. Deactivate the current counter and create a new counter. Create a new measurement document and assign a valuationcode for counter replacement. Replace the defective piece of equipment to which a counter is assigned.
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use? Call horizon Scheduling period Scheduling indicator Lead float.
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question. All open reservations are closed when the maintenance order isset to TECO. Reservations are created only after a material availability checkhas been performed. For the combination of order type and planner group you can decide when reservations are created. Open reservations can be cleared when a maintenance order operation is finally confirmed.
You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question. Assign a subordinate piece of equipment. Create a measuring point. Change a reference location. Edit classification data and characteristics. Assign documents.
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question. Estimated annual performance Shift factors Start counter reading Scheduling period.
How does a performance-based maintenance plan calculate the interval between start date and planned date? Cycle length divided by annual performance Cycle length divided by ((scheduling period) x (cycle modification factor)) Cycle length divided by monthly performance Cycle length divided by (annual performance / 365).
Which parameter in a maintenance strategy do you use to set thestart/end date of the maintenance order? Package hierarchy Initial/subsequent buffer Package offset Call horizon.
The planner adds non-stock material in a released maintenance order. Which of the following statements regarding the purchasing process are correct? Note: There are 3 correct answers to this question. A goods receipt can be posted after the maintenance order is technically completed A purchase order is created automatically as soon as the order is saved. The maintenance order can be set to TECO before the invoice is created. A goods receipt can ONLY be posted for a maintenance order with status REL. A purchase requisition can be created automatically as soon asthe the order is saved.
You want to create a single cycle plan with a cycle of 12 months. You use the Time - key date scheduling indicator. The orders should be called 3 months before the planned date. How can you setup the maintenance plan? Note: There are 2 correct answers to this question. Set the call horizon to 25%. Set the call horizon to 75%. Set the offset to 3 months. Set the call horizon to 90 days.
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question. Scheduling period Factory calendar Scheduling indicator Start date.
You want to assign a maintenance planning plant directly to an organizational unit. Which of the following units can you use? Maintenance work center Location Controlling area Maintenance planner groups.
You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information? Historical Orders list Usage list Structure Display Location Analysis list.
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3correct answers to this question. Update the estimated costs Create an invoice receipt for delivered materials. Change the planned costs. Change the settlement rule. Lock or unlock the order.
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct answers to this question. Type of offset Start marker Object network Unit of measure Segment.
Which valuation category do you use to refurbish a material? Origin In-house/external procurement Retail Condition-based.
Which of the following statements about orders with operation account assignment (OAA) are correct? Note: There are 3 correct answers to this question. Purchase requisitions have the operation as account assignment. The settlement rule is maintained on header level. A technical object must be assigned to an order operation. Overall costs are dynamically summed up on header level. Costs are only stored for the operation object.
Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question. Schedule and dispatch maintenance operations by shifts. Print job papers from a maintenance order. Cancel dispatched maintenance order operations. Monitor maintenance order operations due in the next 4 weeks.
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question. Maintenance activity type Change documents Completion date Order type Call object.
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100%. Which date is relevant for the calculation of future planned dates if the maintenance work is delayed? Date of the final time confirmation Technical completion date of the maintenance order Planned date of the next call, independent of maintenance orderdates Planned end date of the maintenance order.
In which maintenance object can you use an activity type? Note:There are 2 correct answers to this question. Notification activity Maintenance order operation Maintenance order header Work center.
Which objects can you use in the safety measure list? Note: Thereare 2 correct answers to this question. Work approval Work clearance documents Permits Documents.
You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in thesystem? Maintenance package offset Scheduling indicator Shift factor Maintenance plan category.
The maintenance technician wants to document the finished work steps for a technical object in a notification. Which catalog-based option in the notification can be used? An entry in the object list A text in the subject long text screen A task in the notification item An activity in the notification header.
Which material type is the best choice if you only want to create a structure element within the BOM? Operating supplies (HIBE) Maintenance assembly (IBAU) Non-valuated material (UNBW) Spare part (ERSA).
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question. Via organizational unit and personal hourly rate Via business partner and hourly price Via cost center and activity type Via activity type and hourly rate.
Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct answers to this question. Calculation key Capacity category Organizational unit (HR) Fixed price of the activity type.
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question. Via the multi-level order list (SAP GUI) Within the SAP Fiori-based background job Via the Manage Maintenance Order List SAP Fiori app Via the Change Maintenance Order SAP Fiori app.
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question. Plant Maintenance Information Systems (PMIS) SAP Lumira SAP Crystal Reports SAP QuickViewer.
You want to assign your maintenance orders to a WBS element.Which of the following statements are correct? Note: There are 2 correct answers to this question. The assignment can be made automatically. The assignment is always made to a network activity of theWBS element. The settlement receiver WBS element can be determined automatically. The assignment always has to be made manually.
What happens if you change the primary key of a functionallocation? The user must define a new labelling system for the new primary key. The user must decide whether the functional location is assigned to a new superior functional location. The functional location is immediately assigned to a new superior functional location when the new label is entered. Changing the superior functional location via alternative labeling is not possible.
Which functionalities are available in the SAP Asset Manager fora maintenance worker? Note: There are 2 correct answers to this question. Confirm time sheets. Attach documents Display maps. Display and maintain technical objects Change BOM. Create a work order on the ESRI map Schedule resources. Change task list.
You want to view transactional and analytical processing data in the Technical Object Breakdowns SAP Fiori app. What is the source of the information? BW query InfoSet for SAP Query Core Data Services (CDS view) BW InfoCube.
Which steps support the maintenance technician in the Report andRepair Malfunction Fiori app (3 tiles)? Note: There are 3 correct answers to this question. Plan repair work for responsible work center. Verify planned and actual costs Complete the malfunction report. Find malfunction records already created in a list. Assign production resource tool (PRT) to operation.
What is the goal of embedded analytics in SAP S/4HANA? Combine the HANA database with SAP BW InfoProviders. Integrate SAP BW into SAP S/4HANA. Integrate SAP BusinessObjects Business Intelligence into SAP S/4HANA. Combine transactional and analytical processing.
Which statements about the structure indicator are correct? Note:There are 2 correct answers to this question. It defines which data is transferred to the lower levels of the hierarchy. It defines hierarchy levels of the functional location structure. It defines the allowed characters for a functional location. It can have a maximum length of 50 characters.
Which statements related to the creation of maintenance orders arecorrect? Note: There are 2 correct answers to this question. The document within the document management system canbe assigned only at operational level. The long text of the reference notification can be automatically copied as the long text of the order. When an order is created based on a single notification, this notification becomes the header notification. The assignment of the header notification to an order CANNOTbe deleted.
What can be determined using the offset within a maintenancestrategy? The start date of the maintenance order The cycle duration The first due date of a maintenance package The call date for the maintenance order.
Which of the following statements are correct regarding a cross-plant planning scenario? Multiple planning plants are assigned to a maintenance plant. It is not supported in SAP S/4HANA. Multiple maintenance plants are assigned to a planning plant. It combines maintenance plants in different controlling areas.
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct answers to this question. By assigning a portal role with an SAP Fiori catalog By assigning a PFCG role with an SAP Fiori tile group By assigning a PFCG role with an SAP Fiori catalog By assigning the tiles directly.
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct answersto this question. Select and print the maintenance order shop papers. Input estimated costs for repair malfunction. Display the current location of the technical object. Add a URL to provide further information. View details of the technical object by navigating to the Asset Viewer.
You create two maintenance packages and only one package should be executed at a time. Which parameter determines this? Subsequent buffer Hierarchy Package sequence Offset.
Which parameter in the material master is a prerequisite for refurbishment? Valuation category B (in-house/external procurement) Valuation class 8000 Valuation type H (origin) Valuation category C (condition-based).
Which of the following is a prerequisite for external refurbishment? Create the purchasing info record for the external provider. Activate the subcontracting indicator in an external activity. Define the order type for external refurbishment. Select the material group for externally refurbished materials.
During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question. Storage location Maintenance planner group Maintenance work center Business partner.
Which of the following statements about breakdown maintenanceare correct? Note: There are 3 correct answers to this question. Orders always need to be combined with notifications Orders and notifications can be utilized in combination Maintenance orders can be created as immediate orders without any planning. Notifications are used for documentation of technical findingsand activities performed. More than one operation must always be maintained in the maintenance order.
You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question. Define the number range for the functional location category. Define the reference functional location. Define the functional location category. Define the structure indicator.
Which statements regarding a maintenance order with status RELare correct? Note: There are 3 correct answers to this question. The controller can determine actual cost surcharges. Goods receipts for external services can be entered. The planner can change estimated costs only at header level. Shop papers can only be printed after the order release. The planner can change planned costs at operation level.
What are the prerequisites to serialize a piece of equipment? Note:There are 3 correct answers to this question. Assign a serial number profile to the related material master. Assign a serial number profile to the equipment category. Add a serialized material to the equipment serial data view. Maintain a serial number for an existing equipment master. Add a serialized material to the construction type field of the equipment master.
What is a valid partner type within the partner determinationprocedure? Vendor (external) Business partner (gen.) Purchasing group Purchasing organization.
Which statement is correct about the SAP Fiori tile group? Note:There are 2 correct answers to this question. It provides only SAPUI5-based apps. It is assigned via a portal role. It can be assigned directly to the user via personalization. It is based on an SAP Fiori tile catalog.
You create a revision for a maintenance event builder (MEB) scenario. Which of the following statements are correct? Note: Thereare 2 correct answers to this question. You must assign maintenance notifications to the revision. You must use hierarchical task lists for the MEB scenario. You can assign a hierarchical task list to the revision. You can assign a network to a revision.
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question. Book a goods receipt. Change the estimated costs. Change the priority. Cancel status Released.
Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct answers to this question. Technical objects Work orders and operations ESRI maps Cost analytics Breakdown analytics.
Which of the following statements are correct for SAP S/4HANACloud - Asset Management? Note: There are 2 correct answers to this question. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network. You do NOT have access to the SAP S/4HANA back end system. You have access to the SAP S/4HANA back end system. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers tothis question. SAP Work Manager SAP Predictive Maintenance and Service Worker safety applications SAP Asset Manager.
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question. Assign an inspection document as PRT to the task list operation. Assign a piece of equipment with an allocated measuring point to a task list operation. Assign an inspection lot to the task list header. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
In which component do you have to perform most of theconfiguration to set up SAP Asset Manager? SAP S/4HANA SAP Cloud Platform SAP Mobile Platform SAP ERP.
You want to assign components to an equipment task list. There isno BOM assigned to the equipment. What is the prerequisite for using the free assignment of material? Assign the header material of a material BOM to the equipmenttask list header. Free assignment of material is always possible without any prerequisites. Assign the BOM usage for free assignment of material in Customizing. Assign the header material of a material BOM as assembly to atask list operation.
What can you assign in a notification item? Note: There are 2correct answers to this question. One or more causes of damage One or more object parts Only one object part Only one cause of damage.
You want to display additional document information within the document flow of a maintenance order. For which type of documentmust this be customized? Purchase order Invoice Goods movement Service entry sheet.
You are analyzing the data transfer of the cost center of an equipment. What are the possible data origins? Note: There are 2correct answers to this question. The cost center of the related maintenance work center The reference functional location of the superior functional location The individual maintenance of the cost center in the equipment master record The cost center of the superior equipment.
Which activities can the technician perform with the Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to thisquestion. Release. Print Release. Start Work Complete. Close Report Put in Process. Schedule.
In which cases are projects (PS) used in the area of SAP S/4HANAAsset Management? Note: There are 2 correct answers to this question. Shutdowns and overhaul Condition-based maintenance Investments External refurbishment.
Which objects can a personnel number be assigned to directly?Note: There are 2 correct answers to this question. Planner group Work center Equipment Business partner.
Which statements are correct for standard processes in PM/PS costcontrol? Note: There are 2 correct answers to this question. Budget can be assigned to a WBS element. Budget can be assigned to a maintenance plan. Maintenance order costs can be settled to a WBS element. Maintenance costs can be settled to a network operation.
You require stock material to carry out maintenance tasks. Whichof the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct answers to this question. The pick list for materials can be printed before order release. Material can be assigned at order header level. A goods receipt can be entered for a technically completed maintenance order. Material can be assigned at order operation level. A control key for internal workforce is required when assigning stock material to an order operation.
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct answers to this question. Work order confirmation Maintenance plan item Equipment task list Measurement document Maintenance plan header.
You want to display vehicle-specific data for a piece of equipment.How do you proceed? Assign a view profile to the combination of fleet object type and usage type. Assign a view profile to the combination of fleet object type and equipment category. Assign a view profile to an equipment category for fleet equipment. Define the field selection for the vehicle equipment master data.
Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question. Manufacturer data Warranty Serial data Configuration.
Which of the following statements about SAP Asset Manager aretrue? Note: There are 3 correct answers to this question. SAP Asset Manager can run on smart watches. SAP Asset Manager is available for Windows platform. SAP Asset Manager can be used offline. SAP Asset Manager can be used offline. SAP Asset Manager is available for SAP S/4HANA and SAPERP.
You cancel the technical completion of a work order. What are theeffects? Note: There are 2 correct answers to this question. Open reservations are recompiled. Open purchase requisitions are recompiled Open purchase orders are recompiled. Referenced notifications are put In Process again.
You want to create a maintenance order with an external order operation with service items. Which of the following statements arecorrect? Note: There are 3 correct answers to this question. The assignment of a control key with the service indicator set is mandatory. The assignment of a control key with the service indicator set is mandatory. The assignment of service master records to an order operation is optional. The usage of a model service specification is mandatory. The actual value entry can only be recorded via the service entrysheet.
The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planneddate if you set the shift factor for early completion to 100%? It is postponed by 5 days. It is postponed by a full cycle (100%). It is not shifted. It will be 5 days earlier.
What is the correct receiver object type for the settlement of arefurbishment order? The material The fixed asset The cost center The WBS element.
A piece of equipment cannot be linked to a material. Determine whether this statement is true or false. True False.
In the document management system, you can create new documents that contain information about equipment or repair instructions, and attach these to the maintenance order or operation. True False.
Which edition allows more extensive customer modifications? Cloud edition On-premise edition.
What is the function of the print diversion setting? It enables you to chose a printer based on certain fields in the order. It enables you to determine which papers are printed for the technician. It enables you to define which shop papers are printed as a system default. It tells the system that a shop paper for an order is ready to be printed.
In which of the following locations can object information can be found In Order In Notification In master record of technical object In document.
The first release of SAP asset manager mobile application is based on Windows only IOS,Android, Windows Android only ios and android ios only.
What does a virtual data model provides A copy of the database optimized for analytical purpose consumption ready views of data Reporting tools for users Ready to use business reports.
Which of the following BOMs we use to set up spare parts planning of functional locations construction BOM Maintenance BOM Production BOM Costing BOM.