option
Cuestiones
ayuda
daypo
buscar.php

Preguntas VALIDEXAM (Certi)

COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del Test:
Preguntas VALIDEXAM (Certi)

Descripción:
CERTI EAM

Fecha de Creación: 2025/12/04

Categoría: Otros

Número Preguntas: 80

Valoración:(0)
COMPARTE EL TEST
Nuevo ComentarioNuevo Comentario
Comentarios
NO HAY REGISTROS
Temario:

You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question. Edit classification data and characteristics. Create a task list for functional location. Assign documents. Change a reference location. Assign a subordinate piece of equipment.

You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question. Scheduling period. Start counter reading. Estimated annual performance. Counter overflow reading.

You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question. The effective costs are posted as a credit memo to a price difference account. The effective costs are posted to the respective batch (valuation type). The goods receipt for the batch refurbished is posted with the value of the standard price. The goods receipt for the batch refurbished is posted with the value of the moving average price.

Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question. Confirm time sheets • Attach documents. Schedule resources • Change task list. Display maps • Display and maintain technical objects. Change BOM • Create a work order on the ESRI map.

What are mandatory characteristics of orders with Operation Account Assignment (OAA)? Note: There are 3 correct answers to this question. What are mandatory characteristics of orders with Operation Account Assignment (OAA)? Note: There are 3 correct answers to this question. A technical object must be assigned to an order operation. Costs are stored only for the operation object. Purchase requisitions have the operation as account assignment. The settlement rule is maintained on the header level.

What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question. Add a serialized material to the equipment serial data view. Assign a serial number profile to an additional business view for equipment category. Assign a serial number profile to the equipment category. Assign a serial number profile to the related material master. Maintain a serial number for an existing equipment master.

You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?. Package hierarchy. Scheduling indicator. Maintenance package offset. Cycle modification factor.

During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question. Maintenance work center. Maintenance planner group. Organizational unit. Storage location.

Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct answers to this question. Maintenance plan header. Work order confirmation. Maintenance plan item. Equipment task list. Notification item.

Which steps are available for the maintenance technician when using the Report Malfunction bile? Note: There are 3 correct answers to this question. Select and print the maintenance order shop papers. Display the current location of the technical object. Add a URL to provide further information. View details of the technical object by navigating to the Asset Viewer. Input estimated costs for repair malfunction.

Which of the following is a prerequisite for external refurbishment?. Define the order type for external refurbishment. Select the material group for externally refurbished materials. Assign an external work center to a maintenance order operation. Activate the subcontracting indicator in an external activity.

What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question. Goods receipts for external services can be entered. The planner can change planned costs at the operation level. The planner can change estimated costs only at the header level. The controller can determine actual cost surcharges. The assignment of the notification to the maintenance order header cannot be deleted.

Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question. Generate Inspection Lols within the checklists view. Link PM task list with assigned inspection point type to a maintenance item. Record the usage decision for an Inspection Lot. Generate Inspection Lots assigned to maintenance order headers.

Which objects can you assign to a Maintenance Service Order Item? Note: There are 2 correct answers to this question. Service Product. DIP Profile. Service Work Center. Service Master Record.

Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?. SAP Asset Strategy and Performance Management. SAP Lumira Designer. SAP S/4HANA Core Data Services. SAP Predictive Analysis.

Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question. Preconfigured Core Data Service (CDS) containing SQL views. A collection of tools that are not included with core SAP S/4HANA. SAP Business Objects as a part of SAP Business Warehouse (BW). SAP Business Objects Business Intelligence for Visualization.

Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question. An Inspection Plan and a technical object must be assigned to the same class. A PM task list with inspection point type must be assigned to the maintenance order. An object list must have been generated manually or automatically. A checklist type must be assigned to the maintenance order header.

How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct answers to this question. Via cost center assigned to a personnel number. Via cost center and activity type. Via organizational unit and personal hourly rate. Via activity type and hourly rate.

Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers to this question. Worker Safety applications. SAP Asset Performance Management. SAP Work Manager. SAP Service and Asset Manager (formerly SAP Asset Manager).

Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question. You can configure SAP S/4HANA Cloud via the self-service configuration UI. You have access to the SAP S/4HANA back-end system. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network. You do NOT have access to the SAP S/4HANA back-end system.

The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?. Planned date of the next call, independent of maintenance order dates. Actual finish date of the maintenance order. The date of the final confirmation. Technical completion date of the maintenance order.

To which objects can a personnel number be directly assigned? Note: There are 2 correct answers to this question?. Planner group. Maintenance plan. Work center. Business partner.

What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question. If you use the Resource Scheduling apps, you always dispatch orders and operations. The order moves to the Preparation phase once it is approved and released. Maintenance Planning Buckets give you a list of non-approved notifications. The configuration of the order type decides whether you use Resource Scheduling or not.

Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 2 correct answers to this question. Lock or unlock the order. Update the estimated costs. Change the settlement rule. Change the planned costs.

Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?. Via the SAP Fiori app "Manage Maintenance Order List". Within the SAP Fion-based background job. Via the SAP Fiori app "Maintenance Scheduling Board". Via the SAP Fiori epp "Manage Maintenance Planning Buckets".

What do you need to configure to enable entries in the action log of a piece of equipment?. Define history related fields in the usage period customizing. Activate the change documents for the equipment category. Define the corresponding history related field for the equipment reference category. Activate the change documents for the equipment reference category.

Activate the change documents for the equipment reference category. There are 2 correct answers to this question. Schedule • Dispatch. Release • Print. Complete • Close Report. Release • Start Work.

Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question. Scheduling period. Start date. Scheduling indicator. Factory calendar.

The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?. A purchase requisition can be created automatically as soon as the order is saved. The maintenance order can be set to TECO before the invoice is created. A goods receipt can be posted after the maintenance order is technically completed. A purchase order is created automatically as soon as the order is saved. A purchase requisition will ALWAYS be created as soon as the order is saved.

Which settings must be customized to set up Inspection Checklist processing? Note: There are 2. Maintain settings at plant level for usage decisions. Create a control key which expects inspection characteristic assignments. Assign an Inspection Type to a Maintenance Order Type and a Planning Plant. Assign an Inspection Type to a Maintenance Order Type.

What do you have to consider when setting up phase-based maintenance?. It is mandatory for breakdown and preventive maintenance. It is not possible to configure the nine delivered phases. It can be used with any existing order type. It comes preconfigured when using the relevant Best Practices scope items.

Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?. Package offset. Scheduling type. Initial/subsequent buffer. Call horizon.

Which SAP UI technology is used for the Report and Repair Malfunction app?. Web Dynpro. SAP GUI for HTML. SAPUI5. Business Server Pages.

You require stock material to carry out maintenance tasks. What do you have to consider regarding material planning in the maintenance order? Note: There are 2 correct answers to this question?. Material can be assigned at the order header level. For stock material you always need a reservation. A goods issue can be entered for planned and unplanned material. The pick list for materials can be printed before order release.

Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question?. Technical objects. Work orders and operations. ESRI Maps. Cost analytics. Breakdown analytics.

Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question. Completion data. Maintenance activity type. Call object. Change documents. Order type.

In which maintenance object can you use an activity type? Note: There are 2 correct answers to this question. Maintenance order header. Notification activity. Maintenance order operation. Work center.

You want to display additional document information within the document flow of a maintenance order. For which type of document must this be customized?. Invoice. Purchase order. Goods movement. Service entry sheet.

Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question. Schedule and dispatch maintenance operations by shifts. Dispatch maintenance order operations. Monitor maintenance order operations due in the next 4 weeks. Print job papers from a maintenance order.

Which default object type do you use to settle a refurbishment order?. The cost center. The WBS element. The fixed asset. The material.

Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question. Plan repair work for the responsible work center. Assign a production resource tool (PRT) to the operation. Complete the malfunction report. Verify planned and actual costs. Find malfunction records already created in a list.

How can you assign a material BOM to a piece of equipment?. Via field model number in the equipment master. Via material BOM header in the serialization data. Via creation of an equipment BOM. Via field construction type.

You want to display vehicle-specific data for a piece of equipment. How do you proceed?. Set the relevant flags in Customizing activity "Define Additional Business Views for Equipment Categories". Assign a view profile to the combination of vehicle type and equipment category. Assign a view profile to the combination of equipment category and vehicle class. Assign a view profile to an equipment category for fleet equipment.

What do you have to consider regarding a cross-plant planning scenario?. Multiple maintenance plants are assigned to a planning plant (n: 1). Only a maximum number of five maintenance plants can be assigned to a planning plant. Multiple planning plants are assigned to a maintenance plant (m: 1). It is only possible within the same company code.

You schedule a Maintenance Service Plan. Which call object is generated?. Maintenance Order which is linked to a Service Order Header. Customer Service Order with assigned DIP profile. Customer Service Order with an external order operation. Maintenance Order which is linked to a Service Order Item.

What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to this. It is based on an SAP Fiori tile catalog. It provides only HTML5-based apps. It can be assigned directly to the user via personalization. It is assigned via a portal role.

You want to implement SAPUI5 apps in your SAP Fiori Launchpad. Which are mandatory elements? Note. There are 2 correct answers to this question?. Web Dynpro Apps. Transactions. Catalogs. Tile Groups.

What can be determined using the offset within a maintenance strategy? Note: There are 2 correct answers to this question. The first due date of a maintenance package. A one-time shift of a maintenance package. A preliminary buffer shifting the reference date of the maintenance order. The call date for the maintenance order.

What are characteristics of the structure indicator? Note: There are 2 correct answers to this question. It limits the types of characters in the edit mask to Alpha and Numeric. It restricts the number of hierarchical levels to no more than 6. It defines the allowed characters for a functional location. It sets the hierarchy levels of the functional location structure.

You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question. Assign a measuring point as a production resources/tools (PRT) to a task list operation. Assign a piece of equipment with an allocated measuring point to a task list operation. Assign an inspection lot to the task list header. Assign an inspection document as a PRT to the task list operation.

How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process?. It always uses the risk-based assessment for prioritization. It is a new business object with no connection to a maintenance notification. It is mandatory to assign a task list to the maintenance request. It contains an additional screening phase where requests can be accepted or rejected.

A Task List contains two operations: • Every 3 MON: pump inspection • Every 24 MON. pump replacement When replacing the pump, the operation pump inspection will be ignored. How can you achieve this?. Assign different hierarchy levels. Set the lead float. Create a task list hierarchy. Create a cycle set sequence.

You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time-key date. The orders should be called 3 months before the planned date.How can you set up the maintenance plan? Note: There are 2 correct answers to this question. Set the call horizon to 25%. Set the call horizon to 75%. Set the offset to 3 months. Set the call horizon to 90 days.

How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question. Through Best Practices scope items 4HH and 4HI. Phase-based maintenance is always active in all S/4HANA 2021 editions and above. By installing the corresponding enhancement pack and activating the related business function. By manually activating the corresponding Business Feature in case Best Practices are not used.

You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct answers to this question. The individual maintenance of the cost center in the equipment master record. The reference functional location of the superior functional location. The cost center of the superior equipment. The cost center of the related maintenance work center.

What is the goal of embedded analytics in SAP S/4HANA?. To integrate BW Data Store Objects. To combine transactional and analytical processing. To allow both tactical and strategic analyses within the S/4HANA core. To integrate BW Info Cubes.

How do you map a counter replacement in SAP S/4HANA Asset Management?. Deactivate the current counter and create a new counter. Create a new measurement document marked as a counter replacement. Create a new measurement document and assign a valuation code for counter replacement. Assign a catalogue type for counter replacement to the measuring point category.

Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question. SAP Crystal Reports. Plant Maintenance Information Systems (PMIS). SAP Lumira. SAP Quick Viewer.

What happens if you change the primary key of a functional location?. The user must define a new labelling system for the new primary key. The functional location cannot be assigned to a new superior functional location when the new label is entered. Changing the superior functional location via alternative labeling is not possible. The user must decide whether the functional location is assigned to a new superior functional location.

You want to create a maintenance order with an external order operation that includes service items. How can you achieve this? Note: There are 2 correct answers to this question. The usage of a model service specification is mandatory. The assignment of a control key with the service indicator set is mandatory. The actual value entry can be recorded only via the service entry sheet. The assignment of a control key with key externally processed operation is sufficient.

How does a performance-based maintenance plan calculate the interval between start date and planned date?. Cycle length divided by (monthly performance x 12). Cycle length divided by annual performance. Cycle length divided by ((scheduling period) x (cycle modification factor)). Cycle length divided by (annual performance/365).

Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question?. Display approved purchase requisitions for which purchase orders have been generated. Display approved purchase requisitions for which NO purchase orders have been generated. Analyze overdue maintenance orders that have NOT been finally confirmed. Analyze confirmed maintenance orders that have NOT been settled. Analyze maintenance orders that are still in planning and have NOT been released. Answer: B.

Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question. Cancel status Released. Change the pronty. Book a goods receipt. Change the estimated costs.

Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question. Within a maintenance order. In the list editing (single-level) for maintenance orders. In the report Material: Where-Used List. In the material reservation list in inventory management.

Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct answers to this question. Calculation key. Planner group. Capacity category. Organizational unit (HR).

The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question. Open reservations can be cleared when a maintenance order operation is finally confirmed. Reservations are created only after a material availability check has been performed. For the combination of order type and planner group, you can decide when reservations are created. All open reservations are closed when the maintenance order is set to TECO.

How do you set up the visible tiles for a specific user in SAP Fiori Launchpad? Note: There are 2 correct answers to this question. By assigning a PFCG role with an SAP Fiori catalog. By assigning a portal role with an SAP Fiori catalog. By assigning a PFCG role with an SAP Fiori tile group. By assigning the tiles directly.

Which capabilities does SAP Service and Asset Manager (formerly SAP Asset Manager) provide? Note: There are 3 correct answers to this question. SAP Service and Asset Manager provides single sign-on functionality. SAP Service and Asset Manager is available for SAP S/4HANA and SAP ERP. SAP Service and Asset Manager can be used offline. SAP Service and Asset Manager is available only for the iOS platform. SAP Service and Asset Manager can run on smart watches.

You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question. Warranty category. Usage period. Object information. Measuring point category. Status profile.

What do you have to consider when planning maintenance work that is to be carried out by an external company?. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system. In the control key assigned to the order operation, the "Service" indicator must always be activated. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet. For the maintenance order type, you have to assign the Enhanced Procurement Mode.

Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question. QM inspection plan with assigned inspection characteristics. Inspection point type assigned to the task list header. Master inspection characteristics assigned to PM task list operations. Classification data assigned to a technical object.

What do you have to consider when implementing Ul technologies in SAP S/4HANA Asset Management? Note: There are 2 correct answers to this question. Web Dynpro apps can be used in the SAP Fiori Launchpad. SAP Fiori Launchpad supports only SAPUIS apps. SAP GUI for HTML can be used in the SAP Fiori Launchpad. The cloud version can also use SAP GUI for Windows.

What are valid item categories for a BOM used in Asset Management? Note: There are 3 correct answers to this question. D (Document item). I (PM Structure element). F (Functional location). L (Stock item). E (Equipment).

You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question. Assign the header material of a material BOM as assembly to a task list operation. Assign the BOM usage for free assignment of material in Customizing. Assign the header material of a material ROM to the assembly field of the task list heade. Assign a piece of equipment with allocated material BOM to a task list operation.

Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question?. Warranty. Configuration. Serial data. Manufacturer data.

You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?. Open reservations are recompiled. Open purchase requisitions are recompiled. Referenced notifications are put in Process again. Open purchase orders are recompiled.

You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?. Scheduling indicator. Scheduling period. End Date for Scheduling. Call horizon.

What do you have to consider when setting up the refurbishment process. Assign valuation type C to the order type. Assign a view profile for refurbishment to the order type. Assign a stock determination rule to the PM order type. Mark the order type for refurbishment in customizing.

The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct. A text in the subject long text screen. An entry in the object list. A task in the notification item. An activity in the notification header.

Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question. Only one object part. One or more causes of damage. Only one cause of damage. One or more object parts.

Denunciar Test