option
Cuestiones
ayuda
daypo
buscar.php
TEST BORRADO, QUIZÁS LE INTERESE: PM-2023-002
COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del Test:
PM-2023-002

Descripción:
SAP PM-2023-02

Autor:
AVATAR
RS
OTROS TESTS DEL AUTOR

Fecha de Creación:
23/10/2023

Categoría: Informática

Número Preguntas: 31
COMPARTE EL TEST
COMENTARNuevo Comentario
No hay ningún comentario sobre este test.
Temario:
In which component do you have to perform most of the configuration to set up SAP Asset Manager? A. SAP Cloud Platform B. SAP ERP C. SAP Mobile Platform D. SAP S/4HANA.
How does a performance-based maintenance plan calculate the interval between start date and planned date? A. Cycle length divided by annual performance B. Cycle length divided by monthly performance C. Cycle length divided by ((scheduling period) x (cycle modification factor)) D. Cycle length divided by (annual performance / 365).
Which SAP UI technology is used for the technicianls job list? A. SAP GUI for Windows B. Web Dynpro C. SAPUI5 D. SAP GUI for HTML.
You want to create a single cycle plan with a cycle of 12 months. You use the Time - key date scheduling indicator. The orders should be called 3 months before the planned date. How can you setup the maintenance plan? Note: There are 2 correct answers to this question. A. Set the call horizon to 75%. B. Set the call horizon to 25%. C. Set the call horizon to 90 days. D. Set the offset to 3 months.
In which cases are projects (PS) used in the area of SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question. A. Condition-basedmaintenance B. Investments C. Shutdowns and overhaul D. External refurbishment.
You want to assign components to an equipment task list. There is no BOM assigned to the equipment. What is the prerequisite for using the free assignment of material? A. Free assignment of material is always possible without any prerequisites. B. Assign the header material of a material BOM to the equipmenttask list header. C. Assign the header material of a material BOM as assembly to atask list operation. D. Assign the BOM usage for free assignment of material in Customizing.
Which edition allows more extensive customer modifications? A. Cloud edition B. On-premise edition.
Which objects can you use in the safety measure list? Note: There are 2 correct answers to this question. A. Work approval B. Permits C. Documents D. Work clearance documents.
In which of the following locations can object information can be found? A. Din master record of technical object B. In document C. In Notification D. In Order.
Which objects can a personnel number be assigned to directly? Note: There are 2 correct answers to this question. A. Planner group B. Work center C. Business partner D. Equipment.
What can you assign in a notification item? Note: There are 2 correct answers to this question. A. Only one object part B. One or more object parts C. One or more causes of damage D. Only one cause of damage.
What are the prerequisites to serialize a piece of equipment? Note:There are 3 correct answers to this question. A. Assign a serial number profile to the related material master. B. Assign a serial number profile to the equipment category. C. Add a serialized material to the equipment serial data view. D. Maintain a serial number for an existing equipment master. E. Add a serialized material to the construction type field of the equipment master.
Which activities can the technician perform with the Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to thisquestion. A. Release. Print B. Put in Process. Schedule C. Release. Start Work D. Complete. Close Report.
Which of the following can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question. A. Configuration B. Manufacturer data C. Serial data D. Warranty.
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question. A. Via organizational unit and personal hourly rate B. Via activity type and hourly rate C. Via business partner and hourly price D. Via cost center and activity type.
Which statement is correct when planning maintenance work that is to be carried out by an external company? A. In the control key assigned to the order operation, the "Service" indicator must always be activated. B. A service master record must always be assigned to the external order operation. C. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet. D. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.
Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct answers to this question. A. Fixed price of the activity type B. Capacity category C. Organizational unit (HR) D. Calculation key.
Which of the following statements about breakdown maintenance are correct? Note: There are 3 correct answers to this question. A. More than one operation must always be maintained in the maintenance order. B. Notifications are used for documentation of technical findings and activities performed. C. Maintenance orders can be created as immediate orders without any planning. D. Orders always need to be combined with notifications E. Orders and notifications can be utilized in combination.
You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information? A. Historical Orders list B. Structure Display C. Location Analysis list D. Usage list.
Which statements related to the creation of maintenance orders are correct? Note: There are 2 correct answers to this question. A. The document within the document management system can be assigned only at operational level. B. The long text of the reference notification can be automatically copied as the long text of the order. C. The assignment of the header notification to an order CANNOT be deleted. D. When an order is created based on a single notification, this notification becomes the header notification.
Which of the following statements are correct for SAP S/4HANA CIoud - Asset Management? Note: There are 2 correct answers to this question. A. You do NOT have access to the SAP S/4HANA backend system. B. You have access to the SAP S/4HANA back end system. C. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network. D. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question. A. The settlement receiver WBS element can be determined automatically. B. The assignment is always made to a network activity of theWBS element. C. The assignment always has to be made manually. D. The assignment can be made automatically.
A pump requires regular maintenance based on the throughput in liters. How can the planner specify the call horizon in the performance-based maintenance plan? Please choose the correct answer. As percentage of the cycle or in days In hours As a quantity of liters In months.
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? There are 2 correct answers to this question. Reservations are created only after a material availability check has been performed. For the combination of order type and planner group you can decide when reservations are created. Open reservations can be cleared when 4 maintenance order operation is finally confirmed. All open reservations are closed when the maintenance order is set to TECO.
Why do you create maintenance planner groups? Please choose the correct answer. To map a group of persons responsible for maintenance plans. To map a group of persons which plans maintenance activities of technical objects. To map a group of persons responsible for maintenance strategies. To map a group of persons which plans maintenance budgets.
The technical completion of the current maintenance order was posted with a delay of 5 days. What happens to the next planned date if you set the shift factor for early completion to 100%? Please choose the correct answer. It is not shifted. Its postponed by a full cycle (100%). It will be 5 days earlier. It is postponed by 5 days.
Which options do you have to allow the assignment of order operations to object list entries? There are 3 correct answers to this question. To all notifications. To all object list entries. To all maintenance plans. To all task lists. Only to notifications created via maintenance plans.
Which materials are displayed when the planner checks the availability list? Please choose the correct answer. Stock materials and Production Resources Tools materials. Only the non-available stock materials. Stock and non-stock materials. Only the stock materials.
Which statements are correct for standard processes in PM/PS cost control? There are 2 correct answers to this question. Budget can be assigned to a WBS element. Budget can be assigned to a maintenance plan. Maintenance order costs can be settled to a WBS element. Maintenance costs can be settled to a network operation.
What is a characteristic of the SAP Fiori tile group? Please choose the correct answer. It is a building block of the SAP Fiori catalog. It shows active tiles in SAP Fiori Launchpad. It provides an invisible group of SAP Fiori catalogs. It is assigned using the SET/GET parameters.
Which statements related to the creation of maintenance orders are correct? There are 2 correct answers to this question. The assignment of the header notification to an order CANNOT be deleted. The document within the document management system can be assigned only at operational level. The long text of the reference notification can be automatically copied as the long text of the order. When an order is created based on a single notification, this notification becomes the header notification.
Denunciar Test