How can you limit the validity of a bill of material (BOM)? (2 Correct) By industry By plant By period By mater al type.
How can you set up the supply source for the SAP Kanban process? (3 Correct) Using quotations for internal and external procurement Using run schedule quantities for in-house production Using purchasing costs for automated source prioritization Using purchase orders for external procurement Using stock transfer reservations for stock transfer.
How does the new Inventory Management Data model contribute to the reduction of the data footprint? (3 Correct) By eliminating material master tables By eliminating hybrid tables By eliminating inventory history tables By eliminating fields for different stock types By eliminating inventory tables.
How Is the bill of material (BOM) exploded when you use a BOM explosion number? With respect to defined separate key dates for product and each assembly With respect to a defined separate change status for product and each assembly With respect to a common key date for product and each assembly With respect to a common change status for product and each assembly.
How would you define pegging in the context of Advanced Planning? An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement? Fill up to the safety stock level Fill up based on the lot size procedure Fill up to the maximum stock level Fill up to the reorder stock level.
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching? Goods receipt processing time Minimum wait time Queue time Production time.
In a first step you have created master recipes. In which sequence are the additional objects created? Process order Control recipe PI sheet Process message Process message PI sheet Process order Control recipe Control recipe Process order Process message PI sheet Control recipe Process order PI sheet Process message.
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings? Kanban Transfer order Back flushing Picking list.
In Demand-Driven Replenishment, materials are classified according to several criteria. What criteria can you use? (3 Correct) Average daily usage Demand variation Usage in bill of materials Goods issue value Minimum order quantity.
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock? The item category of the component in the BOM The MRP Type of the component The Planning Strategy of the finished product The Individual/Collective indicator of the component.
In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy? Dependent Requirements indicator Mixed MRP indicator Individual/Collective Indicator Storage Location MRP Indicator.
In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate? The presence of production orders The priority of the proposed solution The presence of firmed planned orders The viability of the proposed solution.
In the Schedule Production app, which settings can you make in the planning strategy? (3 Correct) Scheduling control (finite/infinite) Direction (forward/backward) Finiteness level (0...1) Fixed pegging (on/off) Planning mode (bucket/sequence).
In which customizing activity do you set up automatic routing selection for production orders? Define selection profiles Define order-type-dependent parameter Define scheduling parameters for production orders Define production scheduling profile.
In which data object is the production line (Repetitive manufacturing relevant work center) maintained? Cost collector Production version Bill of material Repetitive manufacturing profile.
In which data objects do you maintain the production line as the work center for repetitive manufacturing? (2 Correct) Production version Production cost collector Routing Repetitive manufacturing profile.
In which material master views can you select the batch management checkbox? (2 Correct) MRP 4 Basic Data 1 Work Scheduling Purchasing.
In which of the following master data objects can you define the production order default storage location for a material component? (2 Correct) Routing, in the component allocation Material master of the finished product BOM, in the item for the material Work center, in the production supply area.
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? (2 Correct) Use a specific MRP type. Use a specific MRP controller. Use a specific material group Use a specific material status.
In your project , you have several materials that are planned by different people. How can you assign the planning responsibility? 0 MRP type MRP group MRP planning file MRP controller.
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection? When multiple operations are maintained for one product When multiple production versions are maintained for one product When multiple planned orders exist on one resource When alternate resources are used within one operation.
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order? It is converted into a schedule line. It is converted into a production order. It is converted into a reservation. It is converted into a planned order.
On which of the following levels can you influence the availability check for the components of production orders? (2 Correct) Material master MRP controller Production controller Production order type.
Production orders are used for what production type? Replenishment controlled by control cycles Discrete manufacturing processes Process manufacturing processes Period and quantity-oriented production.