option
Cuestiones
ayuda
daypo
buscar.php
TEST BORRADO, QUIZÁS LE INTERESE: PM-2023-05
COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del Test:
PM-2023-05

Descripción:
SAP PM-2023-05

Autor:
AVATAR
RS
OTROS TESTS DEL AUTOR

Fecha de Creación:
03/11/2023

Categoría: Informática

Número Preguntas: 32
COMPARTE EL TEST
COMENTARNuevo Comentario
No hay ningún comentario sobre este test.
Temario:
Where can a technician confirm the required time for work on a maintenance order? There are 3 correct answers to this question In the collective time confirmation In the technician's confirmation list In the maintenance order In the Manage Orders and Notifications in Information Center tile In the Repair Malfunction tile.
Which scheduling parameters are used in a multiple-counter plan? There are 2 correct answers to this question. Start date Factory calendar Scheduling indicator Scheduling period.
What do you need to configure to enable entries in the action log of an equipment? Please choose the correct answer. Define the corresponding history-related field for the equipment reference category. Define an additional business view for the equipment category. Activate the change documents for the equipment category. Select the time segment check box for the equipment category.
Which valuation category do you use to refurbish the material? Please choose the correct answer. Origin Retail In house/External Procurement Condition-based.
What does the planner use to trigger the procurement of external services from a maintenance order? Please choose the correct answer. Special activity type Special order type Special control key Special maintenance activity type.
How does SAP offer SAP Asset Intelligence Network? Please choose the correct answer. As a license-free ERP Add-On As part of SAP S/4HANA On Premise As a cloud-based application As a license-free SAP S/4HANA Add-On.
Which steps support the maintenance technician in the Report and Repair Malfunction Fiori app (3 tiles)? There are 3 correct answers to this question. Verify planned and actual costs. Find malfunction records already created in a list. Plan repair work for responsible work center. Assign production resource tool (PRT) to operation Complete the malfunction report.
Which options do you have to allow the assignment of order operations to object list entries? There are 3 correct answers to this question. To all notifications Only to notifications created via maintenance plans To all object list entries To all maintenance plans To all task lists.
Which of the following statements about SAP Asset Manager are true? There are 3 correct answers to this question. SAP Asset Manager can run on smart watches SAP Asset Manager can be used offline. SAP Asset Manager is available for SAP S/4HANA and SAP ERP. SAP Asset Manager provides single sign-on functionality. SAP Asset Manager is available for Windows platform.
Which functionalities are available in the SAP Asset Manager for a maintenance worker? There are 2 correct answers to this question Display maps Display and maintain technical objects Confirm time sheets Attach documents Schedule resources Change task list Change BOM Create a work order on the ESRI map.
Which of the following objects can you directly assign when you define the work center master record? There are 2 correct answers to this question Organizational Unit Calculation Key Capacity Category Business Partner.
Which operations can the responsible person perform after a maintenance order is technically completed? There are 3 correct answers to this question Create an invoice receipt for delivered materials Change the planned costs Update the estimated costs Lock or unlock the order Change the settlement rule.
Where can the maintenance planner perform a material availability check? There are 2 correct answers to this question. Via the multi-level order list (SAP GUI) Via the Change Maintenance Order SAP Fiori app Within the SAP Fiori-based background job Via the Manage Maintenance Order List SAP Fiori app.
What must you assign for a cross-plant planning scenario? Please choose the correct answer The same planner group to multiple planning plants Multiple planning plants to a maintenance plant The same planning plant to multiple maintenance plants The same planner group to multiple maintenance plants.
Which of the following statements are correct regarding a cross-plant planning scenario? Please choose the correct answer Multiple maintenance plants are assigned to a planning plant Multiple planning plants are assigned to a maintenance plant It is not supported in SAP S/4HANA It combines maintenance plants in different controlling areas.
Which material type is the best choice if you only want to create a structure element within the BOM? Please choose the correct answer Spare part (ERSA) Operating supplies (HIBE) Maintenance assembly (IBAU) Non-valuated material (UNBW).
A pump requires regular maintenance based on the through put in liters. How can the planner specify the call horizon in the performance-based maintenance plan? Please choose the correct answer. In hours As a quantity of liters As percentage of the cycle or in days. In months.
The maintenance engineer creates a single cycle plan with the following parameters: The call object is maintenance order The indicator for separate completion of maintenance call date is NOT set The indicator for completion requirement is NOT activated Both shift factors are set to 100% Which date is relevant for the calculation of further planned dates for call objects? Completion date of the maintenance plan Technical completion date of the maintenance order Planned date of the next call number Basic finish date of the maintenance order.
How do you map a counter replacement in SAP S/4HANA Asset Management? Please choose the correct answer. Deactivate the current counter and create a new counter Create a new measurement document and assign a valuation code for counter replacement Create a new measurement document marked as a counter replacement Replace the defective piece of equipment to which a counter is assigned.
What is the function of the offset within a maintenance strategy? Please choose the correct answer It shifts the next planned date due to the delay of the confirmation. It extends the cycle length of a maintenance package. It sets the start date of the maintenance plan. It determines the first due date of a maintenance package.
Which activities can the planner perform by using the Maintenance Planning Overview with the default filters? There are 3 correct answers to this question. Analyze released maintenance orders whose end date is in the past and were NOT finally confirmed. Analyze outstanding notifications that have NOT been assigned to a maintenance order. Display purchase orders for non-stock materials for which the goods receipt was NOT posted. Analyze confirmed maintenance orders which were NOT settled. Display approved purchase requisitions for non-stock materials for which NO purchase order was generated.
Which statements are correct about Ul technologies in SAP S/4HANA Asset Management? There are 2 correct answers to this question. SAP Fiori launchpad only supports SAP UI5 apps. SAP GUI transactions can be used in the SAP Fiori launchpad. Web Dynpro apps can be used in the SAP Fiori launchpad The cloud version can also use SAP GUI for Windows.
You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? There are 2 correct answers to this question. Assign a piece of equipment with an allocated measuring point to a task list operation. Assign a measuring point as a production resources/tools (PRT) to a task list operation. Assign an inspection document as PRT to the task list operation. Assign an inspection lot to the task list header.
Which functionalities are available in the SAP Asset Manager for a maintenance worker? There are 2 correct answers to this question. Confirm time sheets Attach documents Display maps Display and maintain technical objects Change BOM Create a work order on the ESRI map Schedule resources Change task list .
The planner uses control key PM02 to purchase external services. What are valid process steps? There are 3 correct answers to this question. Book the goods receipt Accept the service entry sheet Create the purchase order Create the service entry sheet Book the invoice.
Which of the following statements are correct regarding a cross-plant planning scenario? Please choose the correct answer It is not supported in SAP S/4HANA. It combines maintenance plants in different controlling areas. Multiple planning plants are assigned to a maintenance plant. Multiple maintenance plants are assigned to a planning plant.
Which steps support the maintenance technician in the Report and Repair Malfunction Fiori app (3 tiles)? There are 3 correct answers to this question. Plan repair work for responsible work center Verify planned and actual costs. Assign production resource tool (PRT) to operation. Find malfunction records already created in a list. Complete the malfunction report.
You want to create a new functional location. Which configuration steps are required? There are 2 correct answers to this question. Define the reference functional location. Define the number range for the functional location category. Define the structure indicator. Define the functional location category.
Which order type do you need when you refurbish defective parts? Please choose the correct answer. Order type with refurbishment indicator. Order type with investment indicator. Order type for breakdown maintenance. Order type for preventive maintenance.
Which of the following statements are correct for SAP S/4HANA Cloud - Asset Management? There are 2 correct answers to this question. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network. You do NOT have access to the SAP S/4HANA back end system. You have access to the SAP S/4HANA back end system. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question Confirm time sheets • Attach documents Schedule resources • Change task list Display maps • Display and maintain technical objects Change BOM • Create a work order on the ESRI map.
What are mandatory characteristics of orders with Operation Account Assignment (OAA)? Note: There are 3 correct answers to this question Overall costs are dynamically summed up on the header level. A technical object must be assigned to an order operation Costs are stored only for the operation object Purchase requisitions have the operation as account assignment. The settlement rule is maintained on the header level.
Denunciar Test