option
Cuestiones
ayuda
daypo
buscar.php

test_up

COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del Test:
test_up

Descripción:
test_up

Fecha de Creación: 2021/08/21

Categoría: Otros

Número Preguntas: 46

Valoración:(1)
COMPARTE EL TEST
Nuevo ComentarioNuevo Comentario
Comentarios
NO HAY REGISTROS
Temario:

What is the benefit of using the file UPGANA.XML from a previous SUM run? Please choose the correct answer. To make the progress information within SUM UI more accurate. To auto-fill specific fields on selected screens on the SUM UI. To skip selected phases during the SUM run. To repeat specific phases during the SUM run.

You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time? Please choose the correct answer. At the end of the downtime. As part of the cleanup process. Before the downtime starts. Early in the downtime.

You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities? There are 3 correct answers to this question. Response: Apply an Enhancement Package. Perform an SAP S/4HANA conversion including DMO. Apply SAP Support Packages. Upgrade the SAP system. Use DMO for SUM.

You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3 Ioad processes during Roadmap step "Extraction". Where can you change this during the migration via the Utilities option of the SUM UI? There are 2 correct answers to this question. In Process Control Center. In DMO Migration Preparation. In SUM Phase list. In SUM Parameters.

Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues? There are 2 correct answers to this question. Release the transport request containing the modification adjustment. Assign the transport request as a modification adjustment transport. Create "modified' versions of the objects that you need to adjust. Manually activate the adjusted dictionary objects.

What are the benefits of using the Benchmarking option of the DMO for SUM? There are 2 correct answers to this question. You can find the optimal number of parallel R3load processes by monitoring host performance. You can verify that the content of the download directory matches the stack.XML file. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run. You can record the modification adjustment during migration and use the transports in the next runs.

What do you need to know about the SAP ERP Upgrade and Update Guide? There are 2 correct answers to this question. It contains a section "free space requirements". It is target release specific. It is a database-specific document. It contains a troubleshooting section.

When using the DMO of SUM, which files can be handled by SUM in the download directory? There are 2 correct answers to this question. Parameter file SAPup_add.par. Stack XML file calculated by the Maintenance Planner. MIGRATE_DT_DUR_XML file from a previous run. Breakpoint configuration file SAPUPPHAS.BRK.

You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HANA You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion? There are 2 correct answers to this question. Kernel for target release, Linux, SAP HANA. Kernel for source release, Windows, SAP MaxDB. Kernel for target release, Windows, SAP MaxDB. Kernel for target release, Windows, SAP HANA.

The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error? There are 2 correct answers to this question. Check the system log (transaction SM21) of the SAP system. Check the most recent entries in SAPup.log. Check the most recent entries shown in file sapevt.trc. Check the messages shown by the SUM UI.

You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. The source system is non-Unicode and the target database is a scale-out system. What do you need to consider? There are 2 correct answers to this question. Network capacity between exporting and importing R3load processes must be considered. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31. The target database size increases temporarily because of the Shadow Repository. SAP HANA Landscape Reorganization requires a manual step to edit a file.

You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results? There are 2 correct answers to this question. SAT (Runtime Analysis). ATC (ABAP Test Cockpit). SE80 (Object Navigator). SYCM (Simplification Database Content).

You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion? Please choose the correct answer. Dedicated application tables are migrated in uptime. An additional temporary database is used during uptime. TABIM_UPG is executed in uptime. The repository is migrated in uptime.

During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison? Please choose the correct answer. It performs a comparison of all tables using check sum. It does NOT perform any table comparison. It performs a comparison on all tables using row counts. It performs a comparison on selected tables using check sum.

You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox? Please choose the correct answer. /ASU/START (Start ASU Toolbox). /ASU/SHOW_NOTE (Show SAP Note via Web-Browser). /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode). /ASU/SSM (ASU Simple Schedule Manager).

In which scenarios do you need to use SUM 2.0 instead of SUM 1.0? There are 2 correct answers to this question. Updating to SAP ECC 6.07 using DMO. Upgrading to SAP ECC 6.08 without using DMO. Using DMO when applying Support Packages to SAP ECC 6.07. SAP S/4HANA conversion to SAP S/4HANA 1709.

During a SUM run your vivant to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this? There are 2 correct answers to this question. Check for running R3trans processes on the host of the primary application server. Check for running batch jobs in the shadow system via Job Overview (SM37). Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp. Check for running R3load processes on the host of the primary application server.

You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HANA. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion? There are 2 correct answers to this question. Kernel for target release, Windows, SAP HANA. Kernel for target release, Windows, SAP MaxDB. Kernel for source release, Windows, SAP MaxDB. Kernel for target release, Linux, SAP HANA.

You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other nondictionary repository objects (SPAU)? Please choose the correct answer. Credentials of a named user in the development client of the development system. Credentials of user DDIC in the development client of the development system. Credentials of user DDIC in client 000 of the shadow system. Credentials of a named user in client 000 of the shadow system.

You want to execute a Unicode Conversion only. Which approach do you need to follow? Please choose the correct answer. SWPM using the Load procedure. SUM without DMO. SWPM using the Backup / Restore procedure. SUM with DMO.

You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel. Why are 40 Process Buckets executed in parallel? Please choose the correct answer. SUM is still running in uptime; the number of 40 defined R3load processes is considered. The number of CPU cores does not allow more than 40 R3load processes to be run in parallel. These are 40 pairs of R3load processes, so there are 80 R3load processes running. There is a maximum of 40 parallel R3load processes within this specific downtime phase.

You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to beperformed during the preparation phase? There are 2 correct answers to this question. Run the database migration to the SAP HANA database. Perform the migration of data into the new data structure. Check the compatibility of custom code with SAP S/4HANA. Apply the recommendations of the simplification list.

Which circumstances will allow SUM to run without the creation of a shadow system? Please choose the correct answer. Using the main configuration option "Single System" when installing an Add-On. Using the main configuration option "Single System" in case of an upgrade. Using the main configuration option "Standard" when applying SAP Support Packages. Using the database migration option (DMO) for SUM.

You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on. Following SAP recommendations, how will you achieve this? There are 2 correct answers to this question. Import a transport request from the development system that contains the recording of the activation. Activate the required business functions manually in the production system. During conversion, SUM delivers some business functions already activated. Specify the business functions that need to be switched on during the prepare part of SUM.

Which preparational steps must be performed for an SAP S/4HANA conversion? There are 2 correct answers to this question. Uninstall Fiori apps not released for SAP_UI 7.50. Install add-on SAP Gateway 7.50. Uninstall industry extensions not supported by SAP S/4HANA. Delete client 066 (Early Watch Client).

Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"? There are 2 correct answers to this question. Keep archiving on during the whole procedure. Choose the instance number of the shadow instance. Reuse a profile for the shadow instance from a previous run. Use the Near Zero Downtime Maintenance Technology (NZDM).

You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance? There are 2 correct answers to this question. Modification adjustment (SPDD). Activation of dictionary objects (ACT_UPG). Switch to new repository (EU_SWITCH). Conversion of application tables (PARCONV_UPG).

During a DMO procedure with SUM, after which phase is the repository first available on the target database? Please choose the correct answer. Downtime migration (EU_CLONE_MIG_DT_RUN). Parallel distribution (PARDIST_SHD). Uptime migration (EU_CLONE_MIG_UT_RUN). Shadow repository creation (EU_IMPORT*).

What phases of SUM will be executed during an SAP S/4HANA conversion including DMO? There are 3 correct answers to this question. Phase RUN_RSPTBFIL _ISUTABU. Phases EU_IMPORT*. Phase DOWNCONF_DTTRANS. Phases DIFF*. Phase RUN_RSDBSCPY.

What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question. \You need an SAP system based on AS ABAP 7.50 or above for the SI check framework. You need to build up a SI check framework by applying SAP notes. The SI checks are executed in the development system and the results are transported into the subsequent systems. Depending on the SAP S/4HANA version, there are different SI check frameworks.

You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration? There are 3 correct answers to this question. Activation of dictionary objects in phase ACT_UPG. Import of dictionary objects from the download directory in phase DDIC_UPG. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE. Generation of the new ABAP loads in phase RUN_SGEN_GENER8. Import of upgrade and language data from the download directory in phase TABIM UPG.

You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)? Please choose the correct answer. Credentials of a named user in client 000 of the shadow system. Credentials of a named user in the development client of the development system. Credentials of user DDIC in the development client of the development system. Credentials of user DDIC in client 000 of the shadow system.

Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question. Dual Stack split. Homogenous system copy. Support Package Stack update. Database migration. Release upgrade.

You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column. What does the "Calculated level" indicate for those software components? Please choose the correct answer. The SAP Support Packages found in the download directory. The SAP Support Packages contained in the upgrade media. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner. The SAP Support Packages that will be bound to the upgrade.

During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error? There are 2 correct answers to this question. In the corresponding R3trans log files of this phase. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log. In the job log for the corresponding job in SM37 (Job Overview).

What do you do to prepare the database migration option of a SUM procedure? There are 3 correct answers. Extract the SAP HANA database installation archive. Move the R3trans update archive into the download folder. Move the SAPM update archive into the download folder. Move the stack.xml update file into the download folder. Extract the SAP HANA client installation archive.

Which are valid options to check the progress of the database migration in a Microsoft Windows environment? There is correct answers to this question. A. Check the log files written under "SUM\abap\log". B. Check the dump size of the database export on disk. C. Check logs for jobs starting with "RSUPG_SGEN" in the system. D. Check the "Charts Control Center" in the SUM UI.

In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)? There are 2 correct answers to this question. During uptime. During SPDD. During downtime. Post-downtime.

You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRDsystem. What do you need to consider? Please choose the correct answer. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD. The upgrade of the PRD must be finished before you start new development in the DEV. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD. The transport between Unicode and non-Unicode systems is forbidden.

You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer. Configure it within transaction ATC. Apply the corresponding SAP note via SAP Note Assistant. Download it from SAP Support Portal. Generate it by analyzing the specific custom code via RFC.

During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure? There are 3 correct answers to this question. Execution of eCATTs for business validation tests. Execution of SPDD modification adjustment. Execution of XPRAs and AIMs. Execution of SPAU modification adjustment. Creation of the table structures in the new SAP HANA database.

You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system? Please choose the correct answer. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps. After the SUM roadmap step "Execution" is finished and before "Postprocessing". After the SUM roadmap step "Postprocessing" and post procedure steps are finished.

What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par? Please choose the correct answer. An upgrade of the software components is performed, without changing the database type. An SAP S/4HANA conversion is performed, without adapting the customer data. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion. A change of the database type is performed, without changing the software components.

How does SUM recognize modification adjustment transports from predecessor systems? Please choose the correct answer. By searching for transport requests named <SID>K0<number>. By searching for transport requests in DIR_TRANS, subdirectory "transport". By searching for transport requests in the file umodauto.Ist. By searching for transport requests that are assigned to the project SAP_ADJUST.

Which Guides contain information about SUM phases starting with "EU_CLONE_"? There are 2 correct answers to this question. The SAP S/HANA Conversion Guide. The Application Guide. The major SUM Guide. The DMO Guide.

You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade? Please choose the correct answer. Combine the upgrade and the Unicode conversion using the Twin Upgrade & Unicode Conversion (TU & UC) procedure. Combine the upgrade and the Unicode conversion using the Combined Upgrade & Unicode Conversion (CU & UC) procedure. Perform the Unicode conversion before the upgrade to SAP ECC 6.08. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.

Denunciar Test