Temario:

You can maintain the following objects in the Project Builder: Choose the correct answer(s). 4. A Work Breakdown Structure. B Internal Order. C Maintenance Order. D Network. E Milestone. F Project definition.

WBS elements can be linked together using relationships in order to specify the chronological order of WBS elements. Determine whether this statement is true or false. True. False.

Which functions for time scheduling with WBS elements can be carried out automatically by the system on saving with the help of planning methods?.

Which factors can have an influence on the scheduling result of networks? Choose the correct answer(s). A The transaction used to carry out the scheduling. B Relationships to other networks. C The control key for the activity. D Dates of assigned WBS elements. E The work center in activities.

The system automatically calculates the actual dates for a WBS element from the accounting documents assigned to the WBS element. Determine whether this statement is true or false. True. False.

The Shift order indicator controls how actual dates from final confirmations affect further scheduling runs. Determine whether this statement is true or false. True. False.

In the Project System, only personnel resources represent capacities. Determine whether this statement is true or false. True. False.

Which of the following prerequisites need to be met to analyze the capacity requirements of an activity? Choose the correct answer(s). 4. A An execution factor must be stored for the activity. B Scheduling must have been carried out. C A distribution key must be maintained in the work center. D The activity must have a suitable control key. E A work center must be maintained in the activity. F The Capacity requirements indicator must be set in the network header.

In the capacity reports for the Structures Information System, all requirements are displayed for the resources selected.Determine whether this statement is true or false. True. False.

If you want to distribute work to persons in a project organization for a certain project, you need to assign this project organization for all WBS elements of the project. True. False.

Which options are available for confirmations of network activities in the Project System? Choose the correct answer(s). A Collective confirmations. B Confirmations via Internet. C Milestone confirmations. D Use of external systems via the PDC interface. E Individual confirmations from the Project Builder. F Time sheet (CATS).

The system always generates a purchase order automatically when releasing an externally processed activity. Determine whether this statement is true or false. True. False.

For the combination of plant and network type, you can specify in Customizing whether a workflow is to be generated for purchase-order relevant changes in a network plan or not. Determine whether this statement is true or false. True. False.

When using service activities in networks, you can enter goods receipts both for planned and for unplanned services. Determine whether this statement is true or false. True. False.

Which of the following statements are correct for the assignment of material components to network activities?Choose the correct answer(s). 4. A When the material is assigned, the item type is automatically derived from the material master data. B The material can already be maintained in standard networks. C If the BOM transfer is used, the material assignment in projects is automatically updated for each retrospective BOM change. D The requirement date for material components can be derived from the activity date. E Material assignments can be maintained in tables. F Components that you want to assign as stock items must have a material master record.

For the direct procurement of non-stock items, you must use the valuated project stock. Determine whether this statement is true or false. True. False.

When stock items are procured via requirements planning, the components are always produced in-house. Determine whether this statement is true or false. True. False.

Which of the following statements concerning requirements grouping are correct? Choose the correct answer(s). 3. A Requirements for multiple projects can be combined if certain prerequisites are fulfilled. B You can group together requirements for various WBS elements depending on the MRP group. C In the requirements grouping, network headers can also display individual stock elements from the MRP perspective. D Requirements groupings can be used for both evaluated and unevaluated project stocks. E Grouping together of requirements need not necessarily be carried out on the top WBS element.

You have to manually trigger the availability check for material in projects.Determine whether this statement is true or false. True. False.

You can use the function "delivery from projects" to delivery the material from the plant stock, the customer stock and the project stock. True. False.

Dates that you wish to analyze in Progress Tracking have to be manually entered into the various events beforehand.Determine whether this statement is true or false. True. False.

Which of the following statements concerning ProMan are correct? Choose the correct answer(s). A In ProMan, you can also analyze purchase orders that have been manually account-assigned to a WBS element. B In ProMan, you can post goods receipts and goods issues among other things. C You can define user-specific layouts for the overviews in ProMan. D To use ProMan, you must have defined the corresponding profiles in Customizing. E In the Customizing profile for ProMan, you can specify which exceptions are displayed, which orders and documents are read and which views are displayed. F In ProMan, you cannot only analyze data from the Project System but also data from Materials Management, Purchasing, and Production.