option
Cuestiones
ayuda
daypo
buscar.php
TEST BORRADO, QUIZÁS LE INTERESE: SAP S/4HANA Manufacturing
COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del Test:
SAP S/4HANA Manufacturing

Descripción:
Certification exam SAP C_TS422_1909

Autor:
elgrunchi
OTROS TESTS DEL AUTOR

Fecha de Creación:
30/09/2021

Categoría: Otros

Número Preguntas: 101
COMPARTE EL TEST
COMENTARNuevo Comentario
No hay ningún comentario sobre este test.
Temario:
1) A customer is considering switching from order-related settlement to product related settlement. What are capabilities of cost collectors? There are 2 correct answers to this question. They can be used for repetitive manufacturing They can be applied to make-to-stock production order They can be created automatically during month end process They can be used for manufacturing with collective orders.
2) The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question. Manually firm all planned orders for materials within the replenishment lead time of the material In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material.
3) Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component availability. Which information is required to implement this change request in the scope of check? There are 2 correct answers to this question. The checking control for the order type The checking group from the material master The ATP category for restricted-use stock The checking rule from the business application.
4) You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use? 20 – Make to order production 50 – Planning without-final-assembly 40 – Planning with-final-assembly 10 – Anonymous make-to-stock.
5) In Make-to-order production, which field controls whether the components will be planned as sales order specific stock? The MRP Type of the component The item category of the component in the BOM The Individual/Collective indicator of the component The Planning Strategy of the finished product.
6) A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question. Confirmation profile Scheduling margin key Operation control key Production scheduling profile.
7) Your customer complains about the incorrect duration for production order operations. What time elements could cause the issue? There are 3 correct answers to this question. Floating time Move time Processing time Queue time.
8) What are the attributes of the SAP S/4HANA Simplification list? There are 3 correct answers to this question. It details transaction and solution capabilities at a functional level It contains references to the relevant training material It is only a grouping of related technical simplifications It can have a business and a technical impact It was created for better planning and estimation of your way to S/4HANA.
9) What are prerequisites for using batch derivation? There are 2 correct answers to this question. Receiver-sender relationships Batch determination selection conditions Batch where-used list Process instructions.
10) Which SAP solutions are part of the Digital Value Network portfolio? There are 3 correct answers to this question. SAP Fieldglass SAP Hybris SAP Visual Enterprise SAP Human Capital Management Concur.
11) Which warehouse management functions are available in SAP EWM but NOT in SAP WM? There are 3 correct answers to this question. Handling Unit Management Yard Management Expected goods receipt Labor Management Slotting.
12) For which planning-relevant data objects do you set just one indicator to include then in PP/DS? There are 2 correct answers to this question. Work center Material Plant Production version.
13) Which process order function uses resource network? Please choose the correct answer. Capacity planning Resource scheduling Resource Selection Capacity levelling.
14) What are the Pillars of SAP Activate? There are 2 correct answers. SAP Max Attention Premium engagement Guided Configuration SAP Best Practices.
15) What are the drawbacks of separation of the OLTP and OLAP? (3 correct answers) Multiple copies of the data exist. The OLAP system needs to write back the data to the OLTP system. Only OLAP system has the latest data. Batch process are required to keep OLTP and OLAP in sync. Only the OLAP system has a predefined subset of the data.
16) Which of these are layers in SAP Best Practice content? There are 3 correct answers to this question. Configuration guides Building blocks Process diagrams Solution packages Scope items.
17) You are using the document management system (DMS). Where should the DMS document links be assigned, to have them automatically copied to production orders? There are 2 correct answers to this question. Material master Bill of material Routing header Work center.
18) What Kanban status automatically posts goods receipt with reference to the procurement element? Full Empty In use Wait.
19) What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing? PP Standard Sales and Operations Planning Flexible Planning APO Demand Planning Integrated Business Planning.
20) The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment? There are 2 correct answers to this question. Stock transfer In-house production Subcontracting Vendor consignment.
21) Which of the following functions can be performed when the production order has the status “Created” (CRTD)? A user trigger material availability check via mass processing (transaction COHV). A user trigger printing of shop floor paper manually (transaction CO02). A user can schedule a background job to release production orders (transaction COOIS). A user can trigger material staging via mass processing (transaction COHV).
22) You are using heuristic SAP_MRP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created? Vendor rating Quota arrangement Delivery date Component availability Costs.
23) In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate? The presence of production orders The presence of firmed planned orders The viability of the proposed solution The priority of the proposed solution.
24) When do you recommend the use of repetitive manufacturing? There are 2 correct answers to this question. High product complexity Low product stability Low product complexity High product stability.
25) Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics? There are 3 correct answers to this question. Forecast Drilldown Sort Scheduling Filters.
26) A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system. Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts? Finite resource and finite strategy Infinite resource and infinite strategy Infinite resource and finite strategy Finite resource and infinite strategy.
27) When the goods receipt for a finished product is posted during confirmation in a repetitive manufacturing environment, which of the following actions are also performed by default? There are 2 correct answers to this question. Archiving of backflush documents Posting of production costs to cost collector Staging of components for the next order in the sequence Reduction of the capacity requirements.
28) A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named “W1904_1000_001”. What does the suffix 001 in the resource name represent? Work center category Available capacity version Capacity category Number of individual capacities.
29) For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning? There are 2 correct answers to this question. Material master Work center Production plant Contract.
30) What are main innovations in manufacturing in SAP S/4HANA? There are 3 correct answers to this question. Material Coverage Fiori app Flow manufacturing Monitor Production Orders Fiori app Lock-free inventory movements Rough-cut capacity planning.
31) Where can you maintain consumption mode and consumption periods for planning strategies? There are 2 correct answers to this question. In the requirements class In the plant parameters In the MRP group In the material master.
32) Which of the following is used by the MRP Live planning run in SAP S/4HANA? Planning horizon Parallel processing across servers Net change planning MRP list.
33) Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP? There are 2 correct answers to this question. Setup time Float before and float after production Opening period Goods receipt processing time.
34) What are the three transition scenarios for an S/4HANA implementation? There are 3 correct answers to this question. Landscape transformation System activation System conversion New implementation System upgrade.
35) What new technology is used in SAP S/4HANA Embedded Analytics? ABAP Managed Core Data Services (CDS) Smart Business Cockpit HANA Live Multidimensional Reporting client (MDRC).
36) What are some of the SAP Fiori user types? There are 3 correct answers to this question. Employee Business partner Administrator (Expert) End user (Occasional) Developer.
37) Which of the following is an advantage of MRP Live and NOT available in classical MRP? MRP Live can create production orders automatically MRP Live can plan materials with recursive BOMs MRP Live can propose alternative solutions MRP Live can priorities demand from sales orders.
38) What is the correct sequence of the following Activate methodology phases? Prepare, Validate, Test, Go-Live Prepare, Realize, Iterate, Continuous Improvement Validate, Realize, Test, Deploy Prepare, Explore, Realize, Deploy.
39) Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question. SAP S/4HANA on premise SAP S/4HANA Professional services cloud SAP S/4HANA private cloud SAP S/4AHANA Enterprise Management cloud.
40) Which document is skipped when SAP EWM is embedded in SAP S/4HANA? Outbound delivery order Outbound delivery request Warehouse order Warehouse task.
41) What steps are possible in a PP/DS production planning run? There are 3 correct answers to this question. Backorder processing Heuristics Demand consumption Detailed scheduling functions Optimization.
42) You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order. Which is the appropriate planning strategy to use? 50 Planning without final assembly 40 Planning with final assembly 20 Make to order production 30 Production by lot size.
43) Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question. Backorder processing Supply Network Planning Capacity planning Available-to-promise Demand planning.
44) In which, material master views can you select the batch management checkbox? There are 2 correct answers to this question. MRP 4 Purchasing Work Scheduling Basic Data 1.
45) Which data model changes have been implemented in Sales and Distribution? There are 3 correct answers to this question. Elimination of output condition tables Elimination of document index tables Elimination of status tables Elimination of customer master tables Elimination of LIS tables for rebates.
46) Which task list types can have parallel sequences? There are 2 correct answers to this Routings (N) Rate routings (R) Master recipes (2) Reference operation sets (S).
47) How does the new Inventory Management Data model contribute to the reduction of the data footprint? There are 3 correct answers to this question. By eliminating hybrid tables By eliminating inventory tables By eliminating material master tables By eliminating fields for different stock types By eliminating inventory history tables.
48) What are properties of MRP Live? There are 2 correct answers to this question. It uses the same BAdis as classic MRP It is executed on the database server The code is written in SQL Script Data is read sequentially from the database tables.
49) Which of the following are included as SAP S/4HANA Sales Simplifications? There are 3 correct answers to this question. SAP GTS replaces ERP SD Foreign Trade SAP Revenue Accounting replaces ERP SD Revenue Recognition SAP Sales Support replaces SAP CRM Settlement Management replaces ERP SD Rebates SAP order Fulfillment replaces ERP SD Availability Checking.
50) Which automotive-specific functionality is embedded in SAP S/4HANA? There are 3 correct answers to this question. Equipment and Tools Management Enhanced characteristics based processes Parts interchangeability Enhanced Kanban Processing Packaging Logistics.
51) You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal? Top of Green Top of Red Top of Yellow Top of Red Base.
52) A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake. What impact would this have to other users for this specific production order? The production operator cannot enter additional confirmations The warehouse clerk still carry out goods issue transactions The buyer can still see component reservations The production manager can still see the capacity requirements.
53) In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question. Routing, in the component allocation. BOM, in the item for the material Work center, in the production supply area Material master of the finished product.
54) Which of the following elements does the MRP run take into account? There are 2 correct answers to this question. Planned independent requirements Sales orders Shipments Material documents.
55) The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA? Please choose the correct answer. Production Version Contract Selection Method Purchasing Info Record.
56) How can you limit the number of master data objects to be created when the manufacturing process is the same for many different products? By assigning the same production version to different materials By creating routings with alternative sequences By creating routings with parallel sequences By assigning different materials to the same routing.
57) The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings? Plant Settings -> MRP Group -> Material Master MRP Group -> Material Master -> Plant Settings Material Master -> Plant Settings -> MRP Group Material Master -> MRP Group -> Plant Settings.
58) What is the valid sequence of key activities in production order processing? Creation, staging, release, material withdrawal, confirmation. Creation, scheduling, release, variance calculation, confirmation. Creation, release, scheduling, material withdrawal, confirmation. Creation, scheduling, release, material withdrawal, confirmation.
59) In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy? Individual/Collective Indicator Dependent Requirements indicator Mixed MRP indicator Storage Location MRP Indicator.
60) What does the bill of material usage (BOM usage) control at the BOM item level? There are 2 correct answers to this question. Allowed material type Maximum allowed low-level code Default unit of measure Default values for the item status.
61) When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling. Which planning procedure do you use to create a feasible production plan from a requirements planning perspective? Total planning online Multi-level single-item planning with the "display material list" option Interactive single-item planning for the delayed assembly Multi-level single-item planning with the "simulation mode" option.
62) The availability check during production order creation should use a different scope of check than during order release. How can you fulfill this requirement? Maintain appropriate checking rules in checking control for order creation and order release. Maintain appropriate availability checking rules in the order type-dependent parameters. Maintain an appropriate availability checking group in the material master. Maintain appropriate availability checking rules in the production scheduling profile.
63) You have maintained planning strategy group 10 (make-to-stock production) in the material master of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan. Which of the following scenarios are applicable in this case? (Choose two) You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.
64) When modelling in-house production on which business levels can you create a bill of material (BOM)? (Choose two) At the company code level At the plant level At the business area level At the client level.
65) You select the master data for production orders via production versions. Which information is contained in a production version? The explosion dates for the routing and BOM The routing and BOM alternatives to be used The default order type to be used The control parameters for selecting routings and BOM.
66) In which of the following objects can you activate back flushing for production orders? (Choose three) Work center Routing Material master (finished product) Material master (component) Production scheduling profile.
67) Which property applies for consumption with planning strategy 40 (planning with final assembly)? Consumption creates a static and binding assignment between the planned independent requirements and the customer requirements for the entire procurement process. Consumption takes place with the planning material. Consumption can reduce the total originally planned production quantity. Consumption can increase the total originally planned production quantity.
68) Which Kanban master data object controls the relationship between the supply and demand source? Kanban container Control cycle Production supply area Rate routing.
69) The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock requirements list. Which of the following will firm planned orders” There are 2 correct answers to this question? Creating a planned order within the planning time fence Assigning a production scheduling profile Setting a planning time fence in the Material Master Record Manually changing the quantity of a planned order.
70) How can you avoid order proposals for planned independent requirements with dates in the past? There are 2 correct answers to this question. Use a planning strategy with requirements consumption Maintain adjustment parameter in the MRP group Reorganize planned independent requirements Set the requirements reduction indicator in the requirements class.
71) What are some of the advantages of using Kanban? There are 2 correct answers to this question. Replenishments are created close to the actual need Replenishments are based on centralized planning It is a simplified form of production control It is mostly accomplished by manual postings.
72) Which capabilities does the Alert Monitor have? There are 3 correct answers to this question. Automatically predict alerts in future planning cycles Automatically send alerts with Alert Notification Engine Nominate time-dependent substitutes for a planner Automatically reschedule in case of overload alerts Generate alerts based on defined threshold values.
73) At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be generated? A firmed planned receipt cannot be rescheduled The requirements date occurs that of a firmed planned receipt The requirement no longer exists The requirements date occurs before that of a firmed planned receipt.
74) Which transaction code can you use in SAP S/4HANA to enter and display goods movements? MIGO MBNL MB02 MMBE.
75) When would you use reporting point backflush in repetitive manufacturing? There are 2 correct answers to this question. You require an up-to-date inventory for components For production lines with short lead times When you need to determine the work in progress When goods issues can wait for final confirmation.
76) What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question. Automatic update of story boards Comparison of current data with historical data to identify trends Strategic analysis Real time decision support.
77) Which data object can be updated with the scheduling results of a routing? Please choose the correct answer. Material master MRP profile Production scheduling profile Production version.
78) To ensure that the warehouse operator only stages large components in the exact required quality for each production order, which warehouse material staging method would you recommend? Please choose the correct answer. Pick parts Create parts Release order parts Kanban.
79) During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question. Use multilevel MRP run for the products on the resource Use a bucket-oriented capacity check Use rescheduling with an alternative mode Use DS heuristic "Schedule Sequence" Use optimization with respect to set-up times.
80) In which customizing activity do you set up automatic routing selection for production orders? Please choose the correct answer. Define order-type-dependent parameter Define scheduling parameters for production orders Define production scheduling profile Define selection profiles.
81) How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality? Please choose the correct answer. By providing replenishment proposals with exact times By providing cross-plant planning and deployment By providing future demands from demand figures in the past By providing multilevel material requirements planning.
82) In a first step you have created master recipes. In which sequence are the additional objects created? Please choose the correct answer. Process order Control recipe Process message PI sheet Process order Control recipe PI sheet Process message Process message Control recipe Process order Process message PI sheet Control recipe Process order PI sheet Process message.
83) Which material-specific information can be transferred to a transportation lane in PP/DS? There are 3 correct answers to this question. Production versions Outline agreement Special procurement keys Quota arrangements Purchasing info records.
84) Which elements are included in the structure of the batch where-used list? There are 3 correct answers to this question. Purchase orders Collective orders Transfers from batch to batch Stock transfers Planned orders.
85) The pegging situation was changed of an MRP heuristic run. What is a capability of dynamic pegging? It replaces fixed pegging relationships unless they have been created for stock. It links receipts from an alternative location in case of a shortage in the default location. It enables the propagation of network alerts across the bill of materials structure. It propagates changed sales order priorities to the pegged planned orders.
86) Which of the following data objects are update when a user confirms an operation? Production order header status Warehouse transfer order status Shop floor information system Production order total order quantity.
87) In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Bill of material Production version Cost collector Repetitive manufacturing profile.
88) What is the first step in the MRP run? Please choose the correct answer. Lot size calculation BOM explosion Source determination Net requirements calculation.
89) Which functional capabilities does the Detailed Scheduling Board have? There are 2 correct answers to this question Change sales order quantities Enter time-ticket confirmation for production orders Change planned order quantities Undo for drag & Drop planning activities.
90) What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? There are 3 correct answers to this question. Bill of Material Routing Engineering Change Record Production Version.
91) Which of the following apply to MRP Live? There are 2 correct answers to this question. The sequence of planning materials is calculated across plants. The BAdIs for classical MRP also applies to MRP Live. The definition of the planning scope is more flexible. Planned orders need to be converted to purchase requisitions for externally procured materials.
92) Which of the following objects can you release so that the business transactions for process order execution and process management can be executed? There are 2 correct answers to this question. Individual operations Individual process instructions Individual phases Individual control recipes.
93) How is the bill of material (BOM) exploded when you use a BOM explosion number? Please choose the correct answer. With respect to defined separate key dates for product and each assembly With respect to a common key date for the product and each assembly With respect to defined separate change status for the product and each assembly With respect to common change status for the product and each assembly.
94) How can you enhance the system statuses of a production order scenario with user statuses? Please choose the correct answer. By creating a user profile and assigning it to the production scheduling profile By defining a status profile and assigning it to the order type By enhancing the system status customizing table with user statuses By activating the user statuses in status and action management.
95) Which reports can you access via the order and resource reporting transaction in advanced planning? There are 3 correct answers to this question. Operation list Production list WIP list Planning file entries Production overview.
96) The setup time on the production line to produce material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this? Please choose the correct answer. Periodic lot sizing Exact lot sizing Fixed lot sizing Minimum lot sizing.
97) Which technological advances enabled the development of SAP S/4HANA as the digital core? There are 3 correct answers to this question. Advances in the three-tier architecture approach Big and affordable memory Capability to add to server landscape and scale Wide adoption of web standards such as Service-oriented architecture Multi-core processors enabling parallelism of tasks.
98) Before a user can add multiple production versions in a material master, what information should be collected? There are 3 correct answers to this question. BOM status Validity dates Work center hierarchy Task list group number Lot sizes.
99) What must be used in the system to plan the requirements for different subcontractors separately? MRP areas Storage locations Production versions Planning plant.
100) On which of the following levels can you influence the availability check for the components of production orders? There are 2 correct answers to this question. Material master Production order type Production controller MRP controller.
101) Which material master setting is required to use the repetitive planning table for production with production orders? Please choose the correct answer. An overall profile be assigned on the Work Scheduling view At least one valid production version must exist on the MRP4 view A repetitive manufacturing profile must be assigned on the MRP4 view The Selection Method must be set to “2 Selection by production version”.
Denunciar Test