Practece exams
|
|
Título del Test:
![]() Practece exams Descripción: Practece exams |



| Comentarios |
|---|
NO HAY REGISTROS |
|
A project structured where a self-contained team works full time on the project. Matrix project. Functional project. Work breakdown structure. Pure project or skunkworks. Specific events that upon completion mark important progress toward completing a project. Critical phats. Work packages. Milestones. Activities. This defines the hierarchy of project tasks, subtasks, and work packages. Statement of work. Network-planning model. Gantt chart. Work breakdown structure. Pieces of work in a project that consume time to complete. Milestones. Immediate predecessors. Activities. Slack times. A chart that shows both the time and sequence for completing the activities in a project. Work breakdown structure. Activity-system map. Control chart. Gantt chart. Activities that in sequence form the longest chain in a project. Slack path(s). Subtasks. Immediate predecessors. Critical path(s). The difference between the late and early start time for an activity. Lead time. Crashing. Slack. Cycle time. When activities are scheduled with probabilistic task times. Critical Path Method (CPM). Gantt chart scheduling. The Program Evaluation and Review Technique (PERT). Earned Value Management (EVM). The procedure used to reduce project completion time by trading off time versus cost. Crashing. Suboptimization. Fast-tracking. Leveling. A key assumption related to the resources needed to complete activities when using the critical path method. Task times are probabilistic. Activities cannot run in parallel. Resources are always available. Resources are strictly capped per period. A firm that makes predesigned products directly to fill customer orders has this type of production environment. Assemble-to-order. Make-to-stock. Engineer-to-order. Make-to-order. A point where inventory is positioned to allow the production process to operate independently of the customer order delivery process. Manufacturing cell. Reorder point. Bottleneck station. Customer order decoupling point. A firm that designs and builds products from scratch according to customer specifications would have this type of production environment. Assemble-to-order. Make-to-order. Engineer-to-order. Make-to-stock. This is a production layout where similar products are made. Typically, it is scheduled on an as-needed basis in response to current customer demand. Functional workcenter. Manufacturing cell. Project layout. Continuous process. The relationship between how different layout structures are best suited depending on volume and product variety characteristics is depicted on this type of graph. House of quality. Operating characteristic curve. Service-system design matrix. Product–process matrix. Anything that does not add value from the customer’s perspective. Kanban. Waste. Value stream. Kaizen. An integrated set of activities designed to achieve production using minimal inventories of raw materials, work-in-process, and finished goods. Lean production. Batch-and-queue production. Material requirements planning. Mass customization. The Toyota Production System is founded on these two philosophies. Elimination of waste and respect for people. Six Sigma and ISO 9000. Low cost and high inventory. Automation and vertical integration. The set of value- and non–value-adding activities required to design, order, and provide a product from concept to launch, order to delivery, and raw materials to customers. Bill of materials. Master schedule. Value stream. Critical path. The Japanese philosophy that focuses on continuous improvement. Jidoka. Poka-yoke. Kaizen. Kanban. A philosophy in which similar parts are brought together in families for production purposes. Uniform plant loading. Value stream mapping. Group technology. Freeze window. Means producing only what is needed when needed and no more. Make-to-stock production. JIT (just-in-time) production. Economic order quantity. Push scheduling. A period of time during which the production schedule cannot be changed. Lead time. Takt time. Cycle time. Freeze window. Producing a mix of products that matches demand as closely as possible. Aggregate planning. Lot-for-lot ordering. Uniform plant loading. Batch production. A production control system that uses a signaling device to regulate the flow of material. Poka-yoke. Kanban. MRP. Kaizen. A firm wants to justify smaller lot sizes economically. Management knows that it cannot change the cost to carry one unit in inventory because this is largely based on the value of the item. To justify a smaller lot size, what must it do?. Increase annual demand. Increase safety stock. Increase lead time. Reduce setup cost. A computer system that links all areas of a company using an integrated set of application programs and a common database. Warehouse management system (WMS). Material requirements planning (MRP) system. Enterprise resource planning (ERP) system. Customer relationship management (CRM) system. The application programs are designed in accordance with industry norms or _____. Best practices. Custom scripts. Control limits. Legacy silos. Implementing an ERP system is a simple exercise that involves loading software on a computer. True. False. A term used for delivering ERP services on demand over the Internet. Functional silo computing. Cloud computing. Data warehousing. Local client-server hosting. The name of Microsoft’s ERP offering. Oracle NetSuite. PeopleSoft. SAP R/3. Microsoft Dynamics. Part of an ERP system that manages the activities within a certain functional area. Silo. Gateway. Database table. Module. A set of processes to enable vendor-driven replenishment. Cycle counting. Economic order quantity. Vendor-managed inventory. Lot-for-lot ordering. A metric that measures the percentage of orders shipped according to schedule. Inventory turnover. Cash-to-cash cycle time. Fill rate. Delivery performance. The model most appropriate for making a one-time purchase of an item. Price-break model. Fixed–order quantity model. Single-period model. Fixed–time period model. The model most appropriate when inventory is replenished only in fixed intervals of time—for example, on the first Monday of each month. Fixed–order quantity model. Fixed–time period model. ABC classification model. Single-period model. The model most appropriate when a fixed amount must be purchased each time an order is placed. Fixed–time period model. Fixed–order quantity model. Continuous review P-model. Single-period model. Based on an EOQ-type ordering criterion, what cost must be taken to zero if the desire is to have an order quantity of a single unit?. Stockout or shortage cost. Setup or ordering cost. Unit purchase price. Holding or carrying cost. Term used to describe demand that can be accurately calculated to meet the need of a production schedule, for example. Independent demand. Random demand. Seasonal demand. Dependent demand. Term used to describe demand that is uncertain and needs to be forecast. Deterministic demand. Independent demand. Dependent demand. Derived demand. We are being evaluated based on the percentage of total demand met in a year (not the probability of stocking out as used in the chapter). Consider an item that we are managing using a fixed–order quantity model with safety stock. We decide to double the order quantity but leave the reorder point the same. Would you expect the percent of total demand met next year to go up or down? Why?. Go down (lead time increases). Go down (average inventory decreases). Go up (we are taking fewer chances of running out). Stay the same (reorder point did not change). If we take advantage of a quantity discount, would you expect your average inventory to go up or down? Assume that the probability of stocking out criterion stays the same. Will always go down because holding cost drops. Will probably go up if the probability of stocking out stays the same. Will stay the same because demand is unchanged. Will drop to zero between orders. This is an inventory auditing technique where inventory levels are checked more frequently than one time a year. ABC classification. Physical annual inventory. Two-bin replenishment. Cycle counting. Term used for a computer system that integrates application programs for the different functions in a firm. Master production schedule (MPS). Bill-of-materials (BOM). Material requirements planning (MRP). Enterprise resource planning (ERP). Logic used to calculate the needed parts, components, and other materials needed to produce an end item. Enterprise resource planning (ERP). Economic order quantity (EOQ). Material requirements planning (MRP). Capacity requirements planning (CRP). This drives the MRP calculations and is a detailed plan for how we expect to meet demand. Aggregate operations plan. Master production schedule. Bill-of-materials. Inventory status file. Period of time during which a customer has a specified level of opportunity to make changes. Lead time. Cycle time. Time fence. Safety lead time. This identifies the specific materials used to make each item and the correct quantities of each. Planned-order release report. Inventory record file. Master production schedule. Bill-of-materials. If an item is used in two places in a bill-of-materials, say level 3 and level 4, what low-level code would be assigned to the item?. Level 7. Level 0. Level 4. Level 3. These are orders that have already been released and are to arrive in the future. Scheduled receipts. Gross requirements. Planned-order releases. Planned-order receipts. This is the total amount required for a particular item. Net requirements. Gross requirements. Scheduled receipts. Projected on-hand balance. This is the amount needed after considering what we currently have in inventory and what we expect to arrive in the future. Gross requirements. Planned-order releases. Net requirements. Scheduled receipts. The planned-order receipt and planned-order release are offset by this amount of time. Freeze window. Time fence. Lead time. Cycle time. These are the part quantities issued in the planned-order release section of an MRP report. Safety stocks. Low-level codes. Lot sizes. Gross requirements. The term for ordering exactly what is needed each period without regard to economic considerations. Least unit cost. Lot-for-lot ordering. Economic order quantity. Least total cost. None of the techniques for determining order quantity consider this important noneconomic factor that could make the order quantity infeasible. Lead time. Holding cost. Capacity. Setup cost. |