Temario:
What are the options for transferring data to SAP S/4HANA with the SAP S/4HANA Migration Cockpit? (2 Correct) Staging tables XML files Temporary tables CSV files.
What are the possible categories for the Business Partner master data object in SAP S/4HANA? (3 Correct) Group Vendor Person Organization Customer.
What are the possible results of a production planning run in Advanced Planning (PP/OS)? (3 Correct) Planned order Purchase requisition Scheduling agreement schedule line Stock transport order Production order.
What are the three transition scenarios for an S/4HANA implementation? (3 Correct) System activation System conversion System upgrade Landscape transformation New implementation.
What capabilities does SAP S/4HANA embedded analytics provide? (2 Correct) Comparison of current data with historical data to identify trends Real time decision support Automatic update of story boards Strategic analysis.
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? (2 Correct) The planning strategy is infinite. The Change Planning Direct on indicator is set. The work center has several individual capacities. Alternative resources are fully occupied.
What data can you maintain in the sub items of a bill of material (BOM)? (2 Correct) Quantity Item type Installation point Scrap percentage.
What data processing steps are obsolete if you use SAP S/4HANA Analytics? (2 Correct) Online analytical processing (OLAP) Pre computed aggregation views Online transaction processing (OLTP) Extract on, transformation, and loading (ETL).
What determines whether the planned independent requirements in MRP consume other requirements? Order type Consumption sequence procedure Requirements type Requirements profile.
What do you use to schedule operations from planned orders so that the production plan can be fulfilled? Supply Network Planning (SNP) Demand Planning (DP) Capacity Requirements Planning (CRP) Material Requirements Planning (MRP).
What does a line hierarchy in repetitive manufacturing represent? A production line with an alternative sequence in the routing A production line with a parallel sequence in the routing A production line with more than one work center A production line with prioritized alternative work centers.
What does forecasting in the demand planning cycle include? (3 Correct) Market intelligence One-off events Past procurement quantities Past quotation quantities Past sales order quantities.
What does it mean for the production planner when MRP works with infinite capacities? MRP assigns capacity requirements automatically to work center is with the earliest available capacity. MRP creates capacity requirements only if the work center has sufficient capacity. MRP creates capacity requirements without checking the capacity of a work center. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
What does the bill of material usage (BOM usage) control at the BOM item level? (2 Correct) Default values for the item status Default unit of measure Maximum allowed low-level code Allowed material type.
What does the industry sector determine? (2 Correct) Whether material numbers are assigned internally or externally Which transaction you can use to create a new material Whether a material master field is required, changeable, displayed, or hidden Which material master views can be maintained.
What generates capacity requirements in a process order? Activities Phases Operations Resources.
What information is included in the SAP Readiness Check result for SAP S/4HANA? (3 Correct) Recommended SAP Fiori apps Relevant simplification items Recommended SAP Best Practices Custom code analysis Inconsistent data tables.
What is a typical transportation processing SAP Transportation Management? Transportation Planning, Order Management, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting Transportation Planning, Transportation Execution, Order Management, Freight Costing and Settlement, Analytics and Reporting Order Management, Transportation Planning, Freight Costing and Settlement, Transportation Execution, Analytics and Reporting Order Management, Transportation Planning, Transportation Execution, Freight Costing and Settlement, Analytics and Reporting.
What is a work center hierarchy in SAP S/4HANA capacity planning? A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel A group of alternative work centers for production, structured in hierarchy levels by prior ties A group of alternative work centers providing a cumulative available capacity for production A group of work centers in a production line being used in sequence for production.
What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing? PP Standard Sales and Operations Planning APO Demand Planning Integrated Business Planning Flexible Planning.
What is the difference between co-products and by-products? Only co-products appear in the process or production order settlement rule. Only co-products are identified by a special item category in the bill of material (BOM). Only by-products have a zero inventory valuation. Only co-products can be manufactured in isolation from the main product.
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? (3 Correct) Bill of Material Routing Production Version Engineering Change Record.
What is the first step in the MRP run? BOM explosion Source determination Lot size calculation Net requirements calculation.
What is the purpose of a reporting point confirmation in repetitive manufacturing? (2 Correct) To reduce the total production lead time for along production line To provide timely updates of inventory management for the staged components To stage different components for a production line simultaneously To determine the work in progress along the production line.
What is the purpose of collective orders? To post any component withdrawals single back flush with order confirmation To combine order management of co-products and by-products with the main product To postproduction costs on a cost collector instead of the production order To manage production orders for an entire finished product on multiple levels.