Cuestiones
ayuda
option
Mi Daypo

TEST BORRADO, QUIZÁS LE INTERESESAP ACTIVATE de JUAN

COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del test:
SAP ACTIVATE de JUAN

Descripción:
SAP ACTIVATE De JUAN

Autor:
Juan Davel
(Otros tests del mismo autor)

Fecha de Creación:
14/09/2019

Categoría:
Otros

Número preguntas: 125
Comparte el test:
Facebook
Twitter
Whatsapp
Comparte el test:
Facebook
Twitter
Whatsapp
Últimos Comentarios
No hay ningún comentario sobre este test.
Temario:
What is a deliverable of the Application. Customer Team Enablement work stream in the Prepare phase of SAP Activate? Project Charter Learning plan Knowledge transfer to end users Project Documentation.
Which activity is part of the SAP Activate Methodology for a new implementation of SAP S/4HANA on-premise edition but NOT of the cloud edition? User Acceptance Test Technical System Test Unit Test End-to-End Integration Test.
Your project is performing some high-level planning for a System Conversion journey from SAP Business Suite to SAP S/4HANA on-premise edition. What is the correct sequence of selected key deliverables across the project phases? Please choose the correct answer. a. Detailed system Assessment b. Production Readiness Check c. Code Adjustment d. Validation of Migration a. Detailed system Assessment b. Code Adjustment c. Validation of Migration d. Production Readiness Check a. Code adjustment b. Detailed System Assessment c. Production Readiness Check d. Validation of Migration a. Production Readiness Check b. Detailed system Assessment c. Code Adjustment d. Validation of Migration.
Which of the following is not correct about workstreams? There are 2 correct answers to this question. Workstreams are dependent on phase start and end It is assigned as an attribute to phases, deliverables and tasks It is a collection of related deliverables It can span phases.
Which criterion does the Product Owner use to sequence the product backlog? Please choose the correct answer. Resource availability Business priority Complexity Relative effort.
What must you do when you implement SAP Business Suite On-Premise with SAP Best Practices? Please choose the correct answer. Activate and apply SAP Best Practices with SAP Solution Manager Assemble and apply SAP Best Practices to the system Activate and apply SAP Best Practices content with the self-service configuration UI Apply SAP Best Practices with the Configure your Solution application.
What is the most granular level of the methodology you can view in the Roadmap Viewer? Please choose the correct answer. Deliverables Task Phase Scenario.
Which navigation option do you use in the Roadmap Viewer to access the SAP Activate Methodology content? Please choose the correct answer. Navigate by Project Team Member Role Navigate by work stream Navigate by RACI matrix accountability Navigate by assigned Delivery Mode.
Which of the following are the benefits of SAP JAM? There are 2 correct answers to this question. Easy to use Reduced Recovery Time Highly available User collaboration.
What are the benefits of the SAP best practices? There are 3 correct answers to this question. Reduced functional scope Fast time to value Simple on-boarding to cloud Predictable results Fixed organizational structure.
Which accelerations can you use during the Scope Validation/Fit-Gap Analysis activity in the Explore Phase? There are 2 correct answers to this question. Quality Gate Checklist RICEF Specification Template Sprint Backlog Template Solution Validation Workshop.
In the System conversion to SAP S/4 HANA Deploy phase, which of the following tasks are included? Please choose the correct answer. Final testing Interface setup Scheduling project plan Hyper care support.
Which activity helps the project team to add the user stories to the product backlog? Please choose the correct answer. Assessing Project Risks Preparing a Project Schedule Conducting the Solution Validation Planning the User Acceptance Test.
In what respect is SAP Activate Methodology different from the ASAP Methodology? Please choose the correct answer. Leverages iterative incremental build Supports only new implementations Includes Fit/Gap analysis instead of Blueprint Supports cloud deployments.
What do you do during an iterative approach to build a solution? Please choose the correct answer. Include frequent inspection check-points Build the solution module by module Provide a working solution only at the end of the release Deliver a prototype of the solution.
Which tools does SAP Activate provide to support Guided Configuration? There are 3 correct answers to this question. Model Company Self Service Configuration Solution Builder Expert Configuration SAP Solution Composer.
What is a benefit of using Guided Configuration instead of the Implementation Guide? Please choose the correct answer. It ensures SAP updates do NOT conflict with customer configurations It ensures configuration is done using SAP Solution Manager It eliminates the need for Content Lifecycle Management It eliminates the need to generate transport requests for configuration settings.
In which phase of the SAP Activate methodology does the team complete the Transformation Planning? Please choose the correct answer. Explore Realize Deploy Prepare.
In SAP Activate, what replaces the detailed Blueprint from ASAP? Please choose the correct answer. Business Process Mapping Value Determination Fit/Gap Workshops Custom Extension management.
Which estimation technique can be used in Agile project delivery to size the user stories during sprint planning? Please choose the correct answer. Detailed bottom-up effort estimate the breaks each user story up into hours or shorter tasks Relative estimate in ideal person days that reflects the best estimate provided by the project team Detailed bottom-up effort estimate by the SCRUM Master in story points based on the user story complexity Product Owner’s relative estimate of the effort that will be needed to implement the user story.
Which of the following is not correct about Fit/Gap Analysis? There are 2 correct answers to this question. Minimize the needs for rework during realization. Validate pre-activate and pre-assembled solution in the development system. Prioritize delta requirement and gaps. Drive towards adopting customers processes.
Which of the following are available in the initial SAP Methodologies JAM Page? There are 2 correct answers to this question. Accelerators Task description Roadmaps Summary.
Which of the following activities are performed in the Explore phase of SAP Activate in SAP S/4HANA Implementation? There are 3 correct answers to this question. Organizational structure Adjusting custom code objects Creating transactional data Changing master data Implementing best practices.
Which component of SAP Activate offers customers a reference solution in the cloud for a quick start? Please choose the correct answer. Guided Configuration SAP Implementation Assistant SAP Activate Methodology SAP Best Practices.
In which phase do you verify that the SAP Best Practice solution scenarios meet the business needs of the customer? Please choose the correct answer. Prepare Explore Realize Deploy.
What is the key characteristic of Agile project delivery? Please choose the correct answer. Frequent Quality Gates Frequent and detailed project scheduling Iterative build with frequent inspections Formal and detailed documentation.
What are key characteristics of the implementation approach in SAP Activate Methodology? There are 3 correct answers to this question. Validate solution Premium engagement ready Fixed scope Start with SAP Best Practices On-premise only.
What does SAP Activate recommend to keep team members informed and aligned? Please choose the correct answer. Daily e-mail status updates to project manager Daily team stand-up meeting Daily progress review meeting with sponsor Daily status meeting with project manager.
Which of the following are not phases of the SAP Activate methodology? There are 2 correct answers to this question. Preparation Prepare Go-Live & Support Realize.
What information does the product team need so that they can estimate the relative size of backlog user story correctly? Please choose the correct answer. Definition of Done Available project resources Overall project schedule Test strategy.
In which tools can the project team across the SAP Activate Methodology content including accelerators? There are 2 correct answers to this question. Roadmap Viewer SAP Community Network SAP Jam SAP Service Marketplace.
What must you do when you implement SAP Business Suite On-Premise with SAP Best Practices? Please choose the correct answer. Activate and apply SAP Best Practices with SAP Solution Manager Assemble and apply SAP Best Practices to the system Apply SAP Best Practices with the Configure your Solution application Activate and apply SAP Best Practices content with the self-service configuration UI.
Who determines the tasks that are required to complete the committed backlog items in a sprint? Please choose the correct answer. SCRUM Master Project Manager Product Owner Project Team.
In which phase of the SAP Activate methodology does the team complete the Cut-over Rehearsal? Please choose the correct answer. Explore Deploy Prepare Realize.
What are deliverables of the Application: Integration work stream in the prepare phase? There are 3 correct answers to this question. Fit/Gap Analysis Adaptation Specifications Network Connectivity Checks Data Cleansing Security Checks.
What is the best target environment for a System Conversion journey is as described in the SAP Activate methodology? Please choose the correct answer. SAP Hybris SAP S/4HANA Cloud Edition SAP S/4HANA On-Premise Edition Hybrid of SAP S/4HANA Cloud Edition and SAP S/4HANA On-Premise Edition.
Which content is made available after you activate SAP Best Practices for a new financial implementation? There are 2 correct answers to this question. Standard chart of accounts Pre-configured business processes Online help Implementation Guide.
In which of the following project phases is it important to plan and schedule data loads followed by load validation activities? Please choose the correct answer. Realize Explore Prepare Deploy.
Which of the following tools is used to install SAP S/4HANA. Please choose the correct answer. SWPM (Software Provisioning Manager) Cloud Application Library SAP Solution Manager Data Migration server.
What do you do during Sprint Execution? Please choose the correct answer. Present status of selected user stories in the sprint scope on a scrumboard Hold a retrospective at the end of each week End a sprint when the sprint backlog items are all complete Measure the sprint progress with a percentage complete report.
Who determines the priority of user stories in the backlog of an Agile project? Please choose the correct answer. Project Team Project Manager SCRUM Master Product Owner.
Which of the following are the key responsibilities of the Scrum Master? There are 3 correct answers to this question. Task initiator Responsible for the project delivery Leadership skill Team protection Team support.
What is a difference between the SAP Activate methodology for a new implementation of SAP S/4HANA cloud edition and a new implementation of SAP S/4HANA on-premise? Please choose the correct answer. For on-premise, there is an additional Q-Gate for system installation For the cloud edition, there is an additional Q-Gate for integration with on-premise systems For on-premise, there are additional deliverables for the system setup For the cloud edition, there is an additional work stream for integration with on-premise systems.
How can SCRUM teams be organized? By project governance level By project phase By work stream By job title.
SAP now offers the ability to deploy and manage solutions in which of the following environments? Please choose the correct answer. Cloud and On-premise On-premise Cloud Cloud, On-premise and Hybrid.
What is the focus of a SCRUM of SCRUMS in an Agile context? Please choose the correct answer. Best Practice adoption Backlog management Communication to the Project Management Office Integration topics.
Which key activities does the Guided Configuration support you with? There are 3 correct answers to this question. Create test data Test configured processes Train new users View solution scope Manage roles of configuration users.
What are the three pillars of SAP Activate? There are 3 correct answers to this question. Guided Configuration SAP Activate Methodology SAP S/4HANA in-memory database SAP Solution Manager SAP Best Practices.
Which tool can you use to collaborate with other SAP Activate methodology practitioners? Please choose the correct answer. SAP Implementation Assistant SAP Jam SAP Solution Manager Roadmap Viewer.
In which phase you execute the User Acceptance Test? Please choose the correct answer. Deploy Realize Final Preparation Build and Test.
What are SCRUM of SCRUMS? Please choose the correct answer. Integration meeting between the various project teams Frequent inspection of code and configuration prior to quality gates Mechanism for gathering and validating requirements Alternative to regular SCRUM process for smaller teams.
What is the purpose of the Solution Validation activity in the Explore phase? There are 3 correct answers to this question. To verify technical installation To challenge changes to standard To educate project participants To identify gaps To log additional scope items.
What tool do you use to configure an SAP Business Suite on-premise solution? Please choose the correct answer. SAP Implementation Guide ABAP Workbench Configuration Composer Expert Configuration.
In which SAP Activate methodology phase does the team complete the Integration Validation? Please choose the correct answer. Prepare Explore Deploy Realize.
Which of the following activities support the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? There are 2 correct answers to this question. Value determination Data aging configuration Non-production systems migration Custom code Adjustment planning.
What are the responsibilities of the Project Team on level 4 in the picture below? There are 2 correct answers to this question. Identify and resolve issues and risks Perform status reporting and communication Set business priorities, goals and objectives Set Project policy, standards and oversight.
What structure level do you see when you access the Roadmap Viewer and chose work stream navigation? Please choose the correct answer. Scope Item Scenario Deliverable Task.
Which of the following is not correct about the REALIZE phase? There are 2 correct answers to this question. The project team ensures that the build is meeting the business requirements. The team prepares for operations so that the functionality can be brought live. The beginning of the Realize phase the team prepares a list of all the requirements in a backlog. Detailed design workshops are held.
Your project is preparing for the Fit/Gap analysis workshops. If you use the Agile approach, what sequence of activities do you perform in the Explore Phase? Please choose the correct answer. a. Conduct Solution Validation workshops b. Set reference value c. Prioritize initial backlog d. Conduct Delta Design workshops a. Conduct Solution Validation workshops b. Conduct Delta Design workshops c. Set reference value d. Prioritize initial backlog a. Set reference value b. Conduct Solution Validation workshops c. Prioritize initial backlog d. Conduct Delta Design workshops a. Set reference value b. Prioritize initial backlog c. Conduct Delta Design workshops d. Conduct Solution Validation workshops.
What information does the product team need so that they can estimate the relative size of backlog user story correctly? Please choose the correct answer. Definition of Done Available project resources Test strategy Overall project schedule.
In which phase of the SAP Activate Methodology does the team complete the System Assessment? Please choose the correct answer. Explore Deploy Realize Prepare.
Which of the following SAP S/4HANA Landscape Transformation options are enabled? There are 3 correct answers to this question. Security Migration Migration of Selected Applications Migration of Business Units System Consolidation System Upgrade.
Which of the following can be used to navigate through the roadmap? There are 2 correct answers to this question. Phases Workstreams Tasks Deliverables.
Which key deliverable includes the development of RICEFW objects? Please choose the correct answer. Custom Extensions Management Sprint Execution Enhancement Delivery Development Build.
In which SAP Activate methodology phase does the team complete the Transformation Strategy? Please choose the correct answer. Deploy Prepare Explore Realize.
What are the responsibilities of the Product Owner in release and sprint planning? There are 2 correct answers to this question. Analyze the functional and technical dependencies between the user stories Define objectives for each release Prioritize backlog user stories by business priority Estimate the backlog user stories.
The tasks associated with Landscape transportation are in which workstream? Please choose the correct answer. Technical Architecture and Infrastructure Application Solution Adoption System & Data Migration Transition to Operations.
What do you do during post cutover? Please choose the correct answer. Perform the Verification Session of the SAP Going Live Check Setup Operational Support Conduct Organizational Readiness Check Perform Technical System Test.
Which of the following tasks are part of the Production support after the Go Live key deliverable? There are 2 correct answers to this question. Resolve issues identified during the Hyper Care period Set up the Operations Control Center Perform a Technical systems test Provide further training to customer end users.
In Which phase does the Transition to Operations work stream start? Please choose the correct answer. Explore Deploy Prepare Realize.
What is a key characteristic of SAP Activate for new implementations of S/4HANA cloud edition? Please choose the correct answer. Limited involvement of business stakeholders Waterfall approach Start with executable content Design-based.
What can users do in the Roadmap Viewer tool? Please choose the correct answer. Display and navigate detailed SAP Activate methodology WBS Download full SAP Activate methodology content for use off-line Upload SAP Activate WBS into SAP Solution Manager7.1 Create a customer-specific version of SAP Activate Methodology.
What is the purpose of the Solution Builder tool in the SAP Activate Guided Configuration? Please choose the correct answer. To create customer-specific scope items To create delta building blocks for complementary content To activate the Best Practices content To personalize activated, ready-to run business processes.
Which accelerator can help you document the detailed design of solution extensions? Please choose the correct answer. RICEF Specification Template Sprint Backlog Template Change Request Template Product Backlog Template.
Identify the two landscape transformation specific tasks in the explore phase. There are 2 correct answers to this question. Setup Landscape Transformation Software Define the Data Migration Architecture Run a Landscape Transformation Assessment Perform Client transfer.
When do you perform User Acceptance Testing during the Agile Build? Please choose the correct answer. After each Sprint During each Firm-up Sprint Before Integration Testing After Integration Testing.
What is SAP Activate? Please choose the correct answer. A step-by-step instruction on how to remove from SAP best practices to your custom solution A combination of SAP best practices , methodology, and guided configuration A methodology for each of the deployment modes (cloud , on-premise, hybrid) A bundle of ASAP , SAP Launch , and Rapid Deployment Solutions.
Which of the following is true about a cloud implementation project? There are 2 correct answers to this question. The Starter System is specific to SAP S/4HANA Cloud. The entire transport system is kept intact and up and running. Starter Systems are not required to be in place for the 'Fit to Standard' workshops. In the prepare phase of a cloud implementation project the project team provide the customer with materials to review as self-enablement.
What is the minimum number of quality gates mandated by the SAP Activate methodology? Please choose the correct answer. 0 4 3 5.
In which SAP Activate methodology phase does the team identify and design functional quick wins in scope of the conversion project? Please choose the correct answer. Prepare Explore Realize Deploy.
According to the Definition of Done, which activity must be completed for each sprint? Please choose the correct answer. Functionality must be released to the business End user training must be delivered Solution must be built and configured in the development system (DEV) Functionality must be tested in the Quality system (QAS).
What are the responsibilities of the Product Owner in release and sprint planning? There are 2 correct answers to this question. Prioritize backlog user stories by business priority Define objectives for each release Estimate the backlog user stories Analyze the functional and technical dependencies between the user stories.
Which activities are part of the Application: Solution Adaption work stream of SAP Activate for new implementations? There are 3 correct answers to this question. Scope Validation Value Determination Change Management Plan Value Audits Production Support Plan.
Which of the following activities are part of the Realize Phase of a System Conversion journey to SAP S/4HANA On-Premise Edition? There are 3 correct answers to this question. Sandbox system migration Custom code adjustment Development system migration Operations impact analysis Delta configuration.
What are SCRUM of SCRUMS? Please choose the correct answer. Alternative to regular SCRUM process for smaller teams Mechanism for gathering and validating requirements Integration meeting between the various project teams Frequent inspection of code and configuration prior to quality gates.
Which content packages are available in the SAP Package Library? There are 2 correct answers to this question. SAP Activate Methodology SAP Best Practices Rapid Deployment Solutions Solution Builder.
Which of the following content best outlines the scope of the Integration Test? Please choose the correct answer. a. Prototype b. Delta/gap solutions c. Data flows with non-SAP application a. Solution baseline b. Delta/gap solutions c. Data flows with non-SAP application a. Prototype b. Delta configuration c. Data flows between SAP solutions a. Solution baseline b. Delta configuration c. Data flows between SAP solutions.
Which collaboration features can SAP Activate Jam users access? There are 2 correct answers to this question. Update Key Deliverable wikis Tweet questions Ask questions Comment on documents.
Which of the following is not correct about workstreams? There are 2 correct answers to this question. It can span phases Workstreams are dependent on phase start and end It is assigned as an attribute to phases, deliverables and tasks It is a collection of related deliverables.
In which tools can the project team across the SAP Activate Methodology content including accelerators? There are 2 correct answers to this question. Roadmap Viewer SAP Service Marketplace SAP Jam SAP Community Network.
How can SRCUM teams be organized? Please choose the correct answer. By job title By project governance level By project phase By work stream.
How can the project manager help to keep momentum in the project and help to keep the customer involved? There are 2 correct answers to this question. Add customer resources to the project to reduce the need for formal training Leverage agile cycles to build and test the solution Increase the number of Q-Gates Walk through the solution processes with the stakeholders.
Which of the following tasks are required in the Prepare Phase? There are 3 correct answers to this question. Train the project team Identify relevant SAP Best Practices Approve the test strategy Set up the infrastructure to support the project Define the communication plan.
What technique helps agile project teams to prioritize a large, flat backlog? Please choose the correct answer. Planning Poker Retrospective User Story Mapping Fit/Gap Analysis.
Which of the following is a Key Deliverable of the Prepare phase? Please choose the correct answer. Change Impact Analysis and Communication Plan Release and Sprint Plan Baseline Build Solution Scope and Value Determination.
In which phase do you create a prioritized list of user requirements? Please choose the correct answer. Explore Deploy Prepare Realize.
Which of the following Key Deliverables do you complete in the Solution Design work stream in the Explore phase? There are 3 correct answers to this question. Design for the Gaps and Deltas Solution Scope and Value Determination Baseline Build Data Migration Approach Validation Workshops.
What does a project jump-start include for a new implementation of SAP S/4HANA on-premise edition? Please choose the correct answer. Full project SCRUM SAP Best Practices Project team training Rapid prototyping.
Arrange the following in the correct sequence of steps followed for a 'Fit to Standard' workshop. Please choose the correct answer. Demonstrate Business Scenarios and Concepts, Review Best Practice Process Flow, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Discuss how the process fit with customer requirements, Identify gaps, Identify required configuration, Enable customer on execution of scenarios Discuss how the process fit with customer requirements, Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Enable customer on execution of scenarios, Identify gaps Review Best Practice Process Flow, Demonstrate Business Scenarios and Concepts, Identify required configuration, Discuss how the process fit with customer requirements, Enable customer on execution of scenarios, Identify gaps.
Which of the following activities are part of the Deploy Phase of a Landscape Transformation journey to SAP S/4HANA On-Premise Edition? There are 2 correct answers to this question. Solution Activation Access organizational and production readiness Training delivery Optimize software Change Control Management.
What is the final activity in the Realize phase of a new implementation of SAP S/4HANA cloud edition? Please choose the correct answer. Data migration Solution validation Readiness check End-to-End walkthrough.
Which of the following statements about Scrum is correct? Please choose the correct answer. In Scrum, as best practices, we have three main roles, and three artifacts or three ceremonies. The three ceremonies are sprint planning, daily scrum, sprint review (retrospective) Scrum Master defines and prioritizes features and gathers requirements. In Scrum, the team is Self-organized, define all task necessary for all project life cycle.
Which of the following tools are used for rapid database migration? There are 2 correct answers to this question. SWPM (software provisioning manager) SAP Solution Manager Software Update Manager (SUM) Database Migration Option (DMO).
Which of the following building blocks are part of the SAP S/4HANA platform? There are 2 correct answers to this question. LOB Cloud Solution SAP Fiori UX SAP HANA in-memory database SAP Solution Manager.
How are the build and test tasks planned and executed in the Realize phase? Please choose the correct answer. With Q-Gates for sign off after each iteration By using the sprint backlog list as input for each iteration By using incremental build in fixed-scope iteration By executing regression tests after each iteration.
What is the objective of a sprint retrospective meeting? Please choose the correct answer. Review and prioritize the backlog Provide formal feedback to the project manager Define the stakeholder management approach Improve the SCRUM process.
Which new project roles are introduced with the SAP Activate Agile methodology? There are 2 correct answers to this question. SCRUM Master Design Thinking Coach Integration Lead Product Owner.
What is the purpose of a firm-up sprint? Please choose the correct answer. To perform sprint testing To revise a release plan and sprint plan To demonstrate functionality from previous sprint To run end-to-end integration test.
How many deliverables are a part of the Key Deliverable 'Project Initiation'? Please choose the correct answer. Three Two One Four.
Which activities are part of the Design and Configuration application of the SAP Activate methodology? There are 2 correct answers to this question. Conduct Scope Validation Schedule kick-off workshop Confirm Integration prerequisites Perform Fit/Gap Analysis.
Which of the following are the pillars of SAP Activate? There are 3 correct answers to this question. SAP Launch Methodology SAP Best Practices SAP Activate Methodology SAP ASAP Methodology Guided Configuration.
What is the purpose of the scrumboard? Please choose the correct answer. To show the functional breakdown of the solution scope To visualize team progress To document the results of integration testing To manage the resource load.
What is the hierarchy level under Phase in the SAP Jam space for SAP Activate on-premise? Please choose the correct answer. Key Deliverable Scenario Task Work Stream.
Which of the following are not phases of the SAP Activate methodology? There are 2 correct answers to this question. Prepare Go-Live & Support Realize Preparation.
What is the purpose of the SAP Activate Methodology? Please choose the correct answer. To accelerate the initial implementation of SAP S/4HANA To manage project and solution documentation To provide end-to-end integrated application lifecycle management To enable access to the SAP ecosystem.
How do you gain access to the SAP Activate Methodology Jam site? Please choose the correct answer. Send e-mail to SAP contact address Submit e-mail address via on-line form Join SAP S/4HANA group on SAP Community Network Register on SAP Service Marketplace.
When does the project team receive formal confirmation that the user stories are completed to the satisfaction of the product owner? Please choose the correct answer. During the sprint retrospective During user acceptance testing During the sprint review During the daily SCRUM meeting.
Which activities are critical for delivering Agile projects? There are 2 correct answers to this question. Sprint planning Retrospective agenda creation Blueprint scheduling Release planning.
Which deliverable is specific to on-premise and NOT for the cloud? Please choose the correct answer. Knowledge Transfer Adaptation Specification Learning Needs Analysis Technical Design Solution.
Which of the following is not a characteristic that the quality principles are based on? Please choose the correct answer Experience of Typical Pitfalls SAP Quality Award example winners Best Practices International standard.
In the context of Scrum, which of the following statements are correct? Two correct Product Backlog is a list of features prioritized by business value, the items come from diverse sources, including the Scrum team. sprint backlog is a subset of product backlog loaded onto the sprint's "timebox", it is the list of work the team is addressing during the current sprint. Burndown chart provides visibility into the product backlog, illustrate progress by the team, work is in horizontal and time is in the vertical.
Which of the following statement are the true regarding the SAP JAM site? Choose the correct answer. only one correct It provides information only on cloud deployments. It provides information only on premise deployments. It provides information on both premise and cloud deployments.
Which of the following activities are performed in the Explore phase of SAP Activate in SAP S/4 HANA Implementation? Choose the correct answers. Defining organizational structure Adjusting pre-delivered master data for workshops Creating sample transactional data for workshops Adjusting custom code objects Writing technical design documents.
Which of the following dimensions need to be considered during prioritization? Choose all corrects Importance Scaling Integration.
Regarding user stories and releases, which of the following statements are correct? Choose the correct answers. A user story is a tool used in Agile Software development to capture a description of a software feature from an end-user perspective. The user story describes the type of user. what they want and why. A user story helps to create a simplified description of a requirement. A release is a deployable software package that is the culmination of several iterations. Releases can be made before the end of an iteration.
Denunciar test Consentimiento Condiciones de uso