You want to view transactional and analytical processing data in the Technical Object Breakdowns SAP Fiori app. What is the source of the information? Please choose the correct answer. TS of BO. InfoSet for SAP Query. Core Data Services (CDS view). BW query. BW InfoCube.
You want to have several plan dates calculated in a maintenance plan. Which scheduling parameter do you use? Please choose the correct answer. Scheduling indicator. Lead float. Call horizon. Scheduling period.
Which of the following is a prerequisite for external refurbishment? Please choose the correct answer. Create the purchasing info record for the external provider. Define the order type for external refurbishment. Activate the subcontracting indicator in an external activity. Select the material group for externally refurbished materials.
To which objects can you assign a safety plan? There are 2 correct answers to this question. Maintenance Order. Permit. Work Approval. Task List.
Which operations are possible when you cancel the technical completion of a maintenance order? There are 2 correct answers to this question. Change the priority. Cancel status Released. Book a goods receipt. Change the estimated costs.
How does SAP offer SAP Asset Intelligence Network? Please choose the correct answer. As part of SAP S/4HANA On Premise. As a cloud-based application. As a license-free SAP S/4HANA Add-On. As a license-free ERP Add-On.
Which information does the usage list for equipment display? Please choose the correct answer. Material consumption. Operating hours. Validity periods. Failure frequency.
The planner must add an activity to a notification which must be executed in the future. Which option in the notification that can be predefined in a catalog, does the planner use? Please choose the correct answer. A text in the notification item. A task in the notification header. An activity in the notification item. A text in the subject long text screen.
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? There are 2 correct answers to this question. Reservations are created only after a material availability check has been performed. For the combination of order type and planner group you can decide when reservations are created. Open reservations can be cleared when 4 maintenance order operation is finally confirmed. All open reservations are closed when the maintenance order is set to TECO.
You plan to use the integration of maintenance orders and Project System (PS) objects. To which PS objects can you assign a maintenance order? There are 2 correct answers to this question. WBS element. Project definition. Network header. Network operation.
You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? There are 3 correct answers to this question. Create a measuring point. Change a reference location. Edit classification data and characteristics. Assign a subordinate piece of equipment. Assign documents.
Which functionalities belong to the current portfolio of SAP BusinessObjects Business Intelligence? There are 2 correct answers to this question. SAP QuickViewer. SAP Crystal Reports. Plant Maintenance Information Systems (PMIS). SAP Lumira.
Which of the following are characteristics of CDS views? There are 3 correct answers to this question. Available for SAP HANA and any other database. Developed in ABAP layer. Provide immediate access to live data. Combine transactional and analytical data. Modeled in SAP Business Warehouse.
What is the correct receiver object type for the settlement of a refurbishment order? Please choose the correct answer. The cost center. The material. The WBS element. The fixed asset.
The planner adds a non-stock material in the order. From where can the delivery address be derived according to the predefined access sequence? There are 2 correct answers to this question. From the equipment. From the notification. From the material master. From the functional location.
You need to create a structuring element within a BOM without the view for physical inventory. Which material type do you use? Please choose the correct answer. Spare part (ERSA). Maintenance assembly (IBAU) O Operating supplies (HIBE) Non-valuated material (UNBW).
The planner creates a maintenance task list for an inspection round in which counter readings will be created. What must the planner assign within the task list? Please choose the correct answer. A measurement point as inspection point in the header. A measurement point as component in the operation. A measurement point as inspection characteristic in the operation. A measurement point as production resource tool in the operation.
The technical completion of the actual maintenance order was posted with a delay of 10 days. How can the planner shift the next planned date by the same amount? Please choose the correct answer. Set the shift factor for late completion to 10%. Set the shift factor for early completion to 100%. Set the shift factor for early completion to 10%. Set the shift factor for late completion to 100%.
Where can a technician confirm the required time for work on a maintenance order? There are 3 correct answers to this question. In the technician's confirmation list. In the Repair Malfunction tile. In the collective time confirmation. In the Manage Orders and Notifications in Information Center tile. In the maintenance order.
You have several defective parts that you need to send to a subcontractor to get them refurbished. What must you do to trigger the external refurbishment within the refurbishment order? Please choose the correct answer. Create a manual purchase requisition and add the refurbishment order number. Create an external activity (control key PM02) within the refurbishment order. Create an internal activity (control key PM01) and add the defective material as non-stock component. Create a manual purchase order and add the refurbishment order number.
Which SAP UI technology is used for the technician's job list? Please choose the correct answer. SAP GUI for HTML. SAPUI5. SAP GUI for Windows. User Interface and User Experience.
Which of the following partner types is supported out of the box in technical objects? There are 2 correct answers to this question. Organizational unit. Controller. Contractor. Maintenance plant.
What must you maintain before you create the measuring points or counters for your technical objects? Please choose the correct answer. Create a code group in the necessary catalog. Create necessary characteristics in the classifications system. Assign characteristics to classes. Enter an annual estimate.
When the planner adds a stock material in the order, which activities are performed next in relation to the order? There are 3 correct answers to this question. Post the goods issue. Print the material provision list. Perform the availability check. Post the goods receipt. Create the purchase order.
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? There are 3 correct answers to this question. Scheduling period. Shift factors. Estimated annual performance. Start counter reading. Preventive Maintenance.
In which object can you change the Offset of a Maintenance Plan Strategy? Please choose the correct answer. Maintenance Plan Header. Maintenance Plan Category. Maintenance Plan Item. Maintenance Package.
When the planner adds a non-stock material in the order, what are valid process steps? There are 3 correct answers to this question. Post the goods issue. Post the invoice. Post the goods receipt. Post the credit memo. Create the purchase order.
What is a feature of the Technical Object Breakdowns SAP Fiori app? Please choose the correct answer. The underlying CDS View. The underlying lnfoCube. The visualization in SAP Lumira. The presentation in an SAP BW Query.
Which of the following parameters are available when you define a new Maintenance Plan Category? There are 3 correct answers to this question. Completion Date. Call Object. Order Type. Maintenance Activity Type. Change Documents.
You want to assign your maintenance orders to a WBS element. Which of the following statements are correct? There are 2 correct answers to this question. The assignment is always made to a network activity of the WBS element. The assignment always has to be made manually. The settlement receiver WBS element can be determined automatically. The assignment can be made automatically.
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question Scheduling period Start counter reading Estimated annual performance Counter overflow reading.
You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question. The effective costs are posted as a credit memo to a price difference account The effective costs are posted to the respective batch (valuation type). The goods receipt for the batch refurbished is posted with the value of the standard price. The goods receipt for the batch refurbished is posted with the value of the moving average price.