option
Cuestiones
ayuda
daypo
buscar.php
TEST BORRADO, QUIZÁS LE INTERESE: SAP Certified Technology Specialist - S4HANA2020 Upgrade
COMENTARIOS ESTADÍSTICAS RÉCORDS
REALIZAR TEST
Título del Test:
SAP Certified Technology Specialist - S4HANA2020 Upgrade

Descripción:
SAP Certified Technology Specialist - S4HANA Conversion and SAP System Upgrade

Autor:
Peter Alvarado
OTROS TESTS DEL AUTOR

Fecha de Creación:
16/08/2021

Categoría: Otros

Número Preguntas: 47
COMPARTE EL TEST
COMENTARNuevo Comentario
No hay ningún comentario sobre este test.
Temario:
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error? There are 2 correct answers to this question. Check the most recent entries shown in file sapevt.trc Check the system log (transaction SM21) of the SAP system Check the messages shown by the SUM UI Check the most recent entries in SAPup.log.
Which preparational steps must be performed for an SAP S/4HANA conversion? There are 2 correct answers to this question. Uninstall industry extensions not supported by SAP S/4HANA Install add-on SAP Gateway 7.50 Uninstall Fiori apps not released for SAP_UI 7.50 Delete client 066 (Early Watch Client).
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this? There are 2 correct answers to this question. Check for running batch jobs in the shadow system via Job Overview (SM37) Check for running R3trans processes on the host of the primary application server Check for running R3load processes on the host of the primary application server Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp.
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. The source system is non-Unicode and the target database is a scale-out system. What do you need to consider? There are 2 correct answers to this question. The target database size increases temporarily because of Shadow Repository Network capacity between exporting and importing R3load processes must be considered Unicode conversion is part of DMO only in case target version AS ABAP 7.40 or 7.31 SAP HANA Landscape Reorganisation requires a manual step to edit a file.
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance? There are 2 correct answers to this question Conversion of application tables (PARCONV_UPG) Activation of dictionary objects (ACT_UPG) Switch to new repository (EU_SWITCH) Modification adjustment (SPDD).
During a DMO procedure with SUM, after which phase is the repository first available on the target database? Please choose the correct answer. Uptime migration (EU_CLONE_MIG_UT_RUN) Parallel distribution (PARDIST_SHD) Downtime migration (EU_CLONE_MIG_DT_RUN) Shadow repository creation (EU_IMPORT*).
Which Guides contain information about SUM phases starting with "EU_CLONE_"? There are 2 correct answers to this question. The SAP S/4HANA Conversion Guide The Application Guide The major SUM Guide The DMO Guide.
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction". Where can you change this during the migration via the Utilities option of the SUM UI? There are 2 correct answers to this question In SUM Phaselist In Process Control Center In SUM Parameters In DMO Migration Preparation.
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure? There are 3 correct answers to this question Execution of SPAU modification adjustment Execution of eCATTs for business validation tests Creation of the table structures in the new SAP HANA database Execution of SPDD modification adjustment Execution of XPRAs and AIMs.
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column. What does the "Calculated level" indicate for those software components? Please choose the correct answer. The SAP Support Packages that will be bound to the upgrade The SAP Support Packages contained in the upgrade media The SAP Support Packages found in the download directory The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner.
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"? There are 2 correct answers to this question. Keep archiving on during the whole procedure. Use the Near Zero Downtime Maintenance Technology (NZDM). Reuse a profile for the shadow instance from a previous run. Choose the instance number of the shadow instance.
What do you do to prepare the database migration option of a SUM procedure? There are 3 correct answers to this question. Extract the SAP HANA database installation archive Move the stack.xml update file into the download folder Extract the SAP HANA client installation archive Move the SPAM update archive into the download folder Move the R3trans update archive into the download folder.
What is the benefit of using the file UPGANA.XML from a previous SUM run? Please choose the correct answer To auto-fill specific fields on selected screens on the SUM UI To make the progress information within SUM UI more accurate To repeat specific phases during the SUM run To skip selected phases during the SUM run.
Which circumstances will allow SUM to run without the creation of a shadow system? Please choose the correct answer. Using the main configuration option "Single System" when installing an Add-On Using the main configuration option "Single System" in case of an upgrade Using the database migration option (DMO) for SUM Using the main configuration option "Standard" when applying SAP Support Packages.
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)? There are 2 correct answers to this question. During downtime During SPDD Post-downtime During uptime.
You are executing a SUM procedure to update an SAP system using main configuration mode “Standard”. When will the shadow system be stopped for the last time? Please choose the correct answer. Before the downtime starts At the end of the downtime As part of the cleanup process Early in the downtime.
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par? Please choose the correct answer. An upgrade of the software components is performed, without changing the database type. A change of the database type is performed, without changing the software components. An SAP S/4HANA conversion is performed, without adapting the customer data A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)? Please choose the correct answer Credentials of a named user in client 000 of the shadow system Credentials of a named user in the development client of the development system Credentials of user DDIC in client 000 of the shadow system Credentials of user DDIC in the development client of the development system.
You download content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox? Please choose the correct answer. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode) /ASU/SSM (ASU Simple Schedule Manager) /ASU/SHOW_NOTE (Show SAP Note via Web-Browser) /ASU/START (Start ASU Toolbox).
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues? There are 2 correct answers to this question. Create "modified' versions of the objects that you need to adjust Release the transport request containing the modification adjustment Assign the transport request as a modification adjustment transport Manually activate the adjusted dictionary objects.
What do you need to know about the SAP ERP Upgrade and Update Guide? There are 2 correct answers to this question. It contains a troubleshooting section It is a target release specific It contains a section "free space requirements" It is a database-specific document.
You want to execute a Unicode Conversion only. Which approach do you need to follow? Please choose the correct answer SWPM using the Backup / Restore procedure SUM with DMO SUM without DMO SWPM using the Load procedure.
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0? There are 2 correct answers to this question. Upgrading to SAP ECC 6.08 without using DMO Using DMO when applying Support Packages to SAP ECC 6.07 SAP S/4HANA conversion to SAP S/4HANA 1709 Updating to SAP ECC 6.07 using DMO.
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison? Please choose the correct answer. It performs a comparison on selected tables using check sum. It performs a comparison on all tables using row counts. It performs a comparison of all tables using check sum. It does NOT perform any table comparison.
You are planning to upgrade your SAP ECC 6.07 non-Unicode system to SAP ECC 6.08. How can you perform this upgrade? Please choose the correct answer. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion. Combine the upgrade and the Unicode conversion using the Twin Upgrade & Unicode Conversion (TU & UC) procedure. Perform the Unicode conversion before the upgrade to SAP ECC 6.08. Combine the upgrade and the Unicode conversion using the Combined Upgrade & Unicode Conversion (CU & UC) procedure.
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results? There are 2 correct answers to this question. SYCM (Simplification Database Content) SAT (Runtime Analysis) ATC (ABAP Test Cockpit) SE80 (Object Navigator).
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase? There are 2 correct answers to this question. Run the database migration to the SAP HANA database Perform the migration of data into the new data structure Check the compatibility of custom code with SAP S/4HANA Apply the recommendations of the simplification list.
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system? Please choose the correct answer. After the SUM roadmap step "Execution" is finished and before "Postprocessing" During the SUM roadmap step "Postprocessing", after the post procedure steps are complete During the SUM roadmap step "Postprocessing", in parallel with post procedure steps After the SUM roadmap step "Postprocessing" and post procedure steps are finished.
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion? Please choose the correct answer. An additional temporary database is used during uptime Dedicated application tables are migrated in uptime TABIM_UPG is executed in uptime The repository is migrated in uptime.
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HANA. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion? There are 2 correct answers to this question. Kernel for target release, Linux, SAP HANA Kernel for target release, Windows, SAP HANA Kernel for target release, Windows, SAP MaxDB Kernel for source release, Windows, SAP MaxDB.
When using the DMO of SUM, which files can be handled by SUM in the download directory? There are 2 correct answers to this question. Parameter file SAPup_add.par Stack XML file calculated by the Maintenance Planner Breakpoint configuration file SAPUPPHAS.BRK MIGRATE_DT_DUR_XML file from a previous run.
During the SUM procedure, the phase XPRAS_AIMMRG fails. Where can you most likely see the reason for the error? There are 2 correct answers to this question. In the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp In the latest log files in the SUM directory, subdirectory ABAP, subdirectory log In the job log for the corresponding job in SM37 (Job Overview) In the corresponding R3trans log files of this phase.
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on. Following SAP recommendations, how will you achieve this? There are 2 correct answers to this question Specify the business functions that need to be switched on during the prepare part of SUM. Import a transport request from the development system that contains the recording of the activation Activate the required business functions manually in the production system. During conversion, SUM delivers some business functions already activated.
Which are valid options to check the progress of the database migration in a Microsoft Windows environment? There is correct answers to this question. Check the "Charts Control Center" in the SUM UI Check logs for jobs starting with "RSUPG_SGEN" in the system Check the log files written under "SUM\abap\log" Check the dump size of the database export on disk.
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration? There are 3 correct answers to this question Generation of the new ABAP loads in phase RUN_SGEN_GENER8 Import of upgrade and language data from the download directory in phase TABIM_UPG Activation of dictionary objects in phase ACT_UPG Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE Import of dictionary objects from the download directory in phase DDIC_UPG.
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question. Support Package Stack update Homogenous system copy Release upgrade Dual Stack split Database migration.
How does SUM recognize modification adjustment transports from predecessor systems? Please choose the correct answer By searching for transport requests that are assigned to the project SAP_ADJUST By searching for transport requests named <SID>K0<number> By searching for transport requests in DIR_TRANS, subdirectory "transport" By searching for transport requests in the file umodauto.lst.
Which are valid options to check the progress of the database migration in a standard DMO procedure? There are 2 correct answers to this question Check the dump size of the database export on disk Check logs for jobs starting with “RSUPG_SGEN” in the system Check the log files written under “SUM\abap\log Check the “Charts Control Center” in the SUM UI.
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO? There are 3 correct answers to this question. Phases DIFF* Phase DOWNCONF_DTTRANS Phase RUN_RSPTBFIL _ISUTABU Phases EU_IMPORT* Phase RUN_RSDBSCPY.
What do you need to consider when performing the pre-checks for an SAP S/4HANA conversion? There are 2 correct answers to this question. You need an SAP system based on AS ABAP 7.50 or above for the pre-checks framework Depending on the SAP S/4HANA version, there are different pre-check frameworks. The pre-checks are executed in the development system and the results are transported into the subsequent systems. You need to build up a pre-check framework by applying SAP notes.
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel. Why are 40 Process Buckets executed in parallel? Please choose the correct answer. There is a maximum of 40 parallel R3load processes within this specific downtime phase. SUM is still running in uptime; the number of 40 defined R3load processes is considered The number of CPU cores does not allow more than 40 R3load processes to be run in parallel These are 40 pairs of R3load processes, so there are 80 R3load processes running.
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities? There are 3 correct answers to this question. Apply SAP Support Packages. Upgrade the SAP system. Use DMO for SUM. Apply an Enhancement Package. Perform an SAP S/4HANA conversion including DMO.
You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)? Please choose the correct answer. Credentials of a named user in client 000 of the shadow system Credentials of a named user in the development client of the development system Credentials of user DDIC in client 000 of the shadow system Credentials of user DDIC in the development client of the development system.
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory? Please choose the correct answer The path was stored to the environment of user <sid>adm during registration The path is taken from the URL entered in the browser to start SUM The path was stored in the file host_profile during registration The path was stored in file sumabap.conf during registration.
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer. Configure it within transaction ATC Download it from SAP Support Portal Generate it by analyzing the specific custom code via RFC Apply the corresponding SAP note via SAP Note Assistant.
What are the benefits of using the Benchmarking option of the DMO for SUM? There are 2 correct answers to this question You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run. You can find the optimal number of parallel R3load processes by monitoring host performance. You can verify that the content of the download directory matches the stack.XML file. You can record the modification adjustment during migration and use the transports in the next runs.
You are upgrading a three-system landscape DEV - QAS - PRD. The upgrade project contains a Unicode conversion. You have already upgraded the DEV and the QAS system but not yet the PRD system. What do you need to consider? Please choose the correct answer. The upgrade of the PRD must be finished before you start new development in the DEV. The transport domain of systems DEV and QAS must differ from the transport domain of system PRD. The upgrade of the PRD must be finished before you import any transports from the upgraded DEV system into the PRD. The transport between Unicode and non-Unicode systems is forbidden.
Denunciar Test