option
Cuestiones
ayuda
daypo
buscar.php
TEST BORRADO, QUIZÁS LE INTERESE: SAP PP 1
COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del Test:
SAP PP 1

Descripción:
Primeras 25 preguntas

Autor:
Bárbara M
OTROS TESTS DEL AUTOR

Fecha de Creación:
08/01/2024

Categoría: Otros

Número Preguntas: 25
COMPARTE EL TEST
COMENTARNuevo Comentario
No hay ningún comentario sobre este test.
Temario:
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors? (2 Correct) They can be applied to make-to-stock production order. They can be used for repetitive manufacturing. They can be used for manufacturing with collective orders. They can be created automatically during month end process.
A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)? Change the phantom item indicator for the phantom assembly in the BOM. Change the item category of the phantom assembly in the BOM. Change the special procurement key of the phantom assembly in the BOM. Change the explosion type of the phantom assembly in the BOM.
A material in your company is planned with planning strategy 70 (Planning at assembly level). The consumption mode has been set to backwards with a consumption period of 12 days. Starting from when are the 12 days counted backwards? From the planned independent requirement date of the material From the availability date of the related finished good From the dependent requirement date of the material From the requested delivery date of the related finished good.
A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake. What impact would this have to other users for this specific production order? The production manager can still see the capacity requirements The production operator cannot enter additional confirmations The buyer can still see component reservations The warehouse clerk still carry out goods issue transactions.
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts? Infinite resource and infinite strategy Finite resource and infinite strategy Finite resource and finite strategy Infinite resource and finite strategy.
A production order is created from a planned order. The system should determine a valid production version. What must you doing the system for the selection to occur? Set the customizing setting Manual Selection of Production Version active. Create several production versions with valid dates. Set the customizing setting Automatic Selection of Production Version active. Change the production version assignment in the production order using the Read Master Data function.
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? (2 Correct) Operation control key Production scheduling profile Scheduling margin key Confirmation profile.
Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are available? (2 Correct) Order list Resource overview Resource utilization Production list.
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag? (2 Correct) Production version Material Work center Plant.
An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master. What determines whether the storage location can be derived from the production version? MRP Controller MRP Group Plant Data MRP Profile.
At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated? A firmed planned receipt cannot be rescheduled The requirement no longer exists The requirements date occurs before that of a firmed planned receipt The requirements date occurs that of a firmed planned receipt.
Before a user can add multiple production versions in a material master, what information should be collected? (3 Correct) Work center hierarchy BOM status Lot sizes Task list group number Validity dates.
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? (3 Correct) Use multilevel MRP run for the products on the resource Use optimization with respect to set-up times Use DS heuristic “Schedule Sequence” Use a bucket-oriented capacity check Use rescheduling with an alternative mode.
During production order creation, several valid production versions are found. How does the system choose the product conversion? Validity period or sales order Planned order or material number Lot size or material cost Alphanumeric or quota arrangement.
For a production version to be valid and consistent what requirements must be fulfilled? (3 Correct) The assigned routing and bill of materials (BOM) must be valid in the entire validity period. The assigned routing must NOT have alternative sequences. The deletion flag must NOT be set for the bill of materials (BOM) or the routing. The lot size range must be within the lot-size range of the assigned routing. The assigned routing must be a rate routing.
For what production type are production orders used? Replenishment controlled by control cycles Process manufacturing processes Discrete manufacturing processes Period and quantity-oriented production.
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning? (2 Correct) Material master Contract Work center Production plant.
For which planning-relevant data objects do you set just one indicator to include then in PP/DS? (2 Correct) Production version Material Plant Work center.
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality? By providing future demands from demand figures in the past By providing cross-plant planning and deployment By providing multilevel material requirements planning By providing replenishment proposals with exact times.
How can SAP S/4HANA support a GMP compliant production process? (3 Correct) Use of the digital signature function to check and run business processes Predefined GMP compliant process order types to meet audit requirements Recipe approval with Engineering Change Management Use of the GMP compliant flag in relevant master data applications Documentation of quality data with Quality Management.
How can you achieve a feasible production plan in case of capacity constraints? (3 Correct) Reduce the planning window. Adjust the available capacity. Form optimum sequences to reduce setup times. Execute a new production planning run. Select an alternative mode on a resource.
How can you avoid order proposals for planned independent requirements with dates in the past? (2 Correct) Use a planning strategy with requirements consumption Reorganize planned independent requirements Set the requirements reduction indicator in the requirements class Maintain adjustment parameter in the MRP group.
How can you carry out cost object controlling for production orders? (2 Correct) Cost-related Order-related Product-related Milestone-related.
How can you enhance the system statuses of a production order scenario with user statuses? By enhancing the system status customizing table with user statuses By activating the user statuses in status and action management By creating a user profile and assigning it to the production scheduling profile By defining a status profile and assigning it to the order type.
How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products? By assigning the same production version to different materials By creating routings with parallel sequences By assigning different materials to the same routing By creating routings with alternative sequences.
Denunciar Test