Cuestiones
ayuda
option
Mi Daypo

TEST BORRADO, QUIZÁS LE INTERESEPractica 9

COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del test:
Practica 9

Descripción:
Practica 9

Autor:
Alejandr@
(Otros tests del mismo autor)

Fecha de Creación:
28/03/2024

Categoría:
Otros

Número preguntas: 22
Comparte el test:
Facebook
Twitter
Whatsapp
Comparte el test:
Facebook
Twitter
Whatsapp
Últimos Comentarios
No hay ningún comentario sobre este test.
Temario:
Which of the following business processes are controlled by production order type-dependent parameters? There are 2 correct answers to this question. Implementation Engineering change management Planning Inspection during production.
How can you enhance the system statuses of a production order scenario with user statuses? Please choose the correct answer. By creating a user profile and assigning it to the production scheduling profile By activating the user statuses in status and action management By enhancing the system status customizing table with user statuses By defining a status profile and assigning it to the order type.
Which of the following isn’t considered for overall duration of an operation? Please choose the correct answer. Wait time Queue time Setup time Processing time Teardown time.
In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Please choose the correct answer. Bill of material Repetitive manufacturing profile Cost collector Production version.
Which of the following are supported with advanced production integration? There are 2 correct answers to this question. Process orders Repetitive manufacturing Kanban Production orders.
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? There are 2 correct answers to this question. The work center has several individual capacities. The Change Planning Direct on indicator is set. Alternative resources are fully occupied. The planning strategy is infinite.
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order. Which is the appropriate planning strategy to use? Please choose the correct answer. 50 Planning without final assembly 20 Make to order production 40 Planning with final assembly 30 Production by lot size.
Which tool is the central tool for interactive capacity planning in SAP S/4HANA Advanced Planning? Please choose the correct answer. Planning Table Detailed Scheduling Planning Board Product Overview Product View.
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar. Which type of lot size procedure should you use to accomplish this? Please choose the correct answer. Fixed lot sizing Exact lot sizing Minimum lot sizing Periodic lot sizing.
What are the consequences if operation status Dispatched is set for a production order operation? Please choose the correct answer You can reschedule the operation using lead the scheduling. You can reschedule the operation using finite Scheduling in a planning board. You can reschedule the order using material requirements planning. You can reschedule the order using lead time scheduling.
You want to use capacity availability checks for production orders. Which settings have to be made for this? There are 2 correct answers to this question. A checking rule must be assigned in the checking control. An overall profile must be assigned in the checking control. The PRT Availability Check must be set in the checking control. The Relevant for Finite Scheduling indicator must be set.
The end user is working on a production order but can't post GI for the order, encountering error message Current order status does not allow goods withdrawals. The user then tried to confirm the order and again encountered an error. The Order is not released. What is the next course of action the user should take? Please choose the correct answer. Try to post GR, and the error may be resolved. First, release the order. First, print the shop floor papers. Delete the order because there are so many errors in it.
Where does the system check master data selection settings during the creation of planned orders and production orders? There are 3 correct answers to this question. In the MRP controller In the routing In the production version In the production order type In the bill of materials (BOM).
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend? Please choose the correct answer. Forecast planning Consumption-based planning Manual planning without check Material requirements planning.
The method in which a production order is credited or debited depends on the variant of cost object controlling (COC). What basis can be used to carry this out? There are 2 correct answers to this question. Product-related Milestone-related Cost-related Order-related.
How would you define pegging in the context of Advanced Planning? Please choose the correct answer. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
On which of the following levels can you influence the availability check for the components of production ? There are 2 correct answers to this question MRP controller Material master Production order type Production controller.
To view alerts in PP/DS, what setup needs to be created? There are 2 correct answers to this question. Configure alerts in the core interface Select material-specific alerts in the product master Create an application-specific profile Assign an alert profile to the planning tool.
Which of the following is a valid sequence of the main activities in product on order processing? Please choose the correct answer. Creation, scheduling, release, variance calculation, confirmation Creation, release, scheduling, material withdrawal, confirmation Creation, scheduling, release, material withdrawal, confirmation Creation, staging, release, material withdrawal, confirmation.
For a production version to be valid and consistent what requirements must be fulfilled? There are 3 correct answers to this question. The lot size range must be within the lot-size range of the assigned routing. The assigned routing and bill of materials (BOM) must be valid in the entire validity period. The assigned routing must be a rate routing. The assigned routing must NOT have alternative sequences. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
Which of the following elements does the MRP run take into account? There are 2 correct answers to this question. Material documents Sales orders Planned independent requirements Shipments.
What statements are true concerning a plant? There are 3 correct answers to this question. Several purchasing organizations can be assigned to a plant. Product costing can be performed across plants. A plant can belong to many company codes. A plant/division combination can be assigned to only one business area.