Cuestiones
ayuda
option
Mi Daypo

TEST BORRADO, QUIZÁS LE INTERESESAP S/4HANA Production Planning and Manufacturing

COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del test:
SAP S/4HANA Production Planning and Manufacturing

Descripción:
SAP S/4HANA Production Planning and Manufacturing - Mini

Autor:
LUIS ESCOBAR
(Otros tests del mismo autor)

Fecha de Creación:
27/07/2020

Categoría:
Informática

Número preguntas: 30
Comparte el test:
Facebook
Twitter
Whatsapp
Comparte el test:
Facebook
Twitter
Whatsapp
Últimos Comentarios
No hay ningún comentario sobre este test.
Temario:
Which technological advances enabled the development of SAP S/4HANA as the digital core? There are 3 correct answers to this question. Big and affordable memory Multi core processors enabling parallelism of tasks Wide adoption of web standards such as Service oriented architecture Advances in the three-tier architecture approach Capability to add to server landscape and scale.
You are creating a production order manually. What activities are involved in this process? There are 3 correct answers to this question. Order type determination Master data selection Actual cost calculation Planning selection Capacity requirements determination.
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material? Please choose the correct answer. Make-to-order production (20) Planning at assembly level (70) Planning with final assembly (40) Planning without final assembly (50).
What is the purpose of a reporting point confirmation in repetitive manufacturing? There are 2 correct answers to this question. To provide timely updates of inventory management for the staged components To determine the work in progress along the production line To reduce the total production lead time for along production line To stage different components for a production line simultaneously.
What are the main processes of the embedded PP/OS in SAP S/4HANA? There are 2 correct answers to this question Calculation of inventory buffer size Source determination for external procurement Optimization of the production plan Long-term production planning.
Which of these are layers in SAP Best Practice content? There are 3 correct answers to this question. Solution packages Configuration guides Building blocks Scope items Process diagrams.
Where can you maintain consumption mode and consumption periods for planning strategies? There are 2 correct answers to this question. In the plant parameters In the material master In the MRP group n the requirements class.
When would you use reporting point backflush in repetitive manufacturing? There are 2 correct answers to this question. You require an up-to-date inventory for components When you need to determine the work in progress When goods issues can wait for final confirmation For production lines with short lead times.
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question. Only the OLAP system has a predefined subset of the data Batch process are required to keep OLTP and OLAP in sync The OLAP system needs to write back the data to the OLTP system Only the OLAP system has the latest data Multiple copies of the data exist.
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past? Please choose the correct answer. Kanban Production order release Material requirements planning Backflushing.
For a production version to be valid and consistent what requirements must be fulfilled? There are 3 correct answers to this question. The lot size range must be within the lot-size range of the assigned routing. The assigned routing must be a rate routing. The assigned routing and bill of materials (BOM) must be valid in the entire validity period. The deletion flag must NOT be set for the bill of materials (BOM) or the routing. The assigned routing must NOT have alternative sequences.
Which of the following are included as SAP S/4HANA Sales Simplifications? There are 3 correct answers to this question. SAP Revenue Accounting replaces ERP SD Revenue Recognition SAP Sales Support replaces SAP CRM Settlement Management replaces ERP SD Rebates SAP GTS replaces ERP SD Foreign Trade SAP order Fulfillment replaces ERP SD Availability Checking.
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Please choose the correct answer. MRP Group –> Material Master –> Plant Settings Material Master –> Plant Settings –> MRP Group Plant Settings –> MRP Group –> Material Master Material Master –> MRP Group –> Plant Settings.
Which characteristics should a material have for re-order point planning? There are 2 correct answers to this question. Demand remains relatively constant. Replenishment lead time is known and relatively constant. Material replenishment is managed by the vendor (VMI). Seasonal demand is relatively volatile.
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? There are 2 correct answers to this question. Assign planned orders manual lying the planning table. Run PP/DS heuristics for repetitive manufacturing. Run MRP with quota arrangement. Run MRP with automatic selection of production version.
When do you use variant bills of materials (BOMs)? Please choose the correct answer. When multiple mater also have similar BOMs When multiple mater also have the same BOM When a material has a configurable BOM When a material has multiple BOMs.
You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are needed? There are 2 correct answers to this question. Create and assign a setup matrix with setup transition time to the resource Create and assign setup group/setup keys in the production data structure. Create and assign a new graphical object for setup time in the planning board. Run setup minimization heuristics or optimizer.
When can the material availability check occur automatically in a production order? There are 2 correct answers to this question. At order settlement At order confirmation At order creation At order release.
Which materials have a negative quantity in a bill of materials or in a recipe? There are 3 correct answers to this question. Waste products Co-products Continuous flow materials By-products Bulk materials.
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? There are 2 correct answers to this question. The number of leading zeros for internal numbers is client-specific. The display template for material numbers applies to all clients. In Customizing you can decide by material type whether to use the long material number. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question. Available-to-promise Supply Network Planning Backorder processing Demand planning Capacity planning.
Which document is skipped when SAP EWM is embedded in SAP S/4HANA? Please choose the correct answer. Outbound delivery order Outbound delivery request Warehouse order Warehouse task.
Before a user can add multiple production versions in a material master, what information should be collected? There are 3 correct answers to this question. Lot sizes Validity dates Task list group number Work center hierarchy BOM status.
In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Please choose the correct answer. Repetitive manufacturing profile Production version Cost collector Bill of material.
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging? It links receipts from an alternative location in case of a shortage in the default location It enables the propagation of network alerts across the bill of materials structure It replaces fixed pegging relationships unless they have been created for stock It propagates changed sales order priorities to the pegged planned orders.
At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated? Please choose the correct answer. The requirements date occurs that of a firmed planned receipt The requirements date occurs before that of a firmed planned receipt The requirement no longer exists A firmed planned receipt cannot be rescheduled.
You want to schedule an order in the graphical planning board. What are valid planning directions? There are 2 correct answers to this question. Infinite sequencing Squeezing in Forward with reverse Backwards.
What Kanban status automatically posts goods receipt with reference to the procurement element? Please choose the correct answer. Full Wait Empty In use.
Where can you find the latest in version of the Simplification List for SAP S/4HANA? Please choose the correct answer. SAP Solution Manager 7.2 SAP Help Portal SAP Best Practices Explorer SAP Support Portal.
What does a line hierarchy in repetitive manufacturing represent? Please choose the correct answer. A production line with more than one work center A production line with an alternative sequence in the routing A production line with a parallel sequence in the routing A production line with prioritized alternative work centers.
Denunciar test Consentimiento Condiciones de uso