Título del Test:
Consumption-Based Planning and Forecasting in SAP S/4HANA

Descripción:
libro 3

Autor:
AVATAR
JKP
OTROS TESTS DEL AUTOR

Fecha de Creación:
25/04/2023

Categoría: Otros

Número Preguntas: 21
COMPARTE EL TEST
COMENTARNuevo Comentario
No hay ningún comentario sobre este test.
Temario:
Which of the following MRP elements can be created for a material procured externally by a requirements planning run? 2R Production order Scheduling agreement schedule lines Sales order Purchase requisition Purchase order Outline agreement .
Which of the following factors influence the type of procurement proposals that are created by the MRP run? 2R The procurement type of a material The MRP procedure of a material The plant parameters The method to run MRP .
How many subcontractors can be included in a subcontractor type MRP area? 1R 0 1 2 Unlimited.
Select the possible types of MRP area for planning. 3R Company code Plant Warehouse Storage location Subcontractor .
Which field in the material master record controls whether a material is planned consumption-based or demand-based? 1R The MRP profile The MRP type The MRP group The MRP controller .
On which organizational levels can MRP relevant fields like lot-sizing procedure or MRP type be maintained in a material master record? 2R Plant Storage location MRP area Client .
Which of the following statements apply to the MRP type? 2R The MRP type is assigned to a material and controls the MRP procedure. A material can have different MRP types per plant and even per MRP area. The MRP types are delivered by SAP and cannot be changed. Allowed MRP types are defined per material type. .
What are the lot sizing procedure categories? 3R Static Periodic Exact Optimizing Dynamic .
During net requirements calculation of a material planned with reorder point planning, the warehouse stock available for MRP includes the plant stock and the on-order stock. Which of the following elements belong to on-order stock? 3R Purchase requisitions Purchase orders Sales orders Firm planned orders Fixed purchase requisitions Planned orders .
How many processing keys for the planning run are available? 1R One Two Three Four.
What is the correct processing key to use if you want to trigger regenerative planning? 1R NETCH NEUPL .
What are the options for converting a planned order into a purchase requisition? 2R Individual conversion Collective conversion Conversion by storage location Conversion by purchasing group .
Which of the following forecast models is characterized by a continual increase or decrease of the mean value? 1R Constant model Seasonal model Seasonal trend model Trend model .
Which of the following inputs are required to determine the new basic value in a forecast with first order exponential smoothing? 3R Basic value from the preceding period Last past consumption value Mean absolute deviation Alpha smoothing factor .
What is the minimum historical value required for the seasonal forecast model? 1R 1 3 13 15.
What are the options for performing a forecast in the SAP system? 4R Total forecast online Individual forecast Individual forecast for a material without a material master record Total forecast in background processing Individual forecast in the material master record Interim forecast .
Which of the following indicators do you use to define the number of forecast periods that are to be considered in material requirements planning when using forecast-based planning? 1R Safety time indicator Splitting indicator Forecast indicator Consumption indicator .
Which of the following steps are involved in backward scheduling? 3R The system determines the release date of the purchase requisition backwards from the requirements date. The purchasing department processing time, in working days, is added to determine the release date. The opening period is counted back from the order start date. For a start date in the past, the system automatically switches to forward scheduling. .
Which of the following is the correct algorithm for determining the time interval during the time-phased planning run? 1R MRP date + planning cycle + purchasing department processing time + goods receipt processing time MRP date + planning cycle + purchasing department processing time + planned delivery time + goods receipt processing time MRP date + planning cycle + planned delivery time + goods receipt processing time MRP date + planning cycle + purchasing department processing time + planned delivery time .
Select the possible sources of supply that can be used by an MRP run for an externally procured material in the SAP system. 3R The purchasing information record (info record) Sales order Contract Means of transportation Scheduling agreement .
Select the correct and available system options for automatic source determination during an MRP run. 2R Use the source list to assign a source to a purchase requisition. Use a quota arrangement for automatic source determination during MRP. Use an existing production order to automatically select the right "source": the plant in which you want to produce the material. Use a special procurement key called SRM to let the MRP run automatically select a source of supply based on SRM quotation processing. .