The maintenance engineer creates a single cycle plan with a cycle of 12 months and enters the scheduling indicator Time - key date. Which further scheduling parameter must you enter so that the calculated call date is always scheduled six months before the planned date? Please choose the correct answer. Enter a Call Horizon of 50% Enter a Tolerance of 50% Enter an Offset of six months Enter a Scheduling Period of six months.
The planner adds a stock material in the order. When does the system create reservations depending on the settings of the order type? There are 2 correct answers to this question. When the order is saved When the costs are determined When the order is released After the availability check is performed.
A technician uses the new SAPUl5-based apps. Which steps can the technician perform when processing a malfunction report? There are 3 correct answers to this question. Pause work Put in Process Complete Start work Print.
How can you define the data transfer within a technical object hierarchy? There are 2 correct answers to this question Use the reference functional locations to transfer data to the corresponding functional locations. Use the Data Origin function to change the supported fields in the functional location Use the Data Origin function to change the supported fields for pieces of equipment. Use the Data Origin function to update the supported fields for bills of material.
Which steps in the maintenance order are directly based on data within the maintenance work center? There are 2 correct answers to this question. Material availability check Capacity planning Cost calculation Damage analysis.
What can be determined using the offset within a maintenance strategy? Please choose the correct answer The cycle duration The first due date of a maintenance package The start date of the maintenance order The call date for the maintenance order.
Which parameters are calculated during scheduling of a performance-based maintenance plan? There are 2 correct answers to this question. Planned date based on sum of counter readings Daily performance based on annual estimate Planned date based on cycle and daily performance Monthly performance based on annual estimate.
How does SAP offer SAP Asset Intelligence Network? Please choose the correct answer As a license-free ERP Add-On As a cloud-based application As a license-free SAP S/4HANA Add-On As part of SAP S/4HANA On Premise.
The planner must add an activity to a notification which must be executed in the future. Which option in the notification that can be predefined in a catalog, does the planner use? Please choose the correct answer. A text in the notification item A text in the subject long text screen An activity in the notification item A task in the notification header.
What is a valid partner type within the partner determination procedure? Please choose the correct answer. Vendor (external) Business partner (gen.) Purchasing group Purchasing organization.
You use SAP Work Manager. Which operations can the Maintenance Worker execute? There are 2 correct answers to this question. Create equipment Install equipment Schedule resources Change task list Change BOM Create a work order on the ESRI map Create notification Create a measurement reading.
What are the goals of the new SAPUI5-based Fiori apps? There are 2 correct answers to this question. They are designed for simple tasks They are designed to run especially on smartphones They are designed to work on any device type They offer more functionality than usual transactions.
Which prerequisites do you require for SAP Asset Manager? There are 2 correct answers to this question. SAP Mobile Platform Mobile Add-On for SAP ERP Mobile Add-On for SAP S/4HANA SAP Cloud Platform.
Which of the following are standard functionalities of SAP Asset Manager? There are 3 correct answers to this question. Technical objects Breakdown analytics Work orders and operations ESRI maps Cost analytics.
You create a revision for a Maintenance Event Builder (MEB) scenario. Which objects can you manually assign to a revision? There are 2 correct answers to this question. Manually created notifications Manually created maintenance orders Automatically created maintenance orders from a Maintenance Plan Automatically created notifications from a Maintenance Plan.
At which level can the planner estimate costs in a maintenance order? Please choose the correct answer. At the cost center level At the work center level At the value category level At the component level.
You want to assign components to an equipment task list. There is no BOM assigned to the equipment. What is the prerequisite for using the free assignment of material? Please choose the correct answer Free assignment of material is always possible without any prerequisites. Assign the header material of a material BOM as assembly to a task list operation. Assign the header material of a material BOM to the equipment task list header. Assign the BOM usage for free assignment of material in Customizing.
What happens if you change the primary key of a functional location? Please choose the correct answer. The user must define a new labelling system for the new primary key. The functional location is immediately assigned to a new superior functional location when the new label is entered. Changing the superior functional location via alternative labeling ts not possible. The user must decide whether the functional location is assigned to a new superior functional location.
Which of the following are characteristics of CDS views? There are 3 correct answers to this question. Available for SAP HANA and any other database Modeled in SAP Business Warehouse Developed in ABAP layer Combine transactional and analytical data Provide immediate access to live data.
What is the goal of embedded analytics in SAP S/4HANA? Please choose the correct answer. Combine transactional and analytical processing Integrate SAP BusinessObjects Business Intelligence into SAP S/4HANA. Combine the HANA database with SAP BW InfoProviders. Integrate SAP BW into SAP S/4HANA.
Which actions must the engineer perform to serialize a piece of equipment? There are 3 correct answers to this question. Assign a serial number profile to the equipment master. Add a serialized material into the construction type field of the equipment master. Add a serial number to an existing equipment master. Add a serialized material to the equipment serial data view. Assign a serial number profile to the material master.
The maintenance technician wants to document the finished work steps for a technical object in a notification. Which catalog-based option in the notification can be used? Please choose the correct answer. A task in the notification item A text in the subject long text screen An entry in the object list An activity in the notification header.
Which of the following statements are correct for SAP S/4HANA Cloud - Asset Management? There are 2 correct answers to this question. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network You do NOT have access to the SAP S/4HANA back end system You have access to the SAP S/4HANA back end system You can configure SAP S/4HANA Cloud via the self-service configuration UI.
Which of the following can you assign to an equipment category via a view profile? There are 2 correct answers to this question. Serial data Warranty Manufacturer data Configuration.
You create a maintenance order with header-based costing. At which level can the planner display the expected costs? There are 2 correct answers to this question. At the component level At the work center level At the value category level At the cost element level.
What are the effects when the planner releases a maintenance order? There are 3 correct answers to this question. The planner can print the job papers. The warehouse clerk can post a goods issue. The planner CANNOT change planned costs. The technician can record confirmations. The planner can estimate costs.
Where can you see the results of the material availability check for maintenance orders? There are 2 correct answers to this question. Within a maintenance order In the report Maternal: Where-Used List In the material reservation list in inventory management In the single-level list editing function for maintenance orders.
Which information does the usage list for equipment display? Please choose the correct answer. Material consumption Failure frequency Validity periods Operating hours.
Which objects can you use in the safety measure list? There are 2 correct answers to this question. Work approval Documents Work clearance documents Permits.
How does a performance-based maintenance plan calculate the interval between start date and planned date? Please choose the correct answer. Cycle length divided by (annual performance / 365) Cycle length divided by ((scheduling period) x (cycle modification factor)) Cycle length divided by monthly performance Cycle length divided by annual performance.
Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question Only one object part One or more causes of damage Only one cause of damage One or more object parts.
The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct answers to this question? A text in the subject long text screen An entry in the object list A task in the notification item An activity in the notification header.