Cuestiones
ayuda
option
Mi Daypo

TEST BORRADO, QUIZÁS LE INTERESES/4 HANA Conversion

COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del test:
S/4 HANA Conversion

Descripción:
S/4 HANA Conversion

Autor:
AVATAR

Fecha de Creación:
09/03/2021

Categoría:
Informática

Número preguntas: 51
Comparte el test:
Facebook
Twitter
Whatsapp
Comparte el test:
Facebook
Twitter
Whatsapp
Últimos Comentarios
No hay ningún comentario sobre este test.
Temario:
During an SAP S/4 HANA Conversion with DMO, Which of the following actions take place during the business downtime of the SUM procedure? Note : There are 3 correct answers to this question. Execution of SPAU modification adjustment Execution of XPARs and AIMs Execution of SPDD Modification and adjustment Execution of eCATTs for business validation tests Creation of the table structures in the new SAP HANA database .
A table has been chosen for the Incremental Table Conversion (INCV) How are database operations synchronized between the source and the target table ? Deletes are marked in the flag field of the target table by the delete trigger Deletes are directly executed in the target table by the delete trigger Inserts are marked in the flag field of the source table by the insert trigger updates are directly executed in the target table by the update trigger.
You are running an SAP ECC System For Which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) Capabilities ? Note: There are 3 correct answers to this question. Use DMO for SUM Upgrade the system Apply Support Packages Apply an Enhancement Package Perform an SAP S/4 HANA Conversion.
you Want to use the downtime-optimized data conversion for your SAP S/4 HANA Conversion What is the main difference from a standard SAP S/4HANA conversion The Respository is migrated in uptime An additional temporary database is used during uptime Dedicated application tables are migrated in uptime Long running XPRAS and AIM are executed in uptime .
You are performing an upgrade of an SAP ECC development system with SUM What is the earlist point when the upgrade is considered complete and you can allow all dialog users to log on to the system? During the SUM roadmap step"PostProcessing", in paralled with post procedure steps After the SUM roadmap step"Execution" is finished and before "Postprocessing" During the SUM roadmap step"Postprocessing',after the post procedure steps are complete After the SUM roadmap step "postprocessing" and post procedure steps are finished.
You are upgrading a three-system landscape DEV-QAS-PRD.The upgrade Project contains a unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system What do you need to consisder? The transport between unicode and non unicode systems is forbidden The upgrade of the PRD must be finished before you start new development in DEV The transport domains of the systems DEV and QAS must differ from the transport domain of system PRD The upgrade of the PRD must be finished before you import any tranport from the upgraded DEV system into the PRD.
You are planning an SAP S/4 HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase ? Note:There are 2 correct answers to this question Perform the migration of data into the new data structure Run the database migration to the SAP HANA database check the compatibilty of custom code with SAP S/4HANA Apply the recommendations of the simplification list.
You are performing an SAP S/4 HANA conversion for your production system This conversion requires that certain business functions are switched on. Following SAP recommendations,how will you achieve this? Note:There are 2 correct answers to this question. Import a transport request from the development system that contains the recording of the activation Specify the business functions that need to be switched on during the prepare part of SUM Activate the required business functions manually in the production system. During conversion, SUM delivers some business functions already activated.
You are planning to upgrade you SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade? Perform the upgrade to SAP ECC 6.08 before the Unicode conversion Perform the unicode conversion before the upgrade to SAP ECC6.08 Combine the upgrade and the unicode conversion using the combined Upgrade & Unicode Conversion ( CU & UC) procedure Combine the upgrade and the unicode conversion using the Twin Upgrade & Unicode Conversion ( TU & UC ) Procedure.
You want to execute a unicode Conversion only Which Approach do you need to follow ? SWPM using the Backup/ Restore procedure SUM without DMO SWPM using the load procedure SUM with DMO.
Regarding an SAP upgrade, What does the major SAP note for the version of SUM you are using usually contain? Note: There are 3 correct answers to this question An Overview about possible upgrade paths A detailed description of new SUM features The latest version of the SUM guide The corrections to the SUM Guide The Link to different patch level of SUM .
you download content from the SAP note 10000009 ("ASU Toolbox 2008") Which transaction need to be executed to use that content in the ASU Toolbox? /ASU/START (Start ASU Toolbox) /ASU/UPGRADE(Start ASU Toolbox in Upgrade Mode ) /ASU/SHOW_NOTE (Show SAP Note via Web_Browser) /ASU/SSM ( ASU Simple Schedule Manager ).
Which Guides contain information about SUM phases starting with "EU_CLONE_"? Note: There are 2 correct answers to this question The Application Guide The SAP S/4HANA Conversion Guide The Major SUM Guide The DMO Guide .
What do you need to know about the SAP ERP Application Guide? Note: There are 2 correct answers to this question It contains a section " free space requirement" It is a database-specific document It contains a troubleshooting section It is target release specific.
Sum was registered at the SAP Host Agent Based on which information does the SAP Host Agent determine the path to the SUM directory? The path was stored in file sumabap.conf during registration The path was stored in file host_profile during registration The path was stored to the enivronment of user <sid>adm during registration The path is taken from the URL entered in the browser to start SUM.
How does SUM recognize modification adjustment transports from predecessor systems? By searching for transport requests in the file umodauto.lst By searching for transport requests in DIR_TRANS,subdirectory"transport" By searching for transport requests that are assigned to the project SAP_ADJUST By searching for transport requests named <SID>K0<number>.
Which steps should be performed during the adjustment of dictionary object (SPDD) in the developmant system befor SUM continues? Note:There are 2 correct answers to this question Manually activate the adjusted dictionary object Assign the transport request as a modification adjustment transport Create"modif" versions of the object that you need to adjust Release the transport request containing the modification adjustment.
You are performing as S/4HANA conversion of the development system Which credentials do you usein which system to perform the adjustment of programs and other non-dictionary repository object(SPAU)? Credentials of a named user in the client 000 of the shadow system Credentials of user DDIC in the development client of the development system Credentials of user DDIC in client 000 of the shadow system Credentials of a named user in the development client of the develpment system .
You are performing as S/4HANA conversion of the development system Which credentials do you usein which system to perform the adjustment of programs and other non-dictionary repository object(SPDD)? Credentials of a named user in the client 000 of the shadow system Credentials of a named user in the development client of the develpment system Credentials of user DDIC in the development client of the development system Credentials of user DDIC in client 000 of the shadow system .
During the upgrade of your develoment system, you run into the adjustment of non-dictionary object, handeled by transcation SPAU there you find programs that are shownin status "automatic adjustment"(green traffic light) What will happen with these programas when you continue with your upgrade without performing any other actions inside your SAP system? SUM refuses to continue unless you have marked a transport request as modifcation adjustment transport SUM continues with the next phase and your modification are lost SUM continues with the next phase and your modification are kept as in the start Before continues with the next phase SUM asks for modifcation adjustment transport .
Your are preparing fro a standared SAP S/4HANA conversion? Note: There are 2 correct answers to this question Kernel for target release, Windows, SAP MaxDB Kernel for target release, Windows, SAP HANA Kernel for target release, Linux, SAP HANA Kernel for source release, Windows, SAP MaxDB.
What do you need to consider when performing the pre-checks for an SAP S/4HANA conversion? You need to build up a pre-check framework by applying SAP notes The pre-checks are executed in the develeopment system and the results are transported into the subseuent systems Depending on the SAP S/4HANA version, there are different pre-checks frameworks You need an SAP system based on AS ABAP 7.50 or above for the pre-checl framework.
You performed a custom code check for an SAP S/4HANA conversion In which transactions can you review the results? Note: There are 2 correct answers to this question SYCM (Simplification Database Content) SE80 (Object Navigator) SAT (Runtime Analysis) ATC (ABAP Test Cockpit).
In which scenarios do you need to use SUM 2.0 insted of SUM 1.0? Note: There are 2 correct answers to this question SAP S/4HANA conversion to SAP S/4HANA 1709 Updating to SAP ECC 6.07 using DMo Using DMO when applying Support Packages to SAP ECC 6.07 Upgrading to SAP ECC 6.08 without using DMO.
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC).How can you get the lastest content of the simplification datebase? Genetrate it by analyzing the specifice custom code via RFC Apply the corresponding SAP note via Note Assistant Download it from SAP Support Poratl Configure it within trancation ATC.
You want to perform a Custom Code Check via ABAP Test Cockpit (ATC) in preparation for your SAP S/4HANA conversion What kind of SAP system can you use to generate the Custom Code Migration Worlist? The corresponding SAP Solution Mangager 7.2 system A Standalone SAP system with AS ABAP 7.51 or above An SAP S/4HANA 1709 sandbox system The SAP ECC development system at start release level.
Which preparation steps must be performed for an SAP s/4HANA conversion ? Note: There are 2 correct answers to this question Delete client 006 (Early Watch Client) Uninstall fiori apps not released for SAP_UI 7.50 Uninstall industry extensions not supported by SAP S/4HANA Install add-on SAP Gateway 7.50.
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. The Source system is non-Unicode and the traget database is a scale-out system. What do you need to consider? Note: There are 2 correct answers to this question The target database size increases temporarily because of the Shadow Repository Network capacity between exporting and importing R3load processes must be considered Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31 SAP HANA Landscap Reorganization requires a manual step to edit a file .
What Phases of SUM will be excuted during as SAP s/4HANA conversion incuding DMO? Note: There are 2 correct answers to this question Phases EU_IMPORT Phase RUN_RSDBSCPY Phase DOWNCONF_DTTRANS Phase RUN_RESPTBFIL_ISUTABU Phases DIFF.
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM? The repetition option allows you to repeat the complete migration The repetition option allows you to run the migration without a shadow system The benchmaking option allows you to migration a specified set of tables The benchmaking option allows you to repeat the uptime migration.
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN) During uptime Post-downtime During downtime During SPDD.
what are the benefits of using the Benchmarking option of the DMO for SUM? You can find the optimal number of parallel R3load processes by monitoring host performance You can verify that the content of the download directory matches the stack.XML file You can obtain migration duration files that can be used to optimize the next runs You can find the optimal number of parallel R3load processes by monitoring host performance You can record the modification adjustment during migration and use the transports in the next runs.
You have chosen the "Advanced" option during the main configuration of the SUM tool Which steps take place via the shadow instance? Note: There are 2 correct answeres to this question Switch to new repository (EU_SWITCH) Modification adjustment (SPDD) conversion of application tables (PARCONV_UPG) Activation of dictionary objects (ACT_UPG).
During a DMO procedure with SUM, after which phase is the repository available on the target database shadow repository creation (EU_IMPORT*) Downtime migration (EU_CLONE_MIG_DT_RUN) Parallel distribution (PARDIST_SHD) Uptime migration (EU_CLONE_MIG_UT_RUN).
You want to perform an SAP S/4HANA conversion using SUM with DMO Which steps run before the beginning of the technical downtime, independent of your SUM configuration? Note: There are 3 correct answers to this question. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE Import of dictionary objects from the download directory in phase DDIC_UPG Import of upgrade and language data from the download directory in phase TABIM_UPG Activation of dictionary objects in phase ACT_UPG Generation of the new ABAP loads in phase RUN_SGEN_GENER6.
You are using DMO of SUM. you defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_DT_RUN is running. In the Charts control center you can see 40 Process Buckets being executed in parallel Why are 40 process buckets executed in parallel? SUM is still running in uptime; the number of 40 defined R3load processes is considered There is a maximum of 40 parallel R3load processes within this specific downtime phase These are 40 pairs of R3load processes, so there are 80 R3load processes running The number of CPU cores does not allow more than 40 R3load processess to be run in parallel.
Which are valid options to check the progress of the database migration in a standard DMO procedure? NOTE: There are 2 correct answers to this question. Check the dump size of the database export on disk Check the log files written under "SUM\abap\log" Check logs for jobs starting with "RSUPG_SGEN" in the system Check the "charts control center" in the SUM UI.
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error? NOTE: There are 2 correct answers to this question. In the job log for the corresponsing job in SM37 (Job Overview) In the corresponding R3trans log files of this phase In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log.
The SUM procedure stops with an error during uptime How can you identify the current phase, the one in which SUM encountered an error? NOTE: There are 2 correct answers to this question. Check the most recent entries shown in file sapevt.trc Check the most recent enries in SAPup.log Check the system log (transaction SM21) of the SAP system Check the messages shown by the SUM UI.
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this? NOTE: There are 2 correct answers to this question. Check for running R3load processes on the host of the primary application server Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp Check for runnning R3trans processes on the host of the primary application server Check for running batch jobs in the shadow system via Job Overview (SM37).
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAP up_and.par? A migration of the SAP system to a new hardware is performed, withour performing an SAP S/4HANA conversion An SAP S/4HANA conversion is performed, without changing the software A Change of the database type is performed,without changing the software components An upgrade of the software compinents is performed, without changing the database type.
You are using the maintenance planner to calculate the required software components for your SAP S/4HANA conversion. what do you need to know regarding SUM? In addition to the software components calculated by the maintenance Planner, SUM needs to be downloaded separately from the SAP Software Center The product specific SUM that is calculated by the Maintenance planner is required The SP level of SUM is the same as the SPS level of the SL Toolset As soon as the next SP level of SUM is available, the current version of SUM passes into patch on request mode immediately.
You are performing an upgrade with SUM using DMO. You entered a specific number of R3load processes during Roadmap step "Extraction". Where can you change this during the migration via the "More->utilities" option of the SUM UI? NOTE: There are 2 correct answers to this question In DMO migration preparation In SUM Parameteres In SUM Phaselist In DMO Migration Control Center.
When using the DMO of SUM, which files can be handled by SUM in the download directoty? NOTE: There are 2 correct answers to this question MIGRATE_DT_DUR.XML file from a previous run Stack XML file calculated by the Maintenance Planner Parameter file SAPup_add.par Breakpoint configuration file SAPUPPHAS.BRk.
What is the benefit of using the file UPGANA.XML from a previous SUM run? To auto-fill specific fields on selected screens on the SUM UI To skip selected phases during the SUM run To make the progress information within SUM UI more accurate To repeat specific phased during the SUM run.
Which additional configuration options are offered by SUM when selecting "Switch expert more on" in main configuration option standard? Keep archiving on during the whole procedure Use the Near Zero Downtime Maintenance Technology (NZDM) Reuse a profile for the shadow instance from a previous run Choose the instance number of the shadow instance.
You are executing a SUM procedure to update an SAP system in standard mode. When will the shadow system be stopped for the last time? Before the Downtime starts Early in the Downtime At the end of the Downtime As part of the Cleanup process.
Which maintenance events are possible with SUM for an SAP system baed on AS ABAP 7.40 and above? NOTE: There are 3 correct answers to this question. Database migration Release upgrade Support package stack update Homogenous system copy Dual Stack split.
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison? It performs a comparison on all tables using row counts It performs a comparison of all tables using check sum It performs a comparison on selected tables using check sum It does not perform any table contents comparison.
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column. What does the "Calculated level" indicate for those software components? The SAP support packages found in the download directory The SAP support packages that will be bound to the upgrade The SAP support packages contained in the upgrade media The SAP support packages calculated by the Maintenance Planner.
Which Circumstances will allow SUM to run without the creation of a shadow system? Using the main configuration option "Single system" when installing an Add-on Using the main configuration option "Standard" when applying Support packages Using the main configuration option "Single System" in case of an upgrade Using the database migration option (DMO) for SUM.