option
Cuestiones
ayuda
daypo
buscar.php
TEST BORRADO, QUIZÁS LE INTERESE: PM-2023-07
COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del Test:
PM-2023-07

Descripción:
SAP PM-2023-07

Autor:
AVATAR
RS
OTROS TESTS DEL AUTOR

Fecha de Creación:
05/11/2023

Categoría: Informática

Número Preguntas: 31
COMPARTE EL TEST
COMENTARNuevo Comentario
No hay ningún comentario sobre este test.
Temario:
Which material type is the best choice if you only want to create a structure element within the BOM? Please choose the correct answer. Maintenance assembly (IBAU). Spare part (ERSA). Operating supplies (HIBE) . Non-valuated material (UNBW).
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100%. Which date is relevant for the calculation of future planned dates if the maintenance work is delayed? Please choose the correct answer. Technical completion date of the maintenance order. Planned date of the next call, independent of maintenance order dates. Planned end date of the maintenance order. Date of the final time confirmation.
To which SAP objects can the planner assign a maintenance order to make a budget available for this order? There are 2 correct answers to this question. Functional location with allocated budget. Investment program item with allocated budget. Network header with allocated budget. WBS element with allocated budget.
The maintenance engineer creates a single cycle plan with a cycle of 12 months and enters the scheduling indicator Time - key date. Which further scheduling parameter must you enter so that the calculated call date is always scheduled six months before the planned date? Please choose the correct answer. Enter a Tolerance of 50%. Enter a Call Horizon of 50%. Enter an Offset of six months. Enter a Scheduling Period of six months.
You set up the process for Inspection Rounds, so that the technician can enter measurement readings in a simplified way using the overall t me confirmation. What must you do before you set up a general maintenance task list? There are 2 correct answers to this question. Create a piece of PRT equipment and allocate it using the PRT overview button. Assign a piece of equipment with allocated measuring point to a Task List Operation. Assign a measuring point as a PRT to a Task List Operation. Assign a measuring point as inspect on point to the Task List Header.
Two Maintenance Packages of a Maintenance Strategy are due at the same time. Which parameter determines that only one of these maintenance packages is executed? Please choose the correct answer. Package Sequence. Hierarchy Lead Float. Offset.
Which of the following can you assign to an equipment category via a view profile? There are 2 correct answers to this question. Serial data. Warranty. Configuration. Manufacturer data.
What can a planner monitor with the Resource Scheduling for Maintenance Planners SAP Fiori app? There are 2 correct answers to this question. Notifications without maintenance orders. Maintenance orders NOT confirmed. Workload of work centers. Non-available stock materials.
Which of the following are mandatory parameters for a counter used for performance-based maintenance planning? There are 2 correct answers to this question. Counter Overflow Reading. Code Group. Estimated Annual Performance. Characteristic.
In which component do you have to perform most of the configuration to set up SAP Asset Manager? Please choose the correct answer. SAP Mobile Platform. SAP ERP. SAP S/4HANA. SAP Cloud Platform.
Which objects can a personnel number be assigned to directly? There are 2 correct answers to this question Work center. Business partner. Planner group. Equipment.
What are the goals of the new SAPUI5-based Fiori apps? There are 2 correct answers to this question. They are designed for simple tasks. They offer more functionality than usual transactions. They are designed to run especially on smartphones. They are designed to work on any device type.
In which maintenance object can you use an activity type? There are 2 correct answers to this question. Work Center. Task List Header. Maintenance Order Operation. Maintenance Order Header.
Which period does the planner define when using the scheduling period in the maintenance plan? Please choose the correct answer. The period in which the system job for scheduling runs. The period in which a shift of planned dates is allowed. The period for which the system generates planned or call dates. The period for which orders are created in advance.
Which of the following is a characteristic of SAP S/4HANA? Please choose the correct answer. It is available on AnyDB and SAP HANA. It is only available as cloud-based product. It is an update of SAP ERP. It is a new product.
What are the prerequisites to run SAP Work Manager? There are 3 correct answers to this question. Device operating system (iOS, Android, or Windows). SAP Mobile Platform. Mobile Add-On for SAP S/4HANA. SAP Geographical Enablement Framework. Sybase Unwired Platform.
Which functions are available in the Resource Scheduling for Maintenance Planners app? There are 2 correct answers to this question. Print job papers from a maintenance order. Schedule and dispatch maintenance operations by shifts Cancel dispatched maintenance order operations. Monitor maintenance order operations due in the next 4 weeks.
You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information? Please choose the correct answer. Usage list. Location Analysis list. Structure Display. Historical Orders list.
Which of the following are standard functionalities of SAP Asset Manager? There are 3 correct answers to this question. Cost analytics. Technical objects. ESRI maps. Breakdown analytics. Work orders and operations.
How do you activate subscreens for equipment master data in customizing? Please choose the correct answer. Create a screen group info type and assign the group to the equipment category. Create a view profile and assign it to the equipment category. Assign object information parameters to the equipment category. Define the field select on for the equipment master data.
You create an Equipment Task List for a piece of equipment without BOM assignment. How can you assign components to a Task List Operation of this Equipment Task List? Please choose the correct answer. Assign the BOM usage for free material assignment in Customizing. Freely assign material as components to the Task List Operation. Assign the header material of a material BOM as assembly to a Task List Operation. Select components from the BOM to the Task List Operation. Manually assign the BOM usage to a Task List Header. Add components from the BOM to the Task List Operation. Assign the header material of a mater al BOM to the Equipment Task List Header. Select components from the BOM to the Task List Operation. .
What are the effects when the planner technically completes the maintenance order? There are 2 correct answers to this question. The technician CANNOT create time confirmations. The system deletes open purchase orders. The planner CANNOT add an order operation. The system closes open reservations.
Which operations can the responsible person perform after a maintenance order is technically completed? There are 3 correct answers to this question. Create an invoice receipt for delivered materials. Update the estimated costs. Change the settlement rule. Lock or unlock the order. Change the planned costs.
You want to display vehicle-specific data for a piece of equipment. How do you proceed? Please choose the correct answer. Assign a view profile to the combination of fleet object type and equipment category. Assign a view profile to an equipment category for fleet equipment. Assign a view profile to the combination of fleet object type and usage type. Define the field selection for the vehicle equipment master data.
What must you define for the mater all master before you can refurbish the corresponding material? Please choose the correct answer. MRP type replenishment. Transport group 0001. Serial number profile. Spit valuation of stocks.
Where do you specify the services that are included in a warranty? Please choose the correct answer. In the warranty header of the master warranty. In the warranty item of the master warranty. In the warranty subscreen within the equipment master. In the documents subscreen within the equipment master.
What is the primary goal of SAP Predictive Maintenance and Service? Please choose the correct answer. To collect and analyze machine data. To provide advanced cost controlling analyses. To create a cloud-based equipment directory. To pre-calculate maintenance projects.
You create two maintenance packages and only one package should be executed at a time. Which parameter determines this? Please choose the correct answer. Offset. Hierarchy. Subsequent buffer. Package sequence.
What is the goal of embedded analytics in SAP S/4HANA? Please choose the correct answer. Integrate SAP BusinessObjects Business Intelligence into SAP S/4HANA. Combine the HANA database with SAP BW InfoProviders. Combine transactional and analytical processing. Integrate SAP BW into SAP S/4HANA.
Which of the following statements about orders with operation account assignment (OAA) are correct? There are 3 correct answers to this question. Costs are only stored for the operation object. Overall costs are dynamically summed up on header level. The settlement rule is maintained on header level. Purchase requisitions have the operation as account assignment. A technical object must be assigned to an order operation.
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question Edit classification data and characteristics. Create a task list for functional location Assign documents Change a reference location. Assign a subordinate piece of equipment.
Denunciar Test