TEST BORRADO, QUIZÁS LE INTERESE:
SOP E190
COMENTARIOS | ESTADÍSTICAS | RÉCORDS |
---|
REALIZAR TEST
Título del Test:
SOP E190 Descripción: Standard Operations Procedures E Jets Autor: De Luna OTROS TESTS DEL AUTOR Fecha de Creación: 22/09/2023 Categoría: Otros Número Preguntas: 5 |
COMPARTE EL TEST
COMENTAR
No hay ningún comentario sobre este test.
Temario:
Internal Safety Inspection Checklist
Select the items of the Cockpit Emergency Equipment 3 Life Vests 2 Escape Ropes. 2 Flashlights. 1 Protective Breathing Equipment (PBE) 1 Fire Extinguisher 1 Crash Axe 2 Life Vests 2 Crash Axe. 2 Protective Breathing Equipment (PBE) 1 Escape Rope. Power up checklist MIN Batteries Voltage 22V 21V Between 21V - 22V 20V 25V. Power up checklist Which range should batteries voltage have in order to be charged Between 19V -22V Less Dan 21V Between 21V - 22V Between 21V- 20V. Power up checklist How and when should batteries be charged recharge the batteries prior to takeoff, through any AC source, including engines during taxi recharge the batteries prior to takeoff, through any AC source, NOT including engines during taxi recharge the batteries prior to takeoff, through any DC source, including engines during taxi recharge the batteries prior to takeoff, through any DC source, NOT including engines during taxi. Power up checklist How much time should batteries be charged in ambient Tº is above 0º 30min 35min 40min 50min. |
Denunciar Test