TEST DICIEMBRE_01

COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del Test:
TEST DICIEMBRE_01

Descripción:
TEST DICIEMBRE_01

Fecha de Creación: 2022/12/09

Categoría: Otros

Número Preguntas: 40

Valoración:(0)
COMPARTE EL TEST
Nuevo ComentarioNuevo Comentario
Comentarios
NO HAY REGISTROS
Temario:

Which prerequisites do you require for SAP Asset Manager? (2 correct). SAP Mobile Platform. Mobile Add-On for SAP S/4 HANA. SAP Cloud Platform. Mobile Add-On for SAP ERP.

To which objects can you assign a budget? (2 correct). Function allocation. Maintenance order. Planning plant. WBS element.

To which object can you assign a safety plant? (2 correct). Permit. Maintenance Order. Work Approval. Task List.

You require stock material to carry out maintenance tasks. Which of the following statements regarding material planning in the maintenance order are correct? (3 correct). Material can be assigned at order header level. The pick list for materials can be printed before order release. Material can be assigned at order operation level. A control key for internal workforce is required when assigning stock material to an order operation. A goods receipt can e entered fro a technically completed maintenance order.

What is the purpose of preventive maintenance in SAP Enterprise Asset Management (SAP EAM)?. To reduce maintenance cost by incresing the number of breakdowns. To increase maintenance costs by reducing the number of breakdowns. To avoid a more expensive breakdown maintenance process further down the road. To betterplan maintenance work by changing from a proactive maintenance approach to a reactive maintenance approach.

You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. (2 correct). Assign an inspection lot to the task list header. Assign a piece of equipment with an allocated measuring point to a task list operation. Assign an inspection document as PRT to the task list operation. Assign a measuring point as 4 production resources/tools (PRT) to a task list operation.

What are the effects when the planner releases a maintenance order? (3 correct). The planner can estimate costs. The planner can print the job papers. The warehouse clerk can post a goods issue. The technican can record confirmations. The planner CANNOT change planned costs.

In which implementation phase do you perform data load preparation?. Explore. Deploy. Prepare. Realize.

What is the purpose of the SAP GUI Beize theme?. Create a similar user experience as in SAP Fiori Launchpad. Create a simplified copy of a transaction. Make Web Dynpro apps available for SAP GUI. Make SAPUI5 apps available for SAP GUI.

In which of the following locations can object information be found? (3 correct). In a master record for the technical object. In a document. In a order. In a notification.

Which process steps belong only to the SAP Fiori-bases process Report Malfunction? (2 correct). Change to In Process. Set work Paused. Print shop papers. Create measurement reading.

When does the system create the entries in the web apply job list for the technician?. When the planner performs capacity planning. When the planner prints the job card. When the planner creates the maintenance order. When the planner releases the mainenance order.

How does a performance-based maintenance plan calculate the interval between start date and planned date?. Cycle length divided by (annual performance /365). Cycle length divided by monthly performance. Cycle length divided by annual performance. Cycle length divided by ((sheduling period) x (cycle modification factor)).

What is the goal of embedded analytics in SAP S/4 HANA?. Integrate SAP BW into SAP S/4 HANA. Integrate SAP BusinessObjects Business Intelligence into SAP S/4 HANA. Combine the HANA database with SAP BW InforProviders. Combine transactional and analytical processing.

What are mandatory fields required to create the malfunction report? (2 correct). Description. Notification Type. Technical Object. Reported on date and time.

Which material type is the best choice if you only want to create a structure element within the BOM?. Non-valuated material (UNBW). Maintenance assembly (IBAU). Operationg supplies (HIBE). Spare part (ERSA).

You want to create a single cycle plan with a cycle of 12 months. You use the Time-key date scheduling indicator. The orders should be called 2 months before the planned date. How can you set up the maintenance plan? (2 correct). Set the call horizon to 90 days. Set the offset to 3 months. Set the call horizon to 75%. Set the call horizon to 25%.

Where do you add a warranty subscreen if you require warranty data in the equipment master. Warranty category. Master warranty. View profile for technical object. View selection of equipment master.

What must you assign for a cross-plant planning scenario?. Multiple planning plants to a maintenance plant. The same planner group to multiple planning plants. The same planner group to multiple maintenance plants. The same planning plant to multiple maintenance plants.

Where can the planner check the material availability? (3 correct). Withing the SAP Fiori-based background job. From the list of orders. From the reservation list. Within an individual order. Withing the SAP Fiori-based Material Documents Overview.

You want to create a maintenance order with an external order operation with service items. Which of the following statements are correct? (3 correct). The usage of a model service specification is mandatory. The assignment of a service master record is mandatory. The assignment of a control key with the service indicator set is mandatory. The assignment of service master records to an order operations is optional. The actual value entry can only be recorded via the service entry sheet.

You use SAP Work Manager. Which operations can the Maintenance Worker execute? (2 correct). Create equipment Install equipment. Schedule resources Change task list. Change BON Create a work order on the ESRI map. Create notification Create a measurement reading.

Where can you assign activities? (2 correct). Notification header. Order operation. Notification item. Order header.

The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? (2 correct). Open reservations can be cleared when 4 maintenance order operation is finally confirmed. For the combinantion of order type and planner group you can decide when reservations are created. All open reservations are closed when the maintenance order is set to TECO. Reservations are created only after a material availability check has been performed.

You create a revision for a maintenance event builder (MEB) scenario. Which of the following statements are correct? (2 correct). You can assign a network to a revision. You must use hierarchical task lists for the MEB scenario. You can assign a hierarchical task list to the revision. You must assign maintenance notifications to the revision.

The technical completion of the actual maintenance order was posted with a delay of 10 days. How can the planner shift the next planned date by the same amount?. Set the shift factor for late completion to 100%. Set the shift factor for late completion to 10%. Set the shift factor for early completion to 10%. Set the shift factor for early completion to 100%.

Which of the following provides general information on the SAP system and transaction or task on which you are working?. Status bar. Role bar. Menu path. Application toolbar.

Which of the following is a scheduling indicator?. Time-eariest date. Time-fixed date. Time-latest date. Time-key date.

Which technical objects can use ABC indicators? (2 correct). Maintenance plants. Planner groups. Equipment. Fuctional allocations.

How do you set up the visible tiles for a specific user is SAP Fiori launchpad? (2 correct). By assigning the tiles directly. By assigning a PFCG role with an SAP Fiori tile group. By assigning a portal role with a SAP Fiori catalog. By assigning a PFCG role with an SAP Fiori catalog.

What can a planner monitor with the Resource Scheduling for Maintenance Planners SAP Fiori app? (2 correct). Non-available stock materials. Maintenance orders NOT confirmed. Notifications without mainenance orders. Workload of work centers.

Which of the following roles is responsible for executing an order during the corrective maintenance process? (2 correct). Warehouse Clerk. Maintenance Supervisor. Maintenance Technician. Maintenance Planner.

What are the names of SAP S/4 HANA cloud editions? (3 correct). Marketing Cloud. Supply Chain Cloud. Enterprise Management Cloud. Professional Services Cloud.

Which statements about the structure indicator are correct? (2 correct). It defines hierarchy levels of the functional locations structure. It defines which data is transferred to the lower levels of the hierarchy. It can have a maximum length of 50 characters. It defines the allowed characters for a functional location.

What is the consequence when you activate alternative labelling?. You CANNOT deactivate an alternative labelling. You can change the primary functional location label and keep the old label as a historical label. The labelling system must be assigned to the functional location category. You can change a primary functional location label and delete the old functional location label.

What is the purpose of the work center assigned to the reference object in a work order? (2 correct). It is needed to settle the order. It is needed to schedule the operations. It is needed to post the goods issue. It is needed to calculate the planned costs.

What is the missing word? With SAP S/4 HANA, OLTP and --------- applications are managed within the same system. ETL. HTTP. OLAP. JSON.

Which of the following statements are correct for SAP S/4 HANA Cloud- Asset Management? (2 correct). You have access to the SAP S/4 HANA back end system. You do NOT have access to the SAP S/4 HANA back end system. You can configure SAP S/4HANA Cloud via the self-service configuration UI. You can configure SAP S/4 HANA Cloud via the SAP Asset Intelligence Network.

The planner calls the document flow in the work order. Which of the following document types are directly displayed? (3 correct). Invoice. Time confirmation. Accounting document. Material document. Controlling document.

What is a prerequisite to start a performance-based maintenance plan?. Cycle Modification Factor. Initial Measurement Document. Call horizon. Scheduling Period.